nexus6

nexus6

ISS docking


5/16

06:07AM NC-4 rendezvous rocket firing
07:39AM TI rendezvous rocket firing
08:56AM MC-4 burn
10:27AM ISS docking



Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout

Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Expedition 23 crew members Creamer and
Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of Integrated Cargo
Carrier, unberthing from Atlantis’ payload
bay and temporary park on the Mobile Base
System’s payload attachment device
Spacewalk 1 preparations by Reisman
and Bowen
Spacewalk 1 procedure review
Spacewalk 1 campout by Reisman and
Bowen in the Quest airlock

Flight Day 4
Spacewalk 1 by Reisman and Bowen
(Installation of the backup Space-to-Ground
Antenna on the Z1 truss and installation of a
new tool platform on the Dextre robot)

Flight Day 5
Unberth of the Russian Rassvet module from
Atlantis’ payload bay and installation on the
Earth-facing port of the Zarya module
Canadarm unberth of the Orbiter Boom
Sensor System and handoff to the shuttle’s
robotic arm
Focused inspection of Atlantis’ thermal
protection heat shield, if required
Spacewalk 2 preparations by Bowen and
Good
Spacewalk 2 procedure review
Spacewalk 2 campout by Bowen and Good
in the Quest airlock


Flight Day 6
Canadarm 2 removal of the Integrated Cargo
Carrier from the Mobile Base System
attachment device and relocation at the
Spacewalk 2 worksite
Spacewalk 2 by Bowen and Good (remove
and replace three of the six batteries in the
P6 truss)

Flight Day 7
Middeck cargo transfer from Atlantis to
the space station
Rassvet/Zarya leak checks and Rassvet hatch
opening for air duct installation (complete
outfitting of Rassvet will be delayed until
after Atlantis departs)
Crew off duty period
Spacewalk 3 preparations by Reisman
and Good
Spacewalk 3 procedure review
Spacewalk 3 campout by Reisman and
Good in the Quest airlock

Flight Day 8
Spacewalk 3 by Reisman and Good (remove
and replace the last three batteries on the P6
truss and, if time permits, retrieve a spare
Power and Data Grapple Fixture from the
sidewall of Atlantis’ payload bay to be
brought inside the station)
Canadarm 2 returns the Integrated Cargo
Carrier to the Mobile Base System
attachment device

Flight Day 9
Canadarm 2 berths the Integrated Cargo
Carrier in Atlantis’ cargo bay
Middeck cargo transfer from Atlantis to
the station
Crew off duty time

Flight Day 10
Final middeck cargo transfer from Atlantis
to the station
Rendezvous Tool Checkout
Joint Crew News Conference
Farewells and Hatch Closure
Centerline Camera installation
Atlantis undocking from station and
flyaround
Final separation from the station

Flight Day 11
OBSS late inspection of Atlantis’ thermal
heat shield
OBSS berth

Flight Day 12
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
MAY 2010 TIMELINE OVERVIEW 15

Flight Day 13
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing




Last“Missing” Normal Matter Is Found-SkyandTelescope.com
http://www.skyandtelescope.com/community/skyblog/newsblog/93797364.html
X-ray Discovery Points to Location of Missing Matter
Chandra :: Photo Album :: H2356-309 :: 11 May 10
http://chandra.harvard.edu/photo/2010/h2356/


X-ray discovery points to location of missing matter in universe
"Warm-Hot Intergalactic Medium (WHIM). Scientists think the WHIM is material left over after the formation of galaxies, which was later enriched by elements blown out of galaxies."
http://www.sciencedaily.com/releases/2010/05/100511122745.htm
The Sculptor Wall- NASA
http://www.nasa.gov/mission_pages/chandra/multimedia/photo10-048.html
X-ray discovery points to location of missing matter
http://www.physorg.com/news192799714.html
Chandra, XMM-Newton Eye Possible Location Of Missing Matter - Space News - redOrbit
http://www.redorbit.com/news/space/1863770/chandra_xmmnewton_eye_possible_location_of_missing_matter/index.html?source=r_space
X-Ray Observations Find Evidence for "Missing Matter" in the Universe | Universe Today
http://www.universetoday.com/2010/05/11/x-ray-observations-find-evidence-for-missing-matter-in-the-universe/





NASA Funds Development of Destiny: The Dark Energy Space Telescope: NOAO Press Release 06-10
http://www.noao.edu/outreach/press/pr06/pr0610.html
Astronomy Without a Telescope – Making Sense Of The Neutron Zoo | Universe Today
http://www.universetoday.com/2010/05/15/astronomy-without-a-telescope-making-sense-of-the-neutron-zoo/





日本財政の借金、5年後にGDP比250% IMF予測 (朝日新聞社
国際通貨基金IMFは14日、世界各国の財政見通しに関する報告書を発表
日本の債務残高の対国内総生産(GDP)比率は、2015年に主要国や新興国のなかで最悪の250%に達すると予測。
現在5%の消費税を倍の10%に引き上げれば、毎年GDP比で2.6%分の増収につながると指摘。事実上、日本に消費税引き上げを提言した。"
http://www.asahi.com/politics/update/0515/TKY201005150184.html


Adobe fights Apple with pro-Flash ad campaign | CNET News
http://news.cnet.com/8301-30685_3-20004884-264.html


Flex SDK- Adobe Open Source
http://opensource.adobe.com/wiki/display/site/Home
AdobeFlashのオープン性を主張するキャンペーン開始:ITpro
http://itpro.nikkeibp.co.jp/article/NEWS/20100514/347990/


Rudy’s Blog SF and Quantum Mechanics, #2
http://www.rudyrucker.com/blog/2010/05/13/sf-and-quantum-mechanics-2/






5/16

06:07AM NC-4 rendezvous rocket firing
07:39AM TI rendezvous rocket firing
08:56AM MC-4 burn
10:27AM ISS docking



Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout

Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Expedition 23 crew members Creamer and
Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of Integrated Cargo
Carrier, unberthing from Atlantis’ payload
bay and temporary park on the Mobile Base
System’s payload attachment device
Spacewalk 1 preparations by Reisman
and Bowen
Spacewalk 1 procedure review
Spacewalk 1 campout by Reisman and
Bowen in the Quest airlock

Flight Day 4
Spacewalk 1 by Reisman and Bowen
(Installation of the backup Space-to-Ground
Antenna on the Z1 truss and installation of a
new tool platform on the Dextre robot)

Flight Day 5
Unberth of the Russian Rassvet module from
Atlantis’ payload bay and installation on the
Earth-facing port of the Zarya module
Canadarm unberth of the Orbiter Boom
Sensor System and handoff to the shuttle’s
robotic arm
Focused inspection of Atlantis’ thermal
protection heat shield, if required
Spacewalk 2 preparations by Bowen and
Good
Spacewalk 2 procedure review
Spacewalk 2 campout by Bowen and Good
in the Quest airlock


Flight Day 6
Canadarm 2 removal of the Integrated Cargo
Carrier from the Mobile Base System
attachment device and relocation at the
Spacewalk 2 worksite
Spacewalk 2 by Bowen and Good (remove
and replace three of the six batteries in the
P6 truss)

Flight Day 7
Middeck cargo transfer from Atlantis to
the space station
Rassvet/Zarya leak checks and Rassvet hatch
opening for air duct installation (complete
outfitting of Rassvet will be delayed until
after Atlantis departs)
Crew off duty period
Spacewalk 3 preparations by Reisman
and Good
Spacewalk 3 procedure review
Spacewalk 3 campout by Reisman and
Good in the Quest airlock

Flight Day 8
Spacewalk 3 by Reisman and Good (remove
and replace the last three batteries on the P6
truss and, if time permits, retrieve a spare
Power and Data Grapple Fixture from the
sidewall of Atlantis’ payload bay to be
brought inside the station)
Canadarm 2 returns the Integrated Cargo
Carrier to the Mobile Base System
attachment device

Flight Day 9
Canadarm 2 berths the Integrated Cargo
Carrier in Atlantis’ cargo bay
Middeck cargo transfer from Atlantis to
the station
Crew off duty time

