nexus6

nexus6

酉の市: Flight Day 16


11月 酉の市29日(土)
2009年は12(木) と24(火)

[0807.0879] Experimental constraints on a dark matter origin for the DAMA annual modulation effect
"A claim for evidence of dark matter interactions in the DAMA experiment has been recently reinforced. "
http://arxiv.org/abs/0807.0879
The Great Beyond: DAMA dark matter debunked?
"One particularly controversial experiment is known as DAMA/LIBRA. It's located beneath the Italian mountain of Gran Sasso, and it's claiming to see an annual fluctuation of dark matter as the earth flies through a galactic halo of the stuff."
http://blogs.nature.com/news/thegreatbeyond/2008/11/dama_debunked.html
DAMA (Dark Matter)
http://www.lngs.infn.it/lngs_infn/contents/lngs_en/research/experiments_scientific_info/experiments/current/dama/?language=lngs_en


amin|@Victor Entertainment
http://www.jvcmusic.co.jp/-/Artist/A022059.html





SATURDAY, NOVEMBER 29 - FD 16
228...ENDEAVOUR CREW WAKE UP (FD 16)..........14/09:00...04:55 AM...09:55
229...VTR PLAYBACK............................14/11:55...07:50 AM...12:50
230...CABIN STOWAGE BEGINS....................14/12:15...08:10 AM...13:10
230...HD FLIGHT DAY 16 CREW HIGHLIGHTS........14/12:35...08:30 AM...13:30
231...OBSS BERTH..............................14/13:45...09:40 AM...14:40
231...FCS CHECKOUT............................14/14:45...10:40 AM...15:40
232...RCS HOT-FIRE TEST.......................14/16:00...11:55 AM...16:55
232.*.CREW DEORBIT PREPARATION BRIEFING.......14/16:15...12:10 PM...17:10
233...CNN/KRON-TV, KATU-TV....................14/16:45...12:40 PM...17:40
234...POST MMT BRIEFING.......................14/18:35...02:30 PM...19:30
235...PICOSAT DEPLOY..........................14/19:40...03:35 PM...20:35
235...MISSION STATUS BRIEFING.................14/20:35...04:30 PM...21:30
236.*.CHAMITOFF'S RECUMBENT SEAT SET UP.......14/21:25...05:20 PM...22:20
236...KU STOW.................................14/21:50...05:45 PM...22:45
238...ENDEAVOUR CREW SLEEP BEGINS.............15/01:00...08:55 PM...01:55
238...FLIGHT DAY 16 HIGHLIGHTS................15/01:05...09:00 PM...02:00


Landing is targeted for the Kennedy Space Center's Shuttle Landing Facility at about 1:18 p.m. Sunday.
NASA ミッション期間を1日延長
STS-126エンデバー
12月1日午前3時18分帰還予定






日程再掲
Flight Day 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
• Shuttle Robotic Arm Activation
• Umbilical Well and Handheld External
Tank Photo Downlink



Flight Day 2
• Endeavour Thermal Protection System
Survey with Shuttle Robotic Arm/
OrbiterBoom Sensor System (OBSS)
• Extravehicular Mobility Unit Checkout
• Centerline Camera Installation
• Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout



Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
by the Expedition 18 Crew
• Docking to Harmony/Pressurized Mating
Adapter‐2
• Hatch Opening and Welcoming
Magnus and Chamitoff Exchange Soyuz
Seatliners; Magnus Joins Expedition 18,
Chamitoff Joins the STS‐126 Crew
• OBSS Handoff from Canadarm2 to Shuttle
Robotic Arm








Flight Day 4
• Canadarm2 Grapple and Unberthing of
Leonardo Multi‐Purpose Logistics Module
(MPLM) from Endeavour’s cargo bay
• Installation of Leonardo MPLM onto Nadir
Port of Harmony/Node 2
• Shuttle/ISS Transfers
• Leonardo MPLM Ingress
• EVA 1 Procedure Review
• EVA 1 Campout by Piper and Bowen



Flight Day 5
• EVA Preparations
• EVA 1 by Piper and Bowen (Nitrogen Tank
Assembly replacement, assorted station
assembly tasks, start of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
• Shuttle/ISS Transfers



Flight Day 6
• Start of Installation of New Environmental
Systems and Crew Habitability Equipment
for Six‐Person Crew
• Shuttle Robotic Arm/OBSS Focused
Inspection of Endeavour’s Thermal
Protection System, if Required
• Shuttle/ISS Transfers
• EVA 2 Procedure Review
• EVA 2 Campout by Piper and Kimbrough




Flight Day 7
• EVA Preparations
• EVA 2 by Piper and Kimbrough (Crew and
Equipment Translation Aid (CETA) Cart
Relocation, lubrication of Canadarm2 end
effector, continuation of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
GPS Antenna Assembly
• Shuttle/ISS Transfers




Flight Day 8
• Kibo Experiment Facility Berthing
Mechanism Checkout
• Camera System Assembly
• Joint Crew News Conference
• Crew Off Duty Time
• Shuttle/ISS Transfers
• EVA 3 Procedure Review
• EVA 3 Campout by Piper and Bowen




Flight Day 9
• EVA Preparations
• EVA 3 by Piper and Bowen (continuation of
cleaning and lubrication of starboard Solar
Alpha Rotary Joint)
• Shuttle/ISS Transfers


Flight Day 10
• Crew Off Duty Period
• Shuttle/ISS Transfers
• EVA 4 Procedure Review
• EVA 4 Campout by Bowen and Kimbrough



Flight Day 11
• EVA Preparations
• EVA 4 by Bowen and Kimbrough (Thermal
cover removal from Kibo module,
lubrication of port Solar Alpha Rotary Joint,
installation of GPS antenna on Kibo,
thermal cover removal from P3 truss,
installation of camera system on truss)
• Shuttle/ISS Transfers



