nexus6

nexus6

Shanghai Expo 2010 閉幕


STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/








































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/






































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/





































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#











STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/








































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/






































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/





































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#










STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/








































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/






































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/





































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver photography of
Discovery’s thermal protection system by
Expedition 25 crew members Fyodor
Yurchikhin and Shannon Walker
Docking to Harmony/pressurized mating
adapter 2
Hatch opening and welcoming
Canadarm2 grapple of Express Logistics
Carrier 4 (ELC4) cargo pallet, handoff to
shuttle robotic arm, and handoff back to
Canadarm2 for installation on the starboard
3 lower inboard attachment system


Flight Day 4
Cargo transfer
OBSS handoff from Canadarm2 to shuttle
robotic arm
Spacewalk tool preparation
Spacewalk 1 preparations by Kopra and
Drew
Spacewalk 1 procedure review
Spacewalk 1 campout by Kopra and Drew in
the Quest airlock


Flight Day 5
Spacewalk 1 by Kopra and Drew
(J612 power extension cable installation from
Unity to Tranquility, transfer of failed pump
module from the payload attachment
bracket on the mobile base system to
external stowage platform 2, installation of a
wedge for camera port 3 and installation of
starboard crew equipment and translation
aid (CETA) cart rail stubs)


Flight Day 6
Installation of the Permanent Multipurpose
Module (PMM) to the nadir, or Earth-facing,
port of Unity
Focused inspection of Discovery’s thermal
protection heat shield, if required
Spacewalk 2 preparations by Kopra and
Drew
Spacewalk 2 procedure review
Spacewalk 2 campout by Kopra and Drew in
the Quest airlock


Flight Day 7
PMM ingress and internal outfitting
Spacewalk 2 by Kopra and Drew (removal of
thermal insulation from the ELC4,
installation of CETA lights, troubleshooting
of the port 1 truss radiator stowage beam
bracket, removal and replacement of a cargo
adapter plate on Columbus, installation of a
pan and tilt unit on a camera on Dextre and
removal of thermal covers)


Flight Day 8
Cargo transfer to station from the PMM
Crew off duty time


Flight Day 9
Reconfiguration of spacewalk equipment
Joint crew news conference
Crew off-duty time
Rendezvous tools checkout
Farewells and hatch closure
Centerline camera installation


Flight Day 10
Discovery’s final undocking from station an
fly-around
Final separation from the station
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth


Flight Day 11
Cabin stowage
Flight control system checkout
Reaction control system hot-fire test
Deorbit preparation briefing
Ku-band antenna stowage


Flight Day 12
Deorbit preparations
Payload bay door closing
Deorbit burn
Discovery’s final landing at KSC




Hints of lightweight dark matter particle found in space - New Scientist
http://www.newscientist.com/article/dn19655-hints-of-lightweight-dark-matter-particle-found-in-space.html










Shanghai Expo 2010 閉幕
上海エクスポ 閉幕式
World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/



ブラジル大統領選:31日の決選投票に 過半数届かず - 毎日新聞
現政権与党 労働者党(PT)ジルマ・ロウセフ46・88%女性大統領候補
野党ブラジル民主社会党(PSDB)のジョゼ・セーラ32・62%


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html
第1回 関内ハイカラ市)
馬車道まつりの開催に合わせ『アート市』などを実施。
関内まちづくり振興会
http://kannai.or.jp/



clamwin
http://www.clamwin.com/index.php?option=content&task=view&id=40&Itemid=60&version=0.96.2.1

siteadvisor
http://www.siteadvisor.com/download/windows.html#




Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


馬車道まつり
2010/10/31(日)〜2010/11/03(水)
開港横浜の歴史と文化を楽しむお祭り。
11/3には馬車や人力車も。
会場: 馬車道通り  馬車道商店街
http://www.bashamichi.or.jp/jimukyoku/whatnew.html

































Shanghai Expo 2010 閉幕

World Expo Shanghai 2010 (May 1 - Oct. 31)
English_Xinhua
http://www.chinaview.cn/expo2010/


































STS-133 - NASA
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/index.html


Flight Day 1
Launch
Payload bay door opening
Ku-band antenna deployment
Shuttle robotic arm activation and payload
bay survey
Umbilical well and handheld external tank
photo and TV downlink


Flight Day 2
Discovery’s thermal protection system
survey with shuttle robotic arm/orbiter
boom sensor system (OBSS)
Extravehicular mobility unit, or spacesuit,
checkout
Centerline camera installation
Orbiter docking system ring extension
Orbital maneuvering system pod survey
Rendezvous tools checkout


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous pitch maneuver pho