Flight Day 10
Final middeck cargo transfer from Atlantis
to the station
Rendezvous Tool Checkout
Joint Crew News Conference
Farewells and Hatch Closure
Centerline Camera installation
Atlantis undocking from station and
flyaround
Final separation from the station

Flight Day 11
OBSS late inspection of Atlantis’ thermal
heat shield
OBSS berth

Flight Day 12
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
MAY 2010 TIMELINE OVERVIEW 15

Flight Day 13
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing




Last“Missing” Normal Matter Is Found-SkyandTelescope.com
http://www.skyandtelescope.com/community/skyblog/newsblog/93797364.html
X-ray Discovery Points to Location of Missing Matter
Chandra :: Photo Album :: H2356-309 :: 11 May 10
http://chandra.harvard.edu/photo/2010/h2356/


X-ray discovery points to location of missing matter in universe
"Warm-Hot Intergalactic Medium (WHIM). Scientists think the WHIM is material left over after the formation of galaxies, which was later enriched by elements blown out of galaxies."
http://www.sciencedaily.com/releases/2010/05/100511122745.htm
The Sculptor Wall- NASA
http://www.nasa.gov/mission_pages/chandra/multimedia/photo10-048.html
X-ray discovery points to location of missing matter
http://www.physorg.com/news192799714.html
Chandra, XMM-Newton Eye Possible Location Of Missing Matter - Space News - redOrbit
http://www.redorbit.com/news/space/1863770/chandra_xmmnewton_eye_possible_location_of_missing_matter/index.html?source=r_space
X-Ray Observations Find Evidence for "Missing Matter" in the Universe | Universe Today
http://www.universetoday.com/2010/05/11/x-ray-observations-find-evidence-for-missing-matter-in-the-universe/





NASA Funds Development of Destiny: The Dark Energy Space Telescope: NOAO Press Release 06-10
http://www.noao.edu/outreach/press/pr06/pr0610.html
Astronomy Without a Telescope – Making Sense Of The Neutron Zoo | Universe Today
http://www.universetoday.com/2010/05/15/astronomy-without-a-telescope-making-sense-of-the-neutron-zoo/





日本財政の借金、5年後にGDP比250% IMF予測 (朝日新聞社
国際通貨基金IMFは14日、世界各国の財政見通しに関する報告書を発表
日本の債務残高の対国内総生産(GDP)比率は、2015年に主要国や新興国のなかで最悪の250%に達すると予測。
現在5%の消費税を倍の10%に引き上げれば、毎年GDP比で2.6%分の増収につながると指摘。事実上、日本に消費税引き上げを提言した。"
http://www.asahi.com/politics/update/0515/TKY201005150184.html


Adobe fights Apple with pro-Flash ad campaign | CNET News
http://news.cnet.com/8301-30685_3-20004884-264.html


Flex SDK- Adobe Open Source
http://opensource.adobe.com/wiki/display/site/Home
AdobeFlashのオープン性を主張するキャンペーン開始:ITpro
http://itpro.nikkeibp.co.jp/article/NEWS/20100514/347990/


Rudy’s Blog SF and Quantum Mechanics, #2
http://www.rudyrucker.com/blog/2010/05/13/sf-and-quantum-mechanics-2/







世襲リスト
世襲議員族議員 131名
http://www.kyudan.com/data/seshu2.htm
【た】
竹下亘 島根2区、自民党 兄は竹下登 衆議院議員
橘康太郎  比例区北陸信越自民党 父親は橘直治 参議院議員
田中眞紀子 新潟5区民主党 父親は田中角栄 衆議院議員
棚橋泰文 岐阜2区、自民党 祖父は松野幸泰 衆議院議員
谷公一 兵庫5区、自民党 父親は谷洋一 衆議院議員
谷垣禎一 京都5区、自民党 父親は谷垣専一 衆議院議員
玉置一弥 比例区近畿、民主党 父親は玉置一徳 衆議院議員
田村憲久 三重4区、自民党 伯父は田村元 衆議院議員

















5/16

06:07AM NC-4 rendezvous rocket firing
07:39AM TI rendezvous rocket firing
08:56AM MC-4 burn
10:27AM ISS docking



Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout

Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Expedition 23 crew members Creamer and
Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of Integrated Cargo
Carrier, unberthing from Atlantis’ payload
bay and temporary park on the Mobile Base
System’s payload attachment device
Spacewalk 1 preparations by Reisman
and Bowen
Spacewalk 1 procedure review
Spacewalk 1 campout by Reisman and
Bowen in the Quest airlock

Flight Day 4
Spacewalk 1 by Reisman and Bowen
(Installation of the backup Space-to-Ground
Antenna on the Z1 truss and installation of a
new tool platform on the Dextre robot)

Flight Day 5
Unberth of the Russian Rassvet module from
Atlantis’ payload bay and installation on the
Earth-facing port of the Zarya module
Canadarm unberth of the Orbiter Boom
Sensor System and handoff to the shuttle’s
robotic arm
Focused inspection of Atlantis’ thermal
protection heat shield, if required
Spacewalk 2 preparations by Bowen and
Good
Spacewalk 2 procedure review
Spacewalk 2 campout by Bowen and Good
in the Quest airlock


Flight Day 6
Canadarm 2 removal of the Integrated Cargo
Carrier from the Mobile Base System
attachment device and relocation at the
Spacewalk 2 worksite
Spacewalk 2 by Bowen and Good (remove
and replace three of the six batteries in the
P6 truss)

Flight Day 7
Middeck cargo transfer from Atlantis to
the space station
Rassvet/Zarya leak checks and Rassvet hatch
opening for air duct installation (complete
outfitting of Rassvet will be delayed until
after Atlantis departs)
Crew off duty period
Spacewalk 3 preparations by Reisman
and Good
Spacewalk 3 procedure review
Spacewalk 3 campout by Reisman and
Good in the Quest airlock

Flight Day 8
Spacewalk 3 by Reisman and Good (remove
and replace the last three batteries on the P6
truss and, if time permits, retrieve a spare
Power and Data Grapple Fixture from the
sidewall of Atlantis’ payload bay to be
brought inside the station)
Canadarm 2 returns the Integrated Cargo
Carrier to the Mobile Base System
attachment device

Flight Day 9
Canadarm 2 berths the Integrated Cargo
Carrier in Atlantis’ cargo bay
Middeck cargo transfer from Atlantis to
the station
Crew off duty time

Flight Day 10
Final middeck cargo transfer from Atlantis
to the station
Rendezvous Tool Checkout
Joint Crew News Conference
Farewells and Hatch Closure
Centerline Camera installation
Atlantis undocking from station and
flyaround
Final separation from the station

Flight Day 11
OBSS late inspection of Atlantis’ thermal
heat shield
OBSS berth

Flight Day 12
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
MAY 2010 TIMELINE OVERVIEW 15

Flight Day 13
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing




Last“Missing” Normal Matter Is Found-SkyandTelescope.com
http://www.skyandtelescope.com/community/skyblog/newsblog/93797364.html
X-ray Discovery Points to Location of Missing Matter
Chandra :: Photo Album :: H2356-309 :: 11 May 10
http://chandra.harvard.edu/photo/2010/h2356/


X-ray discovery points to location of missing matter in universe
"Warm-Hot Intergalactic Medium (WHIM). Scientists think the WHIM is material left over after the formation of galaxies, which was later enriched by elements blown out of galaxies."
http://www.sciencedaily.com/releases/2010/05/100511122745.htm
The Sculptor Wall- NASA
http://www.nasa.gov/mission_pages/chandra/multimedia/photo10-048.html
X-ray discovery points to location of missing matter
http://www.physorg.com/news192799714.html
Chandra, XMM-Newton Eye Possible Location Of Missing Matter - Space News - redOrbit
http://www.redorbit.com/news/space/1863770/chandra_xmmnewton_eye_possible_location_of_missing_matter/index.html?source=r_space
X-Ray Observations Find Evidence for "Missing Matter" in the Universe | Universe Today
http://www.universetoday.com/2010/05/11/x-ray-observations-find-evidence-for-missing-matter-in-the-universe/