Flight Day 12
• Final Shuttle/ISS Transfers
• Leonardo MPLM Egress and
Depressurization
• Canadarm2 Removal of Leonardo MPLM
from Harmony/Node 2 and Berthing in
Endeavour’s Cargo Bay



Flight Day 13
• Crew Off Duty Time
Rendezvous Tool Checkout
• Final Farewells and Hatch Closure
• Centerline Camera Installation



Flight Day 14
• Undocking
• Flyaround of the International Space Station
• Final Separation
• OBSS Late Inspection of Endeavour’s
Thermal Protection System



Flight Day 15
• Flight Control System Checkout
• Reaction Control System Hot‐Fire Test
• Picosat Deployment
• Cabin Stowage
• Chamitoff’s Recumbent Seat Set Up
• Crew Deorbit Briefing
• Ku‐Band Antenna Stowage




Flight Day 16
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
NASA’s Kennedy Space Center Landing




CBS News Space Place - Space Shuttle Facts & Figures
http://www.cbsnews.com/network/news/space/currentglance.html




「2008NHK杯国際フィギュアスケート競技大会」
30日(日)まで国立代々木競技場・第一体育館
11月29日(土)
17:00〜17:59 ペア フリー・アイスダンス フリーダンス
19:30〜20:43 女子シングル フリー




2008年11月28日、「嫦娥1号」、月面で最も標高が高い場所は世界最高峰のチョモランマより1000m高い9840m。
ニューサイト「東方網」が伝えた。
最も標高が低い場所は南極エイトケン盆地の9230km
嫦娥1号」プロジェクトのVLBI(超長基線電波干渉計)技術主任、平勁松(ピン・ジンソン)氏は「月面標高の最高地点と最低地点には、まだ名前がついていない。(今回の快挙で)中国人が命名することが出来れば」と語った。
http://www.recordchina.co.jp/group/g26242.html


毛利衛さん:偉業たたえる宇宙記念館が休館へ 北海道余市 (毎日新聞)
"初年度は15万人以上が訪れたが、その後減り続け、今年度は10月末現在で3万3554人まで落ち込んだ"
http://mainichi.jp/select/science/news/20081130k0000m040087000c.html



厚木基地に続く謎の専用線を探るの巻 | マイコミジャーナル
厚木基地といっても、神奈川県厚木市にはない。厚木基地がある綾瀬市大和市
"「在日米軍横須賀海軍施設」から横須賀線田浦駅を経て、あるいは「在日米軍鶴見貯油施設エリア」から鶴見線安善駅を経て輸送されてきた貨物列車は、このポイントから厚木基地に入っていったのだろう。"
http://journal.mycom.co.jp/column/nekomachi/024/


幼稚な歴史観で講演 相槌を打つ"濡れ衣"組 お笑い会にようこそッ
防衛省:田母神講演に苦慮「手の打ちようない」 (毎日新聞)
"12月1日に外国特派員協会で記者会見
田母神が公職にないため同省幹部は接触を控えているが「誰も一民間人の話とは受け取らず、発言のたびに政権批判が再燃する」(内局幹部)。同省は、田母神の日程リストをまとめ浜田靖一防衛相にも報告した"
http://mainichi.jp/select/today/news/20081130k0000m010061000c.html


被害者参加制度」(12月15日施行)
ほぼ裁判員制度の対象と同一。
被害者・遺族が希望し、裁判所が認めれば検察官の隣に座って被告に直接質問することが可能となり、検察官の求刑に対して「もっと重くすべきだ」などと意見も述べられる。また、弁護士を付けることも認められている。
この制度は、12月1日以降に起訴された事件に適用される。起訴後、公判開始まで準備が必要なことから、実際に制度が動き出すのは早くても年明けになる"
http://sankei.jp.msn.com/affairs/trial/081130/trl0811300248001-n1.htm


裁判員」来た、(読売新聞)
"「裁判員候補者名簿記載通知書」を受け取った東京都新宿区の70歳代の無職女性は、まず不安を感じた。"
http://www.yomiuri.co.jp/feature/20081128-033595/news/20081130-OYT1T00167.htm
裁判員候補 どうしよう、通知きちゃった (朝日新聞 )
"神奈川県大和市の無職男性(65)の家にも、通知が届いたが、あて名は福祉施設に入所する義母(87)。認知症があり、耳もほとんど聞こえない"
選挙人名簿から選ばれた約29万5千人に対し、最高裁が28日に発送した。辞退が認められた人を除く候補者から、事件ごとに数十人がくじで選ばれ、来年5月以降に改めて通知を受ける。実際に裁判所に足を運ぶことになるのは、来年7月以降
http://www.asahi.com/national/update/1130/TKY200811290295.html




Operation Cyclon と名づけたそうだ
Troops search Mumbai siege hotel
Police in Mumbai say they have succeeded in killing the last three members of the gang inside the Taj Mahal Palace hotel."
http://news.bbc.co.uk/2/hi/video_and_audio/default.stm

Blast hits Thai government house
"A grenade explosion has injured at least 11 people inside the opposition-occupied government house in the Thai capital Bangkok." BBC NEWS
http://news.bbc.co.uk/2/hi/asia-pacific/7756766.stm
Riots 'kill hundreds in Nigeria'
"Hundreds of people are reported to have been killed in central Nigeria after Christians and Muslims clashed over the result of a local election." BBC NEWS
http://news.bbc.co.uk/2/hi/africa/7756695.stm




11月 酉の市29日(土)
2009年は12(木) と24(火)

