nexus6

nexus6

STS-119: Flight Day9


Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl















Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl













Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl












Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl









Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl















Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl















Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl













Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap Up Third Spacewalk 2009年3月24日 7:13
They were unable to deploy the Port 3 unpressurized cargo carrier attachment system (UCCAS) and tied it safely in place while engineers evaluate the problem. Because the issue is not yet understood, Mission Control cancelled the installation of a similar payload attachment system on the starboard side."
http://www.nasa.gov/rss/119_update.xml


Flight Day 9


03/23/09
06:43 AM Crew wakeup
07:18 AM EVA-3: 14.7 psi repress/hygiene break
08:08 AM EVA-3: Airlock depress to 10.2 psi
08:28 AM EVA-3: Campout EVA preps
08:43 AM ISS daily planning conference
09:58 AM EVA-3: Spacesuit purge
10:13 AM EVA-3: Spacesuit prebreathe
11:13 AM EVA-3: Crew lock depressurization
11:43 AM EVA-3: Spacesuits to battery power
11:48 AM EVA-3: Airlock egress
12:13 PM EVA-3: Setup
12:33 PM EVA-3: CETA relocate
01:33 PM EVA-3/EV-1: SPDM tasks
01:33 PM EVA-3/EV-2: S1 tasks
03:03 PM EVA-3/EV-1: LEE B lube
03:43 PM EVA-3/EV-2: S0 1A-D PRCM R&R
04:48 PM SSRMS stow
05:03 PM SPDM stow
05:18 PM EVA-3/EV-1: Cleanup and ingress
05:43 PM EVA-3/EV-2: Cleanup and ingress
06:13 PM EVA-3: Airlock repressurization
06:28 PM Spacesuit servicing
07:48 PM Evening planning conference
09:43 PM ISS crew sleep begins
10:13 PM STS crew sleep begins




ISU World Figure Skating Championships | Schedule
http://www.isuworlds2009.com/schedule.php
2009 World Figure Skating Championships - Wikipedia
March 24
13:00 - 17:05 Compulsory Dance
18:15 - 18:40 Opening Ceremonies
19:00 - 23:40 Pairs Short Program
March 25
09:00 - 12:55 Men's Short Program (1st Half)
13:30 - 18:20 Men's Short Program (2nd Half)
19:00 - 23:00 Pairs Free Skating
March 26
12:30 - 16:50 Original Dance
17:35 - 21:45 Men's Free Skating
March 27
08:45 - 12:50 Ladies Short Program (1st Half)
13:20 - 17:30 Ladies Short Program (2nd Half)
18:30 - 23:00 Free Dance
March 28
16:00 - 20:00 Ladies Free Skating
March 29
14:00 - 16:30 Gala Exhibition"
http://en.wikipedia.org/wiki/2009_World_Figure_Skating_Championships


2009 世界フィギュアスケート選手権大会
〜29日アメリカ・ロサンゼルス"
http://www.skatingjapan.or.jp/jsf07-08/figure/index.html
フィギュアスケートYoutube-動画Blog
http://skating.livedoor.biz/




グーグル、人工衛星「GeoEye-1」からの画像を提供開始:CNET Japan
"GeoEyeは2008年9月にGeoEye-1を打ち上げた。また同社は2011年に、より高解像度なカメラを備えた別の人工衛星の打ち上げを計画している。しかし、米国政府はGoogleが提供する画像の解像度を50cmに制限"
http://japan.cnet.com/marketing/story/0,3800080523,20390280,00.htm?tag=nl








Soyuz TMA-14 Rollout to Launch Pad:

Soyuz TMA-14 Rollout to Launch Pad: Baikonur, Kazakhstan





"Astronauts' spacewalk repair fails "
3/24/2009 8:59:21 PM
The cargo platform, by some strange circumstance, was left jammed - after a locking pin had been installed upside down on an earlier spacewalk. Using a hammer, Acaba and Arnold managed to loosen the pin, that Acaba and another astronaut accidentally inserted upside down on the platform during Saturday's spacewalk. But the shelf mechanism just would not extend into the proper position.
http://www.timesnow.tv/NewsDtls.aspx?NewsID=33127


STS-119 Mission Update
"Astronauts Wrap U