NASA Funds Development of Destiny: The Dark Energy Space Telescope: NOAO Press Release 06-10
http://www.noao.edu/outreach/press/pr06/pr0610.html
Astronomy Without a Telescope – Making Sense Of The Neutron Zoo | Universe Today
http://www.universetoday.com/2010/05/15/astronomy-without-a-telescope-making-sense-of-the-neutron-zoo/





日本財政の借金、5年後にGDP比250% IMF予測 (朝日新聞社
国際通貨基金IMFは14日、世界各国の財政見通しに関する報告書を発表
日本の債務残高の対国内総生産(GDP)比率は、2015年に主要国や新興国のなかで最悪の250%に達すると予測。
現在5%の消費税を倍の10%に引き上げれば、毎年GDP比で2.6%分の増収につながると指摘。事実上、日本に消費税引き上げを提言した。"
http://www.asahi.com/politics/update/0515/TKY201005150184.html


Adobe fights Apple with pro-Flash ad campaign | CNET News
http://news.cnet.com/8301-30685_3-20004884-264.html


Flex SDK- Adobe Open Source
http://opensource.adobe.com/wiki/display/site/Home
AdobeFlashのオープン性を主張するキャンペーン開始:ITpro
http://itpro.nikkeibp.co.jp/article/NEWS/20100514/347990/


Rudy’s Blog SF and Quantum Mechanics, #2
http://www.rudyrucker.com/blog/2010/05/13/sf-and-quantum-mechanics-2/






5/16

06:07AM NC-4 rendezvous rocket firing
07:39AM TI rendezvous rocket firing
08:56AM MC-4 burn
10:27AM ISS docking



Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout

Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Expedition 23 crew members Creamer and
Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of Integrated Cargo
Carrier, unberthing from Atlantis’ payload
bay and temporary park on the Mobile Base
System’s payload attachment device
Spacewalk 1 preparations by Reisman
and Bowen
Spacewalk 1 procedure review
Spacewalk 1 campout by Reisman and
Bowen in the Quest airlock

Flight Day 4
Spacewalk 1 by Reisman and Bowen
(Installation of the backup Space-to-Ground
Antenna on the Z1 truss and installation of a
new tool platform on the Dextre robot)

Flight Day 5
Unberth of the Russian Rassvet module from
Atlantis’ payload bay and installation on the
Earth-facing port of the Zarya module
Canadarm unberth of the Orbiter Boom
Sensor System and handoff to the shuttle’s
robotic arm
Focused inspection of Atlantis’ thermal
protection heat shield, if required
Spacewalk 2 preparations by Bowen and
Good
Spacewalk 2 procedure review
Spacewalk 2 campout by Bowen and Good
in the Quest airlock


Flight Day 6
Canadarm 2 removal of the Integrated Cargo
Carrier from the Mobile Base System
attachment device and relocation at the
Spacewalk 2 worksite
Spacewalk 2 by Bowen and Good (remove
and replace three of the six batteries in the
P6 truss)

Flight Day 7
Middeck cargo transfer from Atlantis to
the space station
Rassvet/Zarya leak checks and Rassvet hatch
opening for air duct installation (complete
outfitting of Rassvet will be delayed until
after Atlantis departs)
Crew off duty period
Spacewalk 3 preparations by Reisman
and Good
Spacewalk 3 procedure review
Spacewalk 3 campout by Reisman and
Good in the Quest airlock

Flight Day 8
Spacewalk 3 by Reisman and Good (remove
and replace the last three batteries on the P6
truss and, if time permits, retrieve a spare
Power and Data Grapple Fixture from the
sidewall of Atlantis’ payload bay to be
brought inside the station)
Canadarm 2 returns the Integrated Cargo
Carrier to the Mobile Base System
attachment device

Flight Day 9
Canadarm 2 berths the Integrated Cargo
Carrier in Atlantis’ cargo bay
Middeck cargo transfer from Atlantis to
the station
Crew off duty time

Flight Day 10
Final middeck cargo transfer from Atlantis
to the station
Rendezvous Tool Checkout
Joint Crew News Conference
Farewells and Hatch Closure
Centerline Camera installation
Atlantis undocking from station and
flyaround
Final separation from the station

Flight Day 11
OBSS late inspection of Atlantis’ thermal
heat shield
OBSS berth

Flight Day 12
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
MAY 2010 TIMELINE OVERVIEW 15

Flight Day 13
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing




Last“Missing” Normal Matter Is Found-SkyandTelescope.com
http://www.skyandtelescope.com/community/skyblog/newsblog/93797364.html
X-ray Discovery Points to Location of Missing Matter
Chandra :: Photo Album :: H2356-309 :: 11 May 10
http://chandra.harvard.edu/photo/2010/h2356/


X-ray discovery points to location of missing matter in universe
"Warm-Hot Intergalactic Medium (WHIM). Scientists think the WHIM is material left over after the formation of galaxies, which was later enriched by elements blown out of galaxies."
http://www.sciencedaily.com/releases/2010/05/100511122745.htm
The Sculptor Wall- NASA
http://www.nasa.gov/mission_pages/chandra/multimedia/photo10-048.html
X-ray discovery points to location of missing matter
http://www.physorg.com/news192799714.html
Chandra, XMM-Newton Eye Possible Location Of Missing Matter - Space News - redOrbit
http://www.redorbit.com/news/space/1863770/chandra_xmmnewton_eye_possible_location_of_missing_matter/index.html?source=r_space
X-Ray Observations Find Evidence for "Missing Matter" in the Universe | Universe Today
http://www.universetoday.com/2010/05/11/x-ray-observations-find-evidence-for-missing-matter-in-the-universe/





NASA Funds Development of Destiny: The Dark Energy Space Telescope: NOAO Press Release 06-10
http://www.noao.edu/outreach/press/pr06/pr0610.html
Astronomy Without a Telescope – Making Sense Of The Neutron Zoo | Universe Today
http://www.universetoday.com/2010/05/15/astronomy-without-a-telescope-making-sense-of-the-neutron-zoo/





日本財政の借金、5年後にGDP比250% IMF予測 (朝日新聞社
国際通貨基金IMFは14日、世界各国の財政見通しに関する報告書を発表
日本の債務残高の対国内総生産(GDP)比率は、2015年に主要国や新興国のなかで最悪の250%に達すると予測。
現在5%の消費税を倍の10%に引き上げれば、毎年GDP比で2.6%分の増収につながると指摘。事実上、日本に消費税引き上げを提言した。"
http://www.asahi.com/politics/update/0515/TKY201005150184.html


Adobe fights Apple with pro-Flash ad campaign | CNET News
http://news.cnet.com/8301-30685_3-20004884-264.html


Flex SDK- Adobe Open Source
http://opensource.adobe.com/wiki/display/site/Home
AdobeFlashのオープン性を主張するキャンペーン開始:ITpro
http://itpro.nikkeibp.co.jp/article/NEWS/20100514/347990/


Rudy’s Blog SF and Quantum Mechanics, #2
http://www.rudyrucker.com/blog/2010/05/13/sf-and-quantum-mechanics-2/







世襲リスト
世襲議員族議員 131名
http://www.kyudan.com/data/seshu2.htm
【た】
竹下亘 島根2区、自民党 兄は竹下登 衆議院議員
橘康太郎  比例区北陸信越自民党 父親は橘直治 参議院議員
田中眞紀子 新潟5区民主党 父親は田中角栄 衆議院議員
棚橋泰文 岐阜2区、自民党 祖父は松野幸泰 衆議院議員
谷公一 兵庫5区、自民党 父親は谷洋一 衆議院議員
谷垣禎一 京都5区、自民党 父親は谷垣専一 衆議院議員
玉置一弥 比例区近畿、民主党 父親は玉置一徳 衆議院議員
田村憲久 三重4区、自民党 伯父は田村元 衆議院議員















5/16

06:07AM NC-4 rendezvous rocket firing
07:39AM TI rendezvous rocket firing
08:56AM MC-4 burn
10:27AM ISS docking



Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout

Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Expedition 23 crew members Creamer and
Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of Integrated Cargo
Carrier, unberthing from Atlantis’ payload
bay and temporary park on the Mobile Base
System’s payload attachment device
Spacewalk 1 preparations by Reisman
and Bowen
Spacewalk 1 procedure review
Spacewalk 1 campout by Reisman and
Bowen in the Quest airlock

Flight Day 4
Spacewalk 1 by Reisman and Bowen
(Installation of the backup Space-to-Ground
Antenna on the Z1 truss and installation of a
new tool platform on the Dextre robot)

Flight Day 5
Unberth of the Russian Rassvet module from
Atlantis’ payload bay and installation on the
Earth-facing port of the Zarya module
Canadarm unberth of the Orbiter Boom
Sensor System and handoff to the shuttle’s
robotic arm
Focused inspection of Atlantis’ thermal
protection heat shield, if required
Spacewalk 2 preparations by Bowen and
Good
Spacewalk 2 procedure review
Spacewalk 2 campout by Bowen and Good
in the Quest airlock


Flight Day 6
Canadarm 2 removal of the Integrated Cargo
Carrier from the Mobile Base System
attachment device and relocation at the
Spacewalk 2 worksite
Spacewalk 2 by Bowen and Good (remove
and replace three of the six batteries in the
P6 truss)

Flight Day 7
Middeck cargo transfer from Atlantis to
the space station
Rassvet/Zarya leak checks and Rassvet hatch
opening for air duct installation (complete
outfitting of Rassvet will be delayed until
after Atlantis departs)
Crew off duty period
Spacewalk 3 preparations by Reisman
and Good
Spacewalk 3 procedure review
Spacewalk 3 campout by Reisman and
Good in the Quest airlock

Flight Day 8
Spacewalk 3 by Reisman and Good (remove
and replace the last three batteries on the P6
truss and, if time permits, retrieve a spare
Power and Data Grapple Fixture from the
sidewall of Atlantis’ payload bay to be
brought inside the station)
Canadarm 2 returns the Integrated Cargo
Carrier to the Mobile Base System
attachment device

Flight Day 9
Canadarm 2 berths the Integrated Cargo
Carrier in Atlantis’ cargo bay
Middeck cargo transfer from Atlantis to
the station
Crew off duty time

Flight Day 10
Final middeck cargo transfer from Atlantis
to the station
Rendezvous Tool Checkout
Joint Crew News Conference
Farewells and Hatch Closure
Centerline Camera installation
Atlantis undocking from station and
flyaround
Final separation from the station

Flight Day 11
OBSS late inspection of Atlantis’ thermal
heat shield
OBSS berth

Flight Day 12
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
MAY 2010 TIMELINE OVERVIEW 15

Flight Day 13
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing




Last“Missing” Normal Matter Is Found-SkyandTelescope.com
http://www.skyandtelescope.com/community/skyblog/newsblog/93797364.html
X-ray Discovery Points to Location of Missing Matter
Chandra :: Photo Album :: H2356-309 :: 11 May 10
http://chandra.harvard.edu/photo/2010/h2356/


X-ray discovery points to location of missing matter in universe
"Warm-Hot Intergalactic Medium (WHIM). Scientists think the WHIM is material left over after the formation of galaxies, which was later enriched by elements blown out of galaxies."
http://www.sciencedaily.com/releases/2010/05/100511122745.htm
The Sculptor Wall- NASA
http://www.nasa.gov/mission_pages/chandra/multimedia/photo10-048.html
X-ray discovery points to location of missing matter
http://www.physorg.com/news192799714.html
Chandra, XMM-Newton Eye Possible Location Of Missing Matter - Space News - redOrbit
http://www.redorbit.com/news/space/1863770/chandra_xmmnewton_eye_possible_location_of_missing_matter/index.html?source=r_space
X-Ray Observations Find Evidence for "Missing Matter" in the Universe | Universe Today
http://www.universetoday.com/2010/05/11/x-ray-observations-find-evidence-for-missing-matter-in-the-universe/





NASA Funds Development of Destiny: The Dark Energy Space Telescope: NOAO Press Release 06-10
http://www.noao.edu/outreach/press/pr06/pr0610.html
Astronomy Without a Telescope – Making Sense Of The Neutron Zoo | Universe Today
http://www.universetoday.com/2010/05/15/astronomy-without-a-telescope-making-sense-of-the-neutron-zoo/





日本財政の借金、5年後にGDP比250% IMF予測 (朝日新聞社
国際通貨基金IMFは14日、世界各国の財政見通しに関する報告書を発表
日本の債務残高の対国内総生産(GDP)比率は、2015年に主要国や新興国のなかで最悪の250%に達すると予測。
現在5%の消費税を倍の10%に引き上げれば、毎年GDP比で2.6%分の増収につながると指摘。事実上、日本に消費税引き上げを提言した。"
http://www.asahi.com/politics/update/0515/TKY201005150184.html


Adobe fights Apple with pro-Flash ad campaign | CNET News
http://news.cnet.com/8301-30685_3-20004884-264.html


Flex SDK- Adobe Open Source
http://opensource.adobe.com/wiki/display/site/Home
AdobeFlashのオープン性を主張するキャンペーン開始:ITpro
http://itpro.nikkeibp.co.jp/article/NEWS/20100514/347990/


Rudy’s Blog SF and Quantum Mechanics, #2
http://www.rudyrucker.com/blog/2010/05/13/sf-and-quantum-mechanics-2/






5/16

06:07AM NC-4 rendezvous rocket firing
07:39AM TI rendezvous rocket firing
08:56AM MC-4 burn
10:27AM ISS docking



Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout

Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Expedition 23 crew members Creamer and
Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of Integrated Cargo
Carrier, unberthing from Atlantis’ payload
bay and temporary park on the Mobile Base
System’s payload attachment device
Spacewalk 1 preparations by Reisman
and Bowen
Spacewalk 1 procedure review
Spacewalk 1 campout by Reisman and
Bowen in the Quest airlock

Flight Day 4
Spacewalk 1 by Reisman and Bowen
(Installation of the backup Space-to-Ground
Antenna on the Z1 truss and installation of a
new tool platform on the Dextre robot)

Flight Day 5
Unberth of the Russian Rassvet module from
Atlantis’ payload bay and installation on the
Earth-facing port of the Zarya module
Canadarm unberth of the Orbiter Boom
Sensor System and handoff to the shuttle’s
robotic arm
Focused inspection of Atlantis’ thermal
protection heat shield, if required
Spacewalk 2 preparations by Bowen and
Good
Spacewalk 2 procedure review
Spacewalk 2 campout by Bowen and Good
in the Quest airlock


Flight Day 6
Canadarm 2 removal of the Integrated Cargo
Carrier from the Mobile Base System
attachment device and relocation at the
Spacewalk 2 worksite
Spacewalk 2 by Bowen and Good (remove
and replace three of the six batteries in the
P6 truss)

Flight Day 7
Middeck cargo transfer from Atlantis to
the space station
Rassvet/Zarya leak checks and Rassvet hatch
opening for air duct installation (complete
outfitting of Rassvet will be delayed until
after Atlantis departs)
Crew off duty period
Spacewalk 3 preparations by Reisman
and Good
Spacewalk 3 procedure review
Spacewalk 3 campout by Reisman and
Good in the Quest airlock

Flight Day 8
Spacewalk 3 by Reisman and Good (remove
and replace the last three batteries on the P6
truss and, if time permits, retrieve a spare
Power and Data Grapple Fixture from the
sidewall of Atlantis’ payload bay to be
brought inside the station)
Canadarm 2 returns the Integrated Cargo
Carrier to the Mobile Base System
attachment device

Flight Day 9
Canadarm 2 berths the Integrated Cargo
Carrier in Atlantis’ cargo bay
Middeck cargo transfer from Atlantis to
the station
Crew off duty time

Flight Day 10
Final middeck cargo transfer from Atlantis
to the station
Rendezvous Tool Checkout
Joint Crew News Conference
Farewells and Hatch Closure
Centerline Camera installation
Atlantis undocking from station and
flyaround
Final separation from the station