[0807.0879] Experimental constraints on a dark matter origin for the DAMA annual modulation effect
"A claim for evidence of dark matter interactions in the DAMA experiment has been recently reinforced. "
http://arxiv.org/abs/0807.0879
The Great Beyond: DAMA dark matter debunked?
"One particularly controversial experiment is known as DAMA/LIBRA. It's located beneath the Italian mountain of Gran Sasso, and it's claiming to see an annual fluctuation of dark matter as the earth flies through a galactic halo of the stuff."
http://blogs.nature.com/news/thegreatbeyond/2008/11/dama_debunked.html
DAMA (Dark Matter)
http://www.lngs.infn.it/lngs_infn/contents/lngs_en/research/experiments_scientific_info/experiments/current/dama/?language=lngs_en


amin|@Victor Entertainment
http://www.jvcmusic.co.jp/-/Artist/A022059.html





SATURDAY, NOVEMBER 29 - FD 16
228...ENDEAVOUR CREW WAKE UP (FD 16)..........14/09:00...04:55 AM...09:55
229...VTR PLAYBACK............................14/11:55...07:50 AM...12:50
230...CABIN STOWAGE BEGINS....................14/12:15...08:10 AM...13:10
230...HD FLIGHT DAY 16 CREW HIGHLIGHTS........14/12:35...08:30 AM...13:30
231...OBSS BERTH..............................14/13:45...09:40 AM...14:40
231...FCS CHECKOUT............................14/14:45...10:40 AM...15:40
232...RCS HOT-FIRE TEST.......................14/16:00...11:55 AM...16:55
232.*.CREW DEORBIT PREPARATION BRIEFING.......14/16:15...12:10 PM...17:10
233...CNN/KRON-TV, KATU-TV....................14/16:45...12:40 PM...17:40
234...POST MMT BRIEFING.......................14/18:35...02:30 PM...19:30
235...PICOSAT DEPLOY..........................14/19:40...03:35 PM...20:35
235...MISSION STATUS BRIEFING.................14/20:35...04:30 PM...21:30
236.*.CHAMITOFF'S RECUMBENT SEAT SET UP.......14/21:25...05:20 PM...22:20
236...KU STOW.................................14/21:50...05:45 PM...22:45
238...ENDEAVOUR CREW SLEEP BEGINS.............15/01:00...08:55 PM...01:55
238...FLIGHT DAY 16 HIGHLIGHTS................15/01:05...09:00 PM...02:00


Landing is targeted for the Kennedy Space Center's Shuttle Landing Facility at about 1:18 p.m. Sunday.
NASA ミッション期間を1日延長
STS-126エンデバー
12月1日午前3時18分帰還予定






日程再掲
Flight Day 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
• Shuttle Robotic Arm Activation
• Umbilical Well and Handheld External
Tank Photo Downlink



Flight Day 2
• Endeavour Thermal Protection System
Survey with Shuttle Robotic Arm/
OrbiterBoom Sensor System (OBSS)
• Extravehicular Mobility Unit Checkout
• Centerline Camera Installation
• Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout



Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
by the Expedition 18 Crew
• Docking to Harmony/Pressurized Mating
Adapter‐2
• Hatch Opening and Welcoming
Magnus and Chamitoff Exchange Soyuz
Seatliners; Magnus Joins Expedition 18,
Chamitoff Joins the STS‐126 Crew
• OBSS Handoff from Canadarm2 to Shuttle
Robotic Arm








Flight Day 4
• Canadarm2 Grapple and Unberthing of
Leonardo Multi‐Purpose Logistics Module
(MPLM) from Endeavour’s cargo bay
• Installation of Leonardo MPLM onto Nadir
Port of Harmony/Node 2
• Shuttle/ISS Transfers
• Leonardo MPLM Ingress
• EVA 1 Procedure Review
• EVA 1 Campout by Piper and Bowen



Flight Day 5
• EVA Preparations
• EVA 1 by Piper and Bowen (Nitrogen Tank
Assembly replacement, assorted station
assembly tasks, start of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
• Shuttle/ISS Transfers



Flight Day 6
• Start of Installation of New Environmental
Systems and Crew Habitability Equipment
for Six‐Person Crew
• Shuttle Robotic Arm/OBSS Focused
Inspection of Endeavour’s Thermal
Protection System, if Required
• Shuttle/ISS Transfers
• EVA 2 Procedure Review
• EVA 2 Campout by Piper and Kimbrough




Flight Day 7
• EVA Preparations
• EVA 2 by Piper and Kimbrough (Crew and
Equipment Translation Aid (CETA) Cart
Relocation, lubrication of Canadarm2 end
effector, continuation of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
GPS Antenna Assembly
• Shuttle/ISS Transfers




Flight Day 8
• Kibo Experiment Facility Berthing
Mechanism Checkout
• Camera System Assembly
• Joint Crew News Conference
• Crew Off Duty Time
• Shuttle/ISS Transfers
• EVA 3 Procedure Review
• EVA 3 Campout by Piper and Bowen




Flight Day 9
• EVA Preparations
• EVA 3 by Piper and Bowen (continuation of
cleaning and lubrication of starboard Solar
Alpha Rotary Joint)
• Shuttle/ISS Transfers


Flight Day 10
• Crew Off Duty Period
• Shuttle/ISS Transfers
• EVA 4 Procedure Review
• EVA 4 Campout by Bowen and Kimbrough



Flight Day 11
• EVA Preparations
• EVA 4 by Bowen and Kimbrough (Thermal
cover removal from Kibo module,
lubrication of port Solar Alpha Rotary Joint,
installation of GPS antenna on Kibo,
thermal cover removal from P3 truss,
installation of camera system on truss)
• Shuttle/ISS Transfers



