“Who are you guys?” Jupiter-130,the DIRECT concept



Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt

















Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt















Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt














Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt











Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt

















Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt

















Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt















Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be ready as early as September 2012. “The bottom line is that we believe the Jupiter can close the gap in the current budget,” he said.
Metschan mentioned that a “courageous group of engineers and other concerned citizens” have worked on this, but that wasn’t sufficient for one committee member.
“Who are you guys?” asked former astronaut Leroy Chiao. “It’s difficult to assess the work without knowing who’s doing it.”"
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



NASA Watch: not a NASA Website
http://www.nasawatch.com/

Space Politics
http://www.spacepolitics.com/

Space Review
http://www.thespacereview.com/






"Shuttle program manager John Shannon said his preference is to fund the existing architecture."
The Space Review: Constellation and its challengers
http://www.thespacereview.com/article/1401/1



Replay of Review of Human Space Flight Plans Committee Hearing
June 20, June 21, 9 a.m.
Replay of Review of Human Space Flight Plans Committee News Conference
June 20, June 21, 4 p.m.


The first public meeting took place June 17 from 9 a.m. - 5 p.m. EDT
Human Space Flight Plans
Charter of the Review of U.S. Human Space Flight Plans Committee
"10. Duration: The Committee will exist for 180 days, unless earlier renewed.
11. Termination: The Committee shall terminate within 60 days after submitting its report."
Christopher J. Scolese
NASA Administrator (Acting)
Dated: June 1, 2009
http://www.nasa.gov/offices/hsf/about/charter.html
NASA Announces Members of Human Space Flight Review Committee
http://www.nasa.gov/home/hqnews/2009/jun/HQ_09-123_Augustine_Review_Members.html











1


2


3


4


5



6




7


Review of Human Space Flight Plans Committee Public Hearing
Review of Human Space Flight Plans Committee News Conference





ATLAST: Advanced Technology Large-Aperture Space Telescope

Delta IV HLV. Ares V payload to L2 = 65 mT, Delta IV HLV payload to L2 = 16 mT
ATLAST: Advanced Technology Large-Aperture Space Telescope
http://exep.jpl.nasa.gov/presentations/138-04-11-Oegerle.ppt










Jupiter-130 :the DIRECT concept

"the DIRECT concept, presented by Stephen Metschan. Depending on your point of view the committee seemed either interested in or skeptical about the idea (I heard both reactions afterwards) although the latter seemed evident in Leroy Chiao’s question to Metschan: “Who are you guys?”" Space Politics
http://www.spacepolitics.com/


The Space Review: Constellation and its challengers
"Stephen Metschan said DIRECT’s entry-level booster, the Jupiter-130, could be built for $8.3 billion―$6 billion less than Ares 1―and be r