Flight Day 11
OBSS late inspection of Atlantis’ thermal
heat shield
OBSS berth

Flight Day 12
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
MAY 2010 TIMELINE OVERVIEW 15

Flight Day 13
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing




Last“Missing” Normal Matter Is Found-SkyandTelescope.com
http://www.skyandtelescope.com/community/skyblog/newsblog/93797364.html
X-ray Discovery Points to Location of Missing Matter
Chandra :: Photo Album :: H2356-309 :: 11 May 10
http://chandra.harvard.edu/photo/2010/h2356/


X-ray discovery points to location of missing matter in universe
"Warm-Hot Intergalactic Medium (WHIM). Scientists think the WHIM is material left over after the formation of galaxies, which was later enriched by elements blown out of galaxies."
http://www.sciencedaily.com/releases/2010/05/100511122745.htm
The Sculptor Wall- NASA
http://www.nasa.gov/mission_pages/chandra/multimedia/photo10-048.html
X-ray discovery points to location of missing matter
http://www.physorg.com/news192799714.html
Chandra, XMM-Newton Eye Possible Location Of Missing Matter - Space News - redOrbit
http://www.redorbit.com/news/space/1863770/chandra_xmmnewton_eye_possible_location_of_missing_matter/index.html?source=r_space
X-Ray Observations Find Evidence for "Missing Matter" in the Universe | Universe Today
http://www.universetoday.com/2010/05/11/x-ray-observations-find-evidence-for-missing-matter-in-the-universe/





NASA Funds Development of Destiny: The Dark Energy Space Telescope: NOAO Press Release 06-10
http://www.noao.edu/outreach/press/pr06/pr0610.html
Astronomy Without a Telescope – Making Sense Of The Neutron Zoo | Universe Today
http://www.universetoday.com/2010/05/15/astronomy-without-a-telescope-making-sense-of-the-neutron-zoo/





日本財政の借金、5年後にGDP比250% IMF予測 (朝日新聞社
国際通貨基金IMFは14日、世界各国の財政見通しに関する報告書を発表
日本の債務残高の対国内総生産(GDP)比率は、2015年に主要国や新興国のなかで最悪の250%に達すると予測。
現在5%の消費税を倍の10%に引き上げれば、毎年GDP比で2.6%分の増収につながると指摘。事実上、日本に消費税引き上げを提言した。"
http://www.asahi.com/politics/update/0515/TKY201005150184.html


Adobe fights Apple with pro-Flash ad campaign | CNET News
http://news.cnet.com/8301-30685_3-20004884-264.html


Flex SDK- Adobe Open Source
http://opensource.adobe.com/wiki/display/site/Home
AdobeFlashのオープン性を主張するキャンペーン開始:ITpro
http://itpro.nikkeibp.co.jp/article/NEWS/20100514/347990/


Rudy’s Blog SF and Quantum Mechanics, #2
http://www.rudyrucker.com/blog/2010/05/13/sf-and-quantum-mechanics-2/







世襲リスト
世襲議員族議員 131名
http://www.kyudan.com/data/seshu2.htm
【た】
竹下亘 島根2区、自民党 兄は竹下登 衆議院議員
橘康太郎  比例区北陸信越自民党 父親は橘直治 参議院議員
田中眞紀子 新潟5区民主党 父親は田中角栄 衆議院議員
棚橋泰文 岐阜2区、自民党 祖父は松野幸泰 衆議院議員
谷公一 兵庫5区、自民党 父親は谷洋一 衆議院議員
谷垣禎一 京都5区、自民党 父親は谷垣専一 衆議院議員
玉置一弥 比例区近畿、民主党 父親は玉置一徳 衆議院議員
田村憲久 三重4区、自民党 伯父は田村元 衆議院議員














5/16

06:07AM NC-4 rendezvous rocket firing
07:39AM TI rendezvous rocket firing
08:56AM MC-4 burn
10:27AM ISS docking



Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout

Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Expedition 23 crew members Creamer and
Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of Integrated Cargo
Carrier, unberthing from Atlantis’ payload
bay and temporary park on the Mobile Base
System’s payload attachment device
Spacewalk 1 preparations by Reisman
and Bowen
Spacewalk 1 procedure review
Spacewalk 1 campout by Reisman and
Bowen in the Quest airlock

Flight Day 4
Spacewalk 1 by Reisman and Bowen
(Installation of the backup Space-to-Ground
Antenna on the Z1 truss and installation of a
new tool platform on the Dextre robot)

Flight Day 5
Unberth of the Russian Rassvet module from
Atlantis’ payload bay and installation on the
Earth-facing port of the Zarya module
Canadarm unberth of the Orbiter Boom
Sensor System and handoff to the shuttle’s
robotic arm
Focused inspection of Atlantis’ thermal
protection heat shield, if required
Spacewalk 2 preparations by Bowen and
Good
Spacewalk 2 procedure review
Spacewalk 2 campout by Bowen and Good
in the Quest airlock


Flight Day 6
Canadarm 2 removal of the Integrated Cargo
Carrier from the Mobile Base System
attachment device and relocation at the
Spacewalk 2 worksite
Spacewalk 2 by Bowen and Good (remove
and replace three of the six batteries in the
P6 truss)

Flight Day 7
Middeck cargo transfer from Atlantis to
the space station
Rassvet/Zarya leak checks and Rassvet hatch
opening for air duct installation (complete
outfitting of Rassvet will be delayed until
after Atlantis departs)
Crew off duty period
Spacewalk 3 preparations by Reisman
and Good
Spacewalk 3 procedure review
Spacewalk 3 campout by Reisman and
Good in the Quest airlock

Flight Day 8
Spacewalk 3 by Reisman and Good (remove
and replace the last three batteries on the P6
truss and, if time permits, retrieve a spare
Power and Data Grapple Fixture from the
sidewall of Atlantis’ payload bay to be
brought inside the station)
Canadarm 2 returns the Integrated Cargo
Carrier to the Mobile Base System
attachment device

Flight Day 9
Canadarm 2 berths the Integrated Cargo
Carrier in Atlantis’ cargo bay
Middeck cargo transfer from Atlantis to
the station
Crew off duty time

Flight Day 10
Final middeck cargo transfer from Atlantis
to the station
Rendezvous Tool Checkout
Joint Crew News Conference
Farewells and Hatch Closure
Centerline Camera installation
Atlantis undocking from station and
flyaround
Final separation from the station

Flight Day 11
OBSS late inspection of Atlantis’ thermal
heat shield
OBSS berth

Flight Day 12
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
MAY 2010 TIMELINE OVERVIEW 15

Flight Day 13
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing




Last“Missing” Normal Matter Is Found-SkyandTelescope.com
http://www.skyandtelescope.com/community/skyblog/newsblog/93797364.html
X-ray Discovery Points to Location of Missing Matter
Chandra :: Photo Album :: H2356-309 :: 11 May 10
http://chandra.harvard.edu/photo/2010/h2356/


X-ray discovery points to location of missing matter in universe
"Warm-Hot Intergalactic Medium (WHIM). Scientists think the WHIM is material left over after the formation of galaxies, which was later enriched by elements blown out of galaxies."
http://www.sciencedaily.com/releases/2010/05/100511122745.htm
The Sculptor Wall- NASA
http://www.nasa.gov/mission_pages/chandra/multimedia/photo10-048.html
X-ray discovery points to location of missing matter
http://www.physorg.com/news192799714.html
Chandra, XMM-Newton Eye Possible Location Of Missing Matter - Space News - redOrbit
http://www.redorbit.com/news/space/1863770/chandra_xmmnewton_eye_possible_location_of_missing_matter/index.html?source=r_space
X-Ray Observations Find Evidence for "Missing Matter" in the Universe | Universe Today
http://www.universetoday.com/2010/05/11/x-ray-observations-find-evidence-for-missing-matter-in-the-universe/





NASA Funds Development of Destiny: The Dark Energy Space Telescope: NOAO Press Release 06-10
http://www.noao.edu/outreach/press/pr06/pr0610.html
Astronomy Without a Telescope – Making Sense Of The Neutron Zoo | Universe Today
http://www.universetoday.com/2010/05/15/astronomy-without-a-telescope-making-sense-of-the-neutron-zoo/