Flight Day 12
• Final Shuttle/ISS Transfers
• Leonardo MPLM Egress and
Depressurization
• Canadarm2 Removal of Leonardo MPLM
from Harmony/Node 2 and Berthing in
Endeavour’s Cargo Bay



Flight Day 13
• Crew Off Duty Time
Rendezvous Tool Checkout
• Final Farewells and Hatch Closure
• Centerline Camera Installation



Flight Day 14
• Undocking
• Flyaround of the International Space Station
• Final Separation
• OBSS Late Inspection of Endeavour’s
Thermal Protection System



Flight Day 15
• Flight Control System Checkout
• Reaction Control System Hot‐Fire Test
• Picosat Deployment
• Cabin Stowage
• Chamitoff’s Recumbent Seat Set Up
• Crew Deorbit Briefing
• Ku‐Band Antenna Stowage




Flight Day 16
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
NASA’s Kennedy Space Center Landing




CBS News Space Place - Space Shuttle Facts & Figures
http://www.cbsnews.com/network/news/space/currentglance.html




「2008NHK杯国際フィギュアスケート競技大会」
30日(日)まで国立代々木競技場・第一体育館
11月29日(土)
17:00〜17:59 ペア フリー・アイスダンス フリーダンス
19:30〜20:43 女子シングル フリー




2008年11月28日、「嫦娥1号」、月面で最も標高が高い場所は世界最高峰のチョモランマより1000m高い9840m。
ニューサイト「東方網」が伝えた。
最も標高が低い場所は南極エイトケン盆地の9230km
嫦娥1号」プロジェクトのVLBI(超長基線電波干渉計)技術主任、平勁松(ピン・ジンソン)氏は「月面標高の最高地点と最低地点には、まだ名前がついていない。(今回の快挙で)中国人が命名することが出来れば」と語った。
http://www.recordchina.co.jp/group/g26242.html


毛利衛さん:偉業たたえる宇宙記念館が休館へ 北海道余市 (毎日新聞)
"初年度は15万人以上が訪れたが、その後減り続け、今年度は10月末現在で3万3554人まで落ち込んだ"
http://mainichi.jp/select/science/news/20081130k0000m040087000c.html



厚木基地に続く謎の専用線を探るの巻 | マイコミジャーナル
厚木基地といっても、神奈川県厚木市にはない。厚木基地がある綾瀬市大和市
"「在日米軍横須賀海軍施設」から横須賀線田浦駅を経て、あるいは「在日米軍鶴見貯油施設エリア」から鶴見線安善駅を経て輸送されてきた貨物列車は、このポイントから厚木基地に入っていったのだろう。"
http://journal.mycom.co.jp/column/nekomachi/024/


幼稚な歴史観で講演 相槌を打つ"濡れ衣"組 お笑い会にようこそッ
防衛省:田母神講演に苦慮「手の打ちようない」 (毎日新聞)
"12月1日に外国特派員協会で記者会見
田母神が公職にないため同省幹部は接触を控えているが「誰も一民間人の話とは受け取らず、発言のたびに政権批判が再燃する」(内局幹部)。同省は、田母神の日程リストをまとめ浜田靖一防衛相にも報告した"
http://mainichi.jp/select/today/news/20081130k0000m010061000c.html


被害者参加制度」(12月15日施行)
ほぼ裁判員制度の対象と同一。
被害者・遺族が希望し、裁判所が認めれば検察官の隣に座って被告に直接質問することが可能となり、検察官の求刑に対して「もっと重くすべきだ」などと意見も述べられる。また、弁護士を付けることも認められている。
この制度は、12月1日以降に起訴された事件に適用される。起訴後、公判開始まで準備が必要なことから、実際に制度が動き出すのは早くても年明けになる"
http://sankei.jp.msn.com/affairs/trial/081130/trl0811300248001-n1.htm


裁判員」来た、(読売新聞)
"「裁判員候補者名簿記載通知書」を受け取った東京都新宿区の70歳代の無職女性は、まず不安を感じた。"
http://www.yomiuri.co.jp/feature/20081128-033595/news/20081130-OYT1T00167.htm
裁判員候補 どうしよう、通知きちゃった (朝日新聞 )
"神奈川県大和市の無職男性(65)の家にも、通知が届いたが、あて名は福祉施設に入所する義母(87)。認知症があり、耳もほとんど聞こえない"
選挙人名簿から選ばれた約29万5千人に対し、最高裁が28日に発送した。辞退が認められた人を除く候補者から、事件ごとに数十人がくじで選ばれ、来年5月以降に改めて通知を受ける。実際に裁判所に足を運ぶことになるのは、来年7月以降
http://www.asahi.com/national/update/1130/TKY200811290295.html




Operation Cyclon と名づけたそうだ
Troops search Mumbai siege hotel
Police in Mumbai say they have succeeded in killing the last three members of the gang inside the Taj Mahal Palace hotel."
http://news.bbc.co.uk/2/hi/video_and_audio/default.stm

Blast hits Thai government house
"A grenade explosion has injured at least 11 people inside the opposition-occupied government house in the Thai capital Bangkok." BBC NEWS
http://news.bbc.co.uk/2/hi/asia-pacific/7756766.stm
Riots 'kill hundreds in Nigeria'
"Hundreds of people are reported to have been killed in central Nigeria after Christians and Muslims clashed over the result of a local election." BBC NEWS
http://news.bbc.co.uk/2/hi/africa/7756695.stm




11月 酉の市29日(土)
2009年は12(木) と24(火)