日本財政の借金、5年後にGDP比250% IMF予測 (朝日新聞社
国際通貨基金IMFは14日、世界各国の財政見通しに関する報告書を発表
日本の債務残高の対国内総生産(GDP)比率は、2015年に主要国や新興国のなかで最悪の250%に達すると予測。
現在5%の消費税を倍の10%に引き上げれば、毎年GDP比で2.6%分の増収につながると指摘。事実上、日本に消費税引き上げを提言した。"
http://www.asahi.com/politics/update/0515/TKY201005150184.html


Adobe fights Apple with pro-Flash ad campaign | CNET News
http://news.cnet.com/8301-30685_3-20004884-264.html


Flex SDK- Adobe Open Source
http://opensource.adobe.com/wiki/display/site/Home
AdobeFlashのオープン性を主張するキャンペーン開始:ITpro
http://itpro.nikkeibp.co.jp/article/NEWS/20100514/347990/


Rudy’s Blog SF and Quantum Mechanics, #2
http://www.rudyrucker.com/blog/2010/05/13/sf-and-quantum-mechanics-2/






5/16

06:07AM NC-4 rendezvous rocket firing
07:39AM TI rendezvous rocket firing
08:56AM MC-4 burn
10:27AM ISS docking



Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout

Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Expedition 23 crew members Creamer and
Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of Integrated Cargo
Carrier, unberthing from Atlantis’ payload
bay and temporary park on the Mobile Base
System’s payload attachment device
Spacewalk 1 preparations by Reisman
and Bowen
Spacewalk 1 procedure review
Spacewalk 1 campout by Reisman and
Bowen in the Quest airlock

Flight Day 4
Spacewalk 1 by Reisman and Bowen
(Installation of the backup Space-to-Ground
Antenna on the Z1 truss and installation of a
new tool platform on the Dextre robot)

Flight Day 5
Unberth of the Russian Rassvet module from
Atlantis’ payload bay and installation on the
Earth-facing port of the Zarya module
Canadarm unberth of the Orbiter Boom
Sensor System and handoff to the shuttle’s
robotic arm
Focused inspection of Atlantis’ thermal
protection heat shield, if required
Spacewalk 2 preparations by Bowen and
Good
Spacewalk 2 procedure review
Spacewalk 2 campout by Bowen and Good
in the Quest airlock


Flight Day 6
Canadarm 2 removal of the Integrated Cargo
Carrier from the Mobile Base System
attachment device and relocation at the
Spacewalk 2 worksite
Spacewalk 2 by Bowen and Good (remove
and replace three of the six batteries in the
P6 truss)

Flight Day 7
Middeck cargo transfer from Atlantis to
the space station
Rassvet/Zarya leak checks and Rassvet hatch
opening for air duct installation (complete
outfitting of Rassvet will be delayed until
after Atlantis departs)
Crew off duty period
Spacewalk 3 preparations by Reisman
and Good
Spacewalk 3 procedure review
Spacewalk 3 campout by Reisman and
Good in the Quest airlock

Flight Day 8
Spacewalk 3 by Reisman and Good (remove
and replace the last three batteries on the P6
truss and, if time permits, retrieve a spare
Power and Data Grapple Fixture from the
sidewall of Atlantis’ payload bay to be
brought inside the station)
Canadarm 2 returns the Integrated Cargo
Carrier to the Mobile Base System
attachment device

Flight Day 9
Canadarm 2 berths the Integrated Cargo
Carrier in Atlantis’ cargo bay
Middeck cargo transfer from Atlantis to
the station
Crew off duty time

Flight Day 10
Final middeck cargo transfer from Atlantis
to the station
Rendezvous Tool Checkout
Joint Crew News Conference
Farewells and Hatch Closure
Centerline Camera installation
Atlantis undocking from station and
flyaround
Final separation from the station

Flight Day 11
OBSS late inspection of Atlantis’ thermal
heat shield
OBSS berth

Flight Day 12
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
MAY 2010 TIMELINE OVERVIEW 15

Flight Day 13
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing




Last“Missing” Normal Matter Is Found-SkyandTelescope.com
http://www.skyandtelescope.com/community/skyblog/newsblog/93797364.html
X-ray Discovery Points to Location of Missing Matter
Chandra :: Photo Album :: H2356-309 :: 11 May 10
http://chandra.harvard.edu/photo/2010/h2356/


X-ray discovery points to location of missing matter in universe
"Warm-Hot Intergalactic Medium (WHIM). Scientists think the WHIM is material left over after the formation of galaxies, which was later enriched by elements blown out of galaxies."
http://www.sciencedaily.com/releases/2010/05/100511122745.htm
The Sculptor Wall- NASA
http://www.nasa.gov/mission_pages/chandra/multimedia/photo10-048.html
X-ray discovery points to location of missing matter
http://www.physorg.com/news192799714.html
Chandra, XMM-Newton Eye Possible Location Of Missing Matter - Space News - redOrbit
http://www.redorbit.com/news/space/1863770/chandra_xmmnewton_eye_possible_location_of_missing_matter/index.html?source=r_space
X-Ray Observations Find Evidence for "Missing Matter" in the Universe | Universe Today
http://www.universetoday.com/2010/05/11/x-ray-observations-find-evidence-for-missing-matter-in-the-universe/





NASA Funds Development of Destiny: The Dark Energy Space Telescope: NOAO Press Release 06-10
http://www.noao.edu/outreach/press/pr06/pr0610.html
Astronomy Without a Telescope – Making Sense Of The Neutron Zoo | Universe Today
http://www.universetoday.com/2010/05/15/astronomy-without-a-telescope-making-sense-of-the-neutron-zoo/





日本財政の借金、5年後にGDP比250% IMF予測 (朝日新聞社
国際通貨基金IMFは14日、世界各国の財政見通しに関する報告書を発表
日本の債務残高の対国内総生産(GDP)比率は、2015年に主要国や新興国のなかで最悪の250%に達すると予測。
現在5%の消費税を倍の10%に引き上げれば、毎年GDP比で2.6%分の増収につながると指摘。事実上、日本に消費税引き上げを提言した。"
http://www.asahi.com/politics/update/0515/TKY201005150184.html


Adobe fights Apple with pro-Flash ad campaign | CNET News
http://news.cnet.com/8301-30685_3-20004884-264.html


Flex SDK- Adobe Open Source
http://opensource.adobe.com/wiki/display/site/Home
AdobeFlashのオープン性を主張するキャンペーン開始:ITpro
http://itpro.nikkeibp.co.jp/article/NEWS/20100514/347990/


Rudy’s Blog SF and Quantum Mechanics, #2
http://www.rudyrucker.com/blog/2010/05/13/sf-and-quantum-mechanics-2/







世襲リスト
世襲議員族議員 131名
http://www.kyudan.com/data/seshu2.htm
【た】
竹下亘 島根2区、自民党 兄は竹下登 衆議院議員
橘康太郎  比例区北陸信越自民党 父親は橘直治 参議院議員
田中眞紀子 新潟5区民主党 父親は田中角栄 衆議院議員
棚橋泰文 岐阜2区、自民党 祖父は松野幸泰 衆議院議員
谷公一 兵庫5区、自民党 父親は谷洋一 衆議院議員
谷垣禎一 京都5区、自民党 父親は谷垣専一 衆議院議員
玉置一弥 比例区近畿、民主党 父親は玉置一徳 衆議院議員
田村憲久 三重4区、自民党 伯父は田村元 衆議院議員











5/16

06:07AM NC-4 rendezvous rocket firing
07:39AM TI rendezvous rocket firing
08:56AM MC-4 burn
10:27AM ISS docking



Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout

Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Expedition 23 crew members Creamer and
Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of Integrated Cargo
Carrier, unberthing from Atlantis’ payload
bay and temporary park on the Mobile Base
System’s payload attachment device
Spacewalk 1 preparations by Reisman
and Bowen
Spacewalk 1 procedure review
Spacewalk 1 campout by Reisman and
Bowen in the Quest airlock