[0807.0879] Experimental constraints on a dark matter origin for the DAMA annual modulation effect
"A claim for evidence of dark matter interactions in the DAMA experiment has been recently reinforced. "
http://arxiv.org/abs/0807.0879
The Great Beyond: DAMA dark matter debunked?
"One particularly controversial experiment is known as DAMA/LIBRA. It's located beneath the Italian mountain of Gran Sasso, and it's claiming to see an annual fluctuation of dark matter as the earth flies through a galactic halo of the stuff."
http://blogs.nature.com/news/thegreatbeyond/2008/11/dama_debunked.html
DAMA (Dark Matter)
http://www.lngs.infn.it/lngs_infn/contents/lngs_en/research/experiments_scientific_info/experiments/current/dama/?language=lngs_en


amin|@Victor Entertainment
http://www.jvcmusic.co.jp/-/Artist/A022059.html





SATURDAY, NOVEMBER 29 - FD 16
228...ENDEAVOUR CREW WAKE UP (FD 16)..........14/09:00...04:55 AM...09:55
229...VTR PLAYBACK............................14/11:55...07:50 AM...12:50
230...CABIN STOWAGE BEGINS....................14/12:15...08:10 AM...13:10
230...HD FLIGHT DAY 16 CREW HIGHLIGHTS........14/12:35...08:30 AM...13:30
231...OBSS BERTH..............................14/13:45...09:40 AM...14:40
231...FCS CHECKOUT............................14/14:45...10:40 AM...15:40
232...RCS HOT-FIRE TEST.......................14/16:00...11:55 AM...16:55
232.*.CREW DEORBIT PREPARATION BRIEFING.......14/16:15...12:10 PM...17:10
233...CNN/KRON-TV, KATU-TV....................14/16:45...12:40 PM...17:40
234...POST MMT BRIEFING.......................14/18:35...02:30 PM...19:30
235...PICOSAT DEPLOY..........................14/19:40...03:35 PM...20:35
235...MISSION STATUS BRIEFING.................14/20:35...04:30 PM...21:30
236.*.CHAMITOFF'S RECUMBENT SEAT SET UP.......14/21:25...05:20 PM...22:20
236...KU STOW.................................14/21:50...05:45 PM...22:45
238...ENDEAVOUR CREW SLEEP BEGINS.............15/01:00...08:55 PM...01:55
238...FLIGHT DAY 16 HIGHLIGHTS................15/01:05...09:00 PM...02:00


Landing is targeted for the Kennedy Space Center's Shuttle Landing Facility at about 1:18 p.m. Sunday.
NASA ミッション期間を1日延長
STS-126エンデバー
12月1日午前3時18分帰還予定






日程再掲
Flight Day 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
• Shuttle Robotic Arm Activation
• Umbilical Well and Handheld External
Tank Photo Downlink



Flight Day 2
• Endeavour Thermal Protection System
Survey with Shuttle Robotic Arm/
OrbiterBoom Sensor System (OBSS)
• Extravehicular Mobility Unit Checkout
• Centerline Camera Installation
• Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout



Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
by the Expedition 18 Crew
• Docking to Harmony/Pressurized Mating
Adapter‐2
• Hatch Opening and Welcoming
Magnus and Chamitoff Exchange Soyuz
Seatliners; Magnus Joins Expedition 18,
Chamitoff Joins the STS‐126 Crew
• OBSS Handoff from Canadarm2 to Shuttle
Robotic Arm








Flight Day 4
• Canadarm2 Grapple and Unberthing of
Leonardo Multi‐Purpose Logistics Module
(MPLM) from Endeavour’s cargo bay
• Installation of Leonardo MPLM onto Nadir
Port of Harmony/Node 2
• Shuttle/ISS Transfers
• Leonardo MPLM Ingress
• EVA 1 Procedure Review
• EVA 1 Campout by Piper and Bowen



Flight Day 5
• EVA Preparations
• EVA 1 by Piper and Bowen (Nitrogen Tank
Assembly replacement, assorted station
assembly tasks, start of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
• Shuttle/ISS Transfers



Flight Day 6
• Start of Installation of New Environmental
Systems and Crew Habitability Equipment
for Six‐Person Crew
• Shuttle Robotic Arm/OBSS Focused
Inspection of Endeavour’s Thermal
Protection System, if Required
• Shuttle/ISS Transfers
• EVA 2 Procedure Review
• EVA 2 Campout by Piper and Kimbrough




Flight Day 7
• EVA Preparations
• EVA 2 by Piper and Kimbrough (Crew and
Equipment Translation Aid (CETA) Cart
Relocation, lubrication of Canadarm2 end
effector, continuation of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
GPS Antenna Assembly
• Shuttle/ISS Transfers




Flight Day 8
• Kibo Experiment Facility Berthing
Mechanism Checkout
• Camera System Assembly
• Joint Crew News Conference
• Crew Off Duty Time
• Shuttle/ISS Transfers
• EVA 3 Procedure Review
• EVA 3 Campout by Piper and Bowen




Flight Day 9
• EVA Preparations
• EVA 3 by Piper and Bowen (continuation of
cleaning and lubrication of starboard Solar
Alpha Rotary Joint)
• Shuttle/ISS Transfers


Flight Day 10
• Crew Off Duty Period
• Shuttle/ISS Transfers
• EVA 4 Procedure Review
• EVA 4 Campout by Bowen and Kimbrough



Flight Day 11
• EVA Preparations
• EVA 4 by Bowen and Kimbrough (Thermal
cover removal from Kibo module,
lubrication of port Solar Alpha Rotary Joint,
installation of GPS antenna on Kibo,
thermal cover removal from P3 truss,
installation of camera system on truss)
• Shuttle/ISS Transfers



Flight Day 12
• Final Shuttle/ISS Transfers
• Leonardo MPLM Egress and
Depressurization
• Canadarm2 Removal of Leonardo MPLM
from Harmony/Node 2 and Berthing in
Endeavour’s Cargo Bay



Flight Day 13
• Crew Off Duty Time
Rendezvous Tool Checkout
• Final Farewells and Hatch Closure
• Centerline Camera Installation



Flight Day 14
• Undocking
• Flyaround of the International Space Station
• Final Separation
• OBSS Late Inspection of Endeavour’s
Thermal Protection System



Flight Day 15
• Flight Control System Checkout
• Reaction Control System Hot‐Fire Test
• Picosat Deployment
• Cabin Stowage
• Chamitoff’s Recumbent Seat Set Up
• Crew Deorbit Briefing
• Ku‐Band Antenna Stowage




Flight Day 16
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
NASA’s Kennedy Space Center Landing




CBS News Space Place - Space Shuttle Facts & Figures
http://www.cbsnews.com/network/news/space/currentglance.html




「2008NHK杯国際フィギュアスケート競技大会」
30日(日)まで国立代々木競技場・第一体育館
11月29日(土)
17:00〜17:59 ペア フリー・アイスダンス フリーダンス
19:30〜20:43 女子シングル フリー




2008年11月28日、「嫦娥1号」、月面で最も標高が高い場所は世界最高峰のチョモランマより1000m高い9840m。
ニューサイト「東方網」が伝えた。
最も標高が低い場所は南極エイトケン盆地の9230km
嫦娥1号」プロジェクトのVLBI(超長基線電波干渉計)技術主任、平勁松(ピン・ジンソン)氏は「月面標高の最高地点と最低地点には、まだ名前がついていない。(今回の快挙で)中国人が命名することが出来れば」と語った。
http://www.recordchina.co.jp/group/g26242.html


毛利衛さん:偉業たたえる宇宙記念館が休館へ 北海道余市 (毎日新聞)
"初年度は15万人以上が訪れたが、その後減り続け、今年度は10月末現在で3万3554人まで落ち込んだ"
http://mainichi.jp/select/science/news/20081130k0000m040087000c.html



厚木基地に続く謎の専用線を探るの巻 | マイコミジャーナル
厚木基地といっても、神奈川県厚木市にはない。厚木基地がある綾瀬市大和市
"「在日米軍横須賀海軍施設」から横須賀線田浦駅を経て、あるいは「在日米軍鶴見貯油施設エリア」から鶴見線安善駅を経て輸送されてきた貨物列車は、このポイントから厚木基地に入っていったのだろう。"
http://journal.mycom.co.jp/column/nekomachi/024/


幼稚な歴史観で講演 相槌を打つ"濡れ衣"組 お笑い会にようこそッ
防衛省:田母神講演に苦慮「手の打ちようない」 (毎日新聞)
"12月1日に外国特派員協会で記者会見
田母神が公職にないため同省幹部は接触を控えているが「誰も一民間人の話とは受け取らず、発言のたびに政権批判が再燃する」(内局幹部)。同省は、田母神の日程リストをまとめ浜田靖一防衛相にも報告した"
http://mainichi.jp/select/today/news/20081130k0000m010061000c.html


被害者参加制度」(12月15日施行)
ほぼ裁判員制度の対象と同一。
被害者・遺族が希望し、裁判所が認めれば検察官の隣に座って被告に直接質問することが可能となり、検察官の求刑に対して「もっと重くすべきだ」などと意見も述べられる。また、弁護士を付けることも認められている。
この制度は、12月1日以降に起訴された事件に適用される。起訴後、公判開始まで準備が必要なことから、実際に制度が動き出すのは早くても年明けになる"
http://sankei.jp.msn.com/affairs/trial/081130/trl0811300248001-n1.htm


裁判員」来た、(読売新聞)
"「裁判員候補者名簿記載通知書」を受け取った東京都新宿区の70歳代の無職女性は、まず不安を感じた。"
http://www.yomiuri.co.jp/feature/20081128-033595/news/20081130-OYT1T00167.htm
裁判員候補 どうしよう、通知きちゃった (朝日新聞 )
"神奈川県大和市の無職男性(65)の家にも、通知が届いたが、あて名は福祉施設に入所する義母(87)。認知症があり、耳もほとんど聞こえない"
選挙人名簿から選ばれた約29万5千人に対し、最高裁が28日に発送した。辞退が認められた人を除く候補者から、事件ごとに数十人がくじで選ばれ、来年5月以降に改めて通知を受ける。実際に裁判所に足を運ぶことになるのは、来年7月以降
http://www.asahi.com/national/update/1130/TKY200811290295.html




Operation Cyclon と名づけたそうだ
Troops search Mumbai siege hotel
Police in Mumbai say they have succeeded in killing the last three members of the gang inside the Taj Mahal Palace hotel."
http://news.bbc.co.uk/2/hi/video_and_audio/default.stm

Blast hits Thai government house
"A grenade explosion has injured at least 11 people inside the opposition-occupied government house in the Thai capital Bangkok." BBC NEWS
http://news.bbc.co.uk/2/hi/asia-pacific/7756766.stm
Riots 'kill hundreds in Nigeria'
"Hundreds of people are reported to have been killed in central Nigeria after Christians and Muslims clashed over the result of a local election." BBC NEWS
http://news.bbc.co.uk/2/hi/africa/7756695.stm











11月 酉の市29日(土)
2009年は12(木) と24(火)