Flight Day 4
Spacewalk 1 by Reisman and Bowen
(Installation of the backup Space-to-Ground
Antenna on the Z1 truss and installation of a
new tool platform on the Dextre robot)

Flight Day 5
Unberth of the Russian Rassvet module from
Atlantis’ payload bay and installation on the
Earth-facing port of the Zarya module
Canadarm unberth of the Orbiter Boom
Sensor System and handoff to the shuttle’s
robotic arm
Focused inspection of Atlantis’ thermal
protection heat shield, if required
Spacewalk 2 preparations by Bowen and
Good
Spacewalk 2 procedure review
Spacewalk 2 campout by Bowen and Good
in the Quest airlock


Flight Day 6
Canadarm 2 removal of the Integrated Cargo
Carrier from the Mobile Base System
attachment device and relocation at the
Spacewalk 2 worksite
Spacewalk 2 by Bowen and Good (remove
and replace three of the six batteries in the
P6 truss)

Flight Day 7
Middeck cargo transfer from Atlantis to
the space station
Rassvet/Zarya leak checks and Rassvet hatch
opening for air duct installation (complete
outfitting of Rassvet will be delayed until
after Atlantis departs)
Crew off duty period
Spacewalk 3 preparations by Reisman
and Good
Spacewalk 3 procedure review
Spacewalk 3 campout by Reisman and
Good in the Quest airlock

Flight Day 8
Spacewalk 3 by Reisman and Good (remove
and replace the last three batteries on the P6
truss and, if time permits, retrieve a spare
Power and Data Grapple Fixture from the
sidewall of Atlantis’ payload bay to be
brought inside the station)
Canadarm 2 returns the Integrated Cargo
Carrier to the Mobile Base System
attachment device

Flight Day 9
Canadarm 2 berths the Integrated Cargo
Carrier in Atlantis’ cargo bay
Middeck cargo transfer from Atlantis to
the station
Crew off duty time

Flight Day 10
Final middeck cargo transfer from Atlantis
to the station
Rendezvous Tool Checkout
Joint Crew News Conference
Farewells and Hatch Closure
Centerline Camera installation
Atlantis undocking from station and
flyaround
Final separation from the station

Flight Day 11
OBSS late inspection of Atlantis’ thermal
heat shield
OBSS berth

Flight Day 12
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
MAY 2010 TIMELINE OVERVIEW 15

Flight Day 13
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing




Last“Missing” Normal Matter Is Found-SkyandTelescope.com
http://www.skyandtelescope.com/community/skyblog/newsblog/93797364.html
X-ray Discovery Points to Location of Missing Matter
Chandra :: Photo Album :: H2356-309 :: 11 May 10
http://chandra.harvard.edu/photo/2010/h2356/


X-ray discovery points to location of missing matter in universe
"Warm-Hot Intergalactic Medium (WHIM). Scientists think the WHIM is material left over after the formation of galaxies, which was later enriched by elements blown out of galaxies."
http://www.sciencedaily.com/releases/2010/05/100511122745.htm
The Sculptor Wall- NASA
http://www.nasa.gov/mission_pages/chandra/multimedia/photo10-048.html
X-ray discovery points to location of missing matter
http://www.physorg.com/news192799714.html
Chandra, XMM-Newton Eye Possible Location Of Missing Matter - Space News - redOrbit
http://www.redorbit.com/news/space/1863770/chandra_xmmnewton_eye_possible_location_of_missing_matter/index.html?source=r_space
X-Ray Observations Find Evidence for "Missing Matter" in the Universe | Universe Today
http://www.universetoday.com/2010/05/11/x-ray-observations-find-evidence-for-missing-matter-in-the-universe/





NASA Funds Development of Destiny: The Dark Energy Space Telescope: NOAO Press Release 06-10
http://www.noao.edu/outreach/press/pr06/pr0610.html
Astronomy Without a Telescope – Making Sense Of The Neutron Zoo | Universe Today
http://www.universetoday.com/2010/05/15/astronomy-without-a-telescope-making-sense-of-the-neutron-zoo/





日本財政の借金、5年後にGDP比250% IMF予測 (朝日新聞社
国際通貨基金IMFは14日、世界各国の財政見通しに関する報告書を発表
日本の債務残高の対国内総生産(GDP)比率は、2015年に主要国や新興国のなかで最悪の250%に達すると予測。
現在5%の消費税を倍の10%に引き上げれば、毎年GDP比で2.6%分の増収につながると指摘。事実上、日本に消費税引き上げを提言した。"
http://www.asahi.com/politics/update/0515/TKY201005150184.html


Adobe fights Apple with pro-Flash ad campaign | CNET News
http://news.cnet.com/8301-30685_3-20004884-264.html


Flex SDK- Adobe Open Source
http://opensource.adobe.com/wiki/display/site/Home
AdobeFlashのオープン性を主張するキャンペーン開始:ITpro
http://itpro.nikkeibp.co.jp/article/NEWS/20100514/347990/


Rudy’s Blog SF and Quantum Mechanics, #2
http://www.rudyrucker.com/blog/2010/05/13/sf-and-quantum-mechanics-2/













5/16

06:07AM NC-4 rendezvous rocket firing
07:39AM TI rendezvous rocket firing
08:56AM MC-4 burn
10:27AM ISS docking



Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout

Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Expedition 23 crew members Creamer and
Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of Integrated Cargo
Carrier, unberthing from Atlantis’ payload
bay and temporary park on the Mobile Base
System’s payload attachment device
Spacewalk 1 preparations by Reisman
and Bowen
Spacewalk 1 procedure review
Spacewalk 1 campout by Reisman and
Bowen in the Quest airlock

Flight Day 4
Spacewalk 1 by Reisman and Bowen
(Installation of the backup Space-to-Ground
Antenna on the Z1 truss and installation of a
new tool platform on the Dextre robot)

Flight Day 5
Unberth of the Russian Rassvet module from
Atlantis’ payload bay and installation on the
Earth-facing port of the Zarya module
Canadarm unberth of the Orbiter Boom
Sensor System and handoff to the shuttle’s
robotic arm
Focused inspection of Atlantis’ thermal
protection heat shield, if required
Spacewalk 2 preparations by Bowen and
Good
Spacewalk 2 procedure review
Spacewalk 2 campout by Bowen and Good
in the Quest airlock


Flight Day 6
Canadarm 2 removal of the Integrated Cargo
Carrier from the Mobile Base System
attachment device and relocation at the
Spacewalk 2 worksite
Spacewalk 2 by Bowen and Good (remove
and replace three of the six batteries in the
P6 truss)

Flight Day 7
Middeck cargo transfer from Atlantis to
the space station
Rassvet/Zarya leak checks and Rassvet hatch
opening for air duct installation (complete
outfitting of Rassvet will be delayed until
after Atlantis departs)
Crew off duty period
Spacewalk 3 preparations by Reisman
and Good
Spacewalk 3 procedure review
Spacewalk 3 campout by Reisman and
Good in the Quest airlock

Flight Day 8
Spacewalk 3 by Reisman and Good (remove
and replace the last three batteries on the P6
truss and, if time permits, retrieve a spare
Power and Data Grapple Fixture from the
sidewall of Atlantis’ payload bay to be
brought inside the station)
Canadarm 2 returns the Integrated Cargo
Carrier to the Mobile Base System
attachment device

Flight Day 9
Canadarm 2 berths the Integrated Cargo
Carrier in Atlantis’ cargo bay
Middeck cargo transfer from Atlantis to
the station
Crew off duty time

Flight Day 10
Final middeck cargo transfer from Atlantis
to the station
Rendezvous Tool Checkout
Joint Crew News Conference
Farewells and Hatch Closure
Centerline Camera installation
Atlantis undocking from station and
flyaround
Final separation from the station

Flight Day 11
OBSS late inspection of Atlantis’ thermal
heat shield
OBSS berth

Flight Day 12
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
MAY 2010 TIMELINE OVERVIEW 15