[0807.0879] Experimental constraints on a dark matter origin for the DAMA annual modulation effect
"A claim for evidence of dark matter interactions in the DAMA experiment has been recently reinforced. "
http://arxiv.org/abs/0807.0879
The Great Beyond: DAMA dark matter debunked?
"One particularly controversial experiment is known as DAMA/LIBRA. It's located beneath the Italian mountain of Gran Sasso, and it's claiming to see an annual fluctuation of dark matter as the earth flies through a galactic halo of the stuff."
http://blogs.nature.com/news/thegreatbeyond/2008/11/dama_debunked.html
DAMA (Dark Matter)
http://www.lngs.infn.it/lngs_infn/contents/lngs_en/research/experiments_scientific_info/experiments/current/dama/?language=lngs_en


amin|@Victor Entertainment
http://www.jvcmusic.co.jp/-/Artist/A022059.html





SATURDAY, NOVEMBER 29 - FD 16
228...ENDEAVOUR CREW WAKE UP (FD 16)..........14/09:00...04:55 AM...09:55
229...VTR PLAYBACK............................14/11:55...07:50 AM...12:50
230...CABIN STOWAGE BEGINS....................14/12:15...08:10 AM...13:10
230...HD FLIGHT DAY 16 CREW HIGHLIGHTS........14/12:35...08:30 AM...13:30
231...OBSS BERTH..............................14/13:45...09:40 AM...14:40
231...FCS CHECKOUT............................14/14:45...10:40 AM...15:40
232...RCS HOT-FIRE TEST.......................14/16:00...11:55 AM...16:55
232.*.CREW DEORBIT PREPARATION BRIEFING.......14/16:15...12:10 PM...17:10
233...CNN/KRON-TV, KATU-TV....................14/16:45...12:40 PM...17:40
234...POST MMT BRIEFING.......................14/18:35...02:30 PM...19:30
235...PICOSAT DEPLOY..........................14/19:40...03:35 PM...20:35
235...MISSION STATUS BRIEFING.................14/20:35...04:30 PM...21:30
236.*.CHAMITOFF'S RECUMBENT SEAT SET UP.......14/21:25...05:20 PM...22:20
236...KU STOW.................................14/21:50...05:45 PM...22:45
238...ENDEAVOUR CREW SLEEP BEGINS.............15/01:00...08:55 PM...01:55
238...FLIGHT DAY 16 HIGHLIGHTS................15/01:05...09:00 PM...02:00


Landing is targeted for the Kennedy Space Center's Shuttle Landing Facility at about 1:18 p.m. Sunday.
NASA ミッション期間を1日延長
STS-126エンデバー
12月1日午前3時18分帰還予定






日程再掲
Flight Day 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
• Shuttle Robotic Arm Activation
• Umbilical Well and Handheld External
Tank Photo Downlink



Flight Day 2
• Endeavour Thermal Protection System
Survey with Shuttle Robotic Arm/
OrbiterBoom Sensor System (OBSS)
• Extravehicular Mobility Unit Checkout
• Centerline Camera Installation
• Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout



Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
by the Expedition 18 Crew
• Docking to Harmony/Pressurized Mating
Adapter‐2
• Hatch Opening and Welcoming
Magnus and Chamitoff Exchange Soyuz
Seatliners; Magnus Joins Expedition 18,
Chamitoff Joins the STS‐126 Crew
• OBSS Handoff from Canadarm2 to Shuttle
Robotic Arm








Flight Day 4
• Canadarm2 Grapple and Unberthing of
Leonardo Multi‐Purpose Logistics Module
(MPLM) from Endeavour’s cargo bay
• Installation of Leonardo MPLM onto Nadir
Port of Harmony/Node 2
• Shuttle/ISS Transfers
• Leonardo MPLM Ingress
• EVA 1 Procedure Review
• EVA 1 Campout by Piper and Bowen



Flight Day 5
• EVA Preparations
• EVA 1 by Piper and Bowen (Nitrogen Tank
Assembly replacement, assorted station
assembly tasks, start of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
• Shuttle/ISS Transfers



Flight Day 6
• Start of Installation of New Environmental
Systems and Crew Habitability Equipment
for Six‐Person Crew
• Shuttle Robotic Arm/OBSS Focused
Inspection of Endeavour’s Thermal
Protection System, if Required
• Shuttle/ISS Transfers
• EVA 2 Procedure Review
• EVA 2 Campout by Piper and Kimbrough




Flight Day 7
• EVA Preparations
• EVA 2 by Piper and Kimbrough (Crew and
Equipment Translation Aid (CETA) Cart
Relocation, lubrication of Canadarm2 end
effector, continuation of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
GPS Antenna Assembly
• Shuttle/ISS Transfers




Flight Day 8
• Kibo Experiment Facility Berthing
Mechanism Checkout
• Camera System Assembly
• Joint Crew News Conference
• Crew Off Duty Time
• Shuttle/ISS Transfers
• EVA 3 Procedure Review
• EVA 3 Campout by Piper and Bowen




Flight Day 9
• EVA Preparations
• EVA 3 by Piper and Bowen (continuation of
cleaning and lubrication of starboard Solar
Alpha Rotary Joint)
• Shuttle/ISS Transfers


Flight Day 10
• Crew Off Duty Period
• Shuttle/ISS Transfers
• EVA 4 Procedure Review
• EVA 4 Campout by Bowen and Kimbrough



Flight Day 11
• EVA Preparations
• EVA 4 by Bowen and Kimbrough (Thermal
cover removal from Kibo module,
lubrication of port Solar Alpha Rotary Joint,
installation of GPS antenna on Kibo,
thermal cover removal from P3 truss,
installation of camera system on truss)
• Shuttle/ISS Transfers



Flight Day 12
• Final Shuttle/ISS Transfers
• Leonardo MPLM Egress and
Depressurization
• Canadarm2 Removal of Leonardo MPLM
from Harmony/Node 2 and Berthing in
Endeavour’s Cargo Bay



Flight Day 13
• Crew Off Duty Time
Rendezvous Tool Checkout
• Final Farewells and Hatch Closure
• Centerline Camera Installation



Flight Day 14
• Undocking
• Flyaround of the International Space Station
• Final Separation
• OBSS Late Inspection of Endeavour’s
Thermal Protection System



Flight Day 15
• Flight Control System Checkout
• Reaction Control System Hot‐Fire Test
• Picosat Deployment
• Cabin Stowage
• Chamitoff’s Recumbent Seat Set Up
• Crew Deorbit Briefing
• Ku‐Band Antenna Stowage




Flight Day 16
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
NASA’s Kennedy Space Center Landing




CBS News Space Place - Space Shuttle Facts & Figures
http://www.cbsnews.com/network/news/space/currentglance.html




「2008NHK杯国際フィギュアスケート競技大会」
30日(日)まで国立代々木競技場・第一体育館
11月29日(土)
17:00〜17:59 ペア フリー・アイスダンス フリーダンス
19:30〜20:43 女子シングル フリー




2008年11月28日、「嫦娥1号」、月面で最も標高が高い場所は世界最高峰のチョモランマより1000m高い9840m。
ニューサイト「東方網」が伝えた。
最も標高が低い場所は南極エイトケン盆地の9230km
嫦娥1号」プロジェクトのVLBI(超長基線電波干渉計)技術主任、平勁松(ピン・ジンソン)氏は「月面標高の最高地点と最低地点には、まだ名前がついていない。(今回の快挙で)中国人が命名することが出来れば」と語った。
http://www.recordchina.co.jp/group/g26242.html


毛利衛さん:偉業たたえる宇宙記念館が休館へ 北海道余市 (毎日新聞)
"初年度は15万人以上が訪れたが、その後減り続け、今年度は10月末現在で3万3554人まで落ち込んだ"
http://mainichi.jp/select/science/news/20081130k0000m040087000c.html



厚木基地に続く謎の専用線を探るの巻 | マイコミジャーナル
厚木基地といっても、神奈川県厚木市にはない。厚木基地がある綾瀬市大和市
"「在日米軍横須賀海軍施設」から横須賀線田浦駅を経て、あるいは「在日米軍鶴見貯油施設エリア」から鶴見線安善駅を経て輸送されてきた貨物列車は、このポイントから厚木基地に入っていったのだろう。"
http://journal.mycom.co.jp/column/nekomachi/024/


幼稚な歴史観で講演 相槌を打つ"濡れ衣"組 お笑い会にようこそッ
防衛省:田母神講演に苦慮「手の打ちようない」 (毎日新聞)
"12月1日に外国特派員協会で記者会見
田母神が公職にないため同省幹部は接触を控えているが「誰も一民間人の話とは受け取らず、発言のたびに政権批判が再燃する」(内局幹部)。同省は、田母神の日程リストをまとめ浜田靖一防衛相にも報告した"
http://mainichi.jp/select/today/news/20081130k0000m010061000c.html


被害者参加制度」(12月15日施行)
ほぼ裁判員制度の対象と同一。
被害者・遺族が希望し、裁判所が認めれば検察官の隣に座って被告に直接質問することが可能となり、検察官の求刑に対して「もっと重くすべきだ」などと意見も述べられる。また、弁護士を付けることも認められている。
この制度は、12月1日以降に起訴された事件に適用される。起訴後、公判開始まで準備が必要なことから、実際に制度が動き出すのは早くても年明けになる"
http://sankei.jp.msn.com/affairs/trial/081130/trl0811300248001-n1.htm


裁判員」来た、(読売新聞)
"「裁判員候補者名簿記載通知書」を受け取った東京都新宿区の70歳代の無職女性は、まず不安を感じた。"
http://www.yomiuri.co.jp/feature/20081128-033595/news/20081130-OYT1T00167.htm
裁判員候補 どうしよう、通知きちゃった (朝日新聞 )
"神奈川県大和市の無職男性(65)の家にも、通知が届いたが、あて名は福祉施設に入所する義母(87)。認知症があり、耳もほとんど聞こえない"
選挙人名簿から選ばれた約29万5千人に対し、最高裁が28日に発送した。辞退が認められた人を除く候補者から、事件ごとに数十人がくじで選ばれ、来年5月以降に改めて通知を受ける。実際に裁判所に足を運ぶことになるのは、来年7月以降
http://www.asahi.com/national/update/1130/TKY200811290295.html




Operation Cyclon と名づけたそうだ
Troops search Mumbai siege hotel
Police in Mumbai say they have succeeded in killing the last three members of the gang inside the Taj Mahal Palace hotel."
http://news.bbc.co.uk/2/hi/video_and_audio/default.stm

Blast hits Thai government house
"A grenade explosion has injured at least 11 people inside the opposition-occupied government house in the Thai capital Bangkok." BBC NEWS
http://news.bbc.co.uk/2/hi/asia-pacific/7756766.stm
Riots 'kill hundreds in Nigeria'
"Hundreds of people are reported to have been killed in central Nigeria after Christians and Muslims clashed over the result of a local election." BBC NEWS
http://news.bbc.co.uk/2/hi/africa/7756695.stm




11月 酉の市29日(土)
2009年は12(木) と24(火)

[0807.0879] Experimental constraints on a dark matter origin for the DAMA annual modulation effect
"A claim for evidence of dark matter interactions in the DAMA experiment has been recently reinforced. "
http://arxiv.org/abs/0807.0879
The Great Beyond: DAMA dark matter debunked?
"One particularly controversial experiment is known as DAMA/LIBRA. It's located beneath the Italian mountain of Gran Sasso, and it's claiming to see an annual fluctuation of dark matter as the earth flies through a galactic halo of the stuff."
http://blogs.nature.com/news/thegreatbeyond/2008/11/dama_debunked.html
DAMA (Dark Matter)
http://www.lngs.infn.it/lngs_infn/contents/lngs_en/research/experiments_scientific_info