Flight Day 13
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing




Last“Missing” Normal Matter Is Found-SkyandTelescope.com
http://www.skyandtelescope.com/community/skyblog/newsblog/93797364.html
X-ray Discovery Points to Location of Missing Matter
Chandra :: Photo Album :: H2356-309 :: 11 May 10
http://chandra.harvard.edu/photo/2010/h2356/


X-ray discovery points to location of missing matter in universe
"Warm-Hot Intergalactic Medium (WHIM). Scientists think the WHIM is material left over after the formation of galaxies, which was later enriched by elements blown out of galaxies."
http://www.sciencedaily.com/releases/2010/05/100511122745.htm
The Sculptor Wall- NASA
http://www.nasa.gov/mission_pages/chandra/multimedia/photo10-048.html
X-ray discovery points to location of missing matter
http://www.physorg.com/news192799714.html
Chandra, XMM-Newton Eye Possible Location Of Missing Matter - Space News - redOrbit
http://www.redorbit.com/news/space/1863770/chandra_xmmnewton_eye_possible_location_of_missing_matter/index.html?source=r_space
X-Ray Observations Find Evidence for "Missing Matter" in the Universe | Universe Today
http://www.universetoday.com/2010/05/11/x-ray-observations-find-evidence-for-missing-matter-in-the-universe/





NASA Funds Development of Destiny: The Dark Energy Space Telescope: NOAO Press Release 06-10
http://www.noao.edu/outreach/press/pr06/pr0610.html
Astronomy Without a Telescope – Making Sense Of The Neutron Zoo | Universe Today
http://www.universetoday.com/2010/05/15/astronomy-without-a-telescope-making-sense-of-the-neutron-zoo/





日本財政の借金、5年後にGDP比250% IMF予測 (朝日新聞社
国際通貨基金IMFは14日、世界各国の財政見通しに関する報告書を発表
日本の債務残高の対国内総生産(GDP)比率は、2015年に主要国や新興国のなかで最悪の250%に達すると予測。
現在5%の消費税を倍の10%に引き上げれば、毎年GDP比で2.6%分の増収につながると指摘。事実上、日本に消費税引き上げを提言した。"
http://www.asahi.com/politics/update/0515/TKY201005150184.html


Adobe fights Apple with pro-Flash ad campaign | CNET News
http://news.cnet.com/8301-30685_3-20004884-264.html


Flex SDK- Adobe Open Source
http://opensource.adobe.com/wiki/display/site/Home
AdobeFlashのオープン性を主張するキャンペーン開始:ITpro
http://itpro.nikkeibp.co.jp/article/NEWS/20100514/347990/


Rudy’s Blog SF and Quantum Mechanics, #2
http://www.rudyrucker.com/blog/2010/05/13/sf-and-quantum-mechanics-2/






5/16

06:07AM NC-4 rendezvous rocket firing
07:39AM TI rendezvous rocket firing
08:56AM MC-4 burn
10:27AM ISS docking



Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout

Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Expedition 23 crew members Creamer and
Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of Integrated Cargo
Carrier, unberthing from Atlantis’ payload
bay and temporary park on the Mobile Base
System’s payload attachment device
Spacewalk 1 preparations by Reisman
and Bowen
Spacewalk 1 procedure review
Spacewalk 1 campout by Reisman and
Bowen in the Quest airlock

Flight Day 4
Spacewalk 1 by Reisman and Bowen
(Installation of the backup Space-to-Ground
Antenna on the Z1 truss and installation of a
new tool platform on the Dextre robot)

Flight Day 5
Unberth of the Russian Rassvet module from
Atlantis’ payload bay and installation on the
Earth-facing port of the Zarya module
Canadarm unberth of the Orbiter Boom
Sensor System and handoff to the shuttle’s
robotic arm
Focused inspection of Atlantis’ thermal
protection heat shield, if required
Spacewalk 2 preparations by Bowen and
Good
Spacewalk 2 procedure review
Spacewalk 2 campout by Bowen and Good
in the Quest airlock


Flight Day 6
Canadarm 2 removal of the Integrated Cargo
Carrier from the Mobile Base System
attachment device and relocation at the
Spacewalk 2 worksite
Spacewalk 2 by Bowen and Good (remove
and replace three of the six batteries in the
P6 truss)

Flight Day 7
Middeck cargo transfer from Atlantis to
the space station
Rassvet/Zarya leak checks and Rassvet hatch
opening for air duct installation (complete
outfitting of Rassvet will be delayed until
after Atlantis departs)
Crew off duty period
Spacewalk 3 preparations by Reisman
and Good
Spacewalk 3 procedure review
Spacewalk 3 campout by Reisman and
Good in the Quest airlock

Flight Day 8
Spacewalk 3 by Reisman and Good (remove
and replace the last three batteries on the P6
truss and, if time permits, retrieve a spare
Power and Data Grapple Fixture from the
sidewall of Atlantis’ payload bay to be
brought inside the station)
Canadarm 2 returns the Integrated Cargo
Carrier to the Mobile Base System
attachment device

Flight Day 9
Canadarm 2 berths the Integrated Cargo
Carrier in Atlantis’ cargo bay
Middeck cargo transfer from Atlantis to
the station
Crew off duty time

Flight Day 10
Final middeck cargo transfer from Atlantis
to the station
Rendezvous Tool Checkout
Joint Crew News Conference
Farewells and Hatch Closure
Centerline Camera installation
Atlantis undocking from station and
flyaround
Final separation from the station

Flight Day 11
OBSS late inspection of Atlantis’ thermal
heat shield
OBSS berth

Flight Day 12
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
MAY 2010 TIMELINE OVERVIEW 15

Flight Day 13
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing




Last“Missing” Normal Matter Is Found-SkyandTelescope.com
http://www.skyandtelescope.com/community/skyblog/newsblog/93797364.html
X-ray Discovery Points to Location of Missing Matter
Chandra :: Photo Album :: H2356-309 :: 11 May 10
http://chandra.harvard.edu/photo/2010/h2356/


X-ray discovery points to location of missing matter in universe
"Warm-Hot Intergalactic Medium (WHIM). Scientists think the WHIM is material left over after the formation of galaxies, which was later enriched by elements blown out of galaxies."
http://www.sciencedaily.com/releases/2010/05/100511122745.htm
The Sculptor Wall- NASA
http://www.nasa.gov/mission_pages/chandra/multimedia/photo10-048.html
X-ray discovery points to location of missing matter
http://www.physorg.com/news192799714.html
Chandra, XMM-Newton Eye Possible Location Of Missing Matter - Space News - redOrbit
http://www.redorbit.com/news/space/1863770/chandra_xmmnewton_eye_possible_location_of_missing_matter/index.html?source=r_space
X-Ray Observations Find Evidence for "Missing Matter" in the Universe | Universe Today
http://www.universetoday.com/2010/05/11/x-ray-observations-find-evidence-for-missing-matter-in-the-universe/





NASA Funds Development of Destiny: The Dark Energy Space Telescope: NOAO Press Release 06-10
http://www.noao.edu/outreach/press/pr06/pr0610.html
Astronomy Without a Telescope – Making Sense Of The Neutron Zoo | Universe Today
http://www.universetoday.com/2010/05/15/astronomy-without-a-telescope-making-sense-of-the-neutron-zoo/





日本財政の借金、5年後にGDP比250% IMF予測 (朝日新聞社
国際通貨基金IMFは14日、世界各国の財政見通しに関する報告書を発表
日本の債務残高の対国内総生産(GDP)比率は、2015年に主要国や新興国のなかで最悪の250%に達すると予測。
現在5%の消費税を倍の10%に引き上げれば、毎年GDP比で2.6%分の増収につながると指摘。事実上、日本に消費税引き上げを提言した。"
http://www.asahi.com/politics/update/0515/TKY201005150184.html


Adobe fights Apple with pro-Flash ad campaign | CNET News
http://news.cnet.com/8301-30685_3-20004884-264.html


Flex SDK- Adobe Open Source
http://opensource.adobe.com/wiki/display/site/Home
AdobeFlashのオープン性を主張するキャンペーン開始:ITpro
http://itpro.nikkeibp.co.jp/article/NEWS/20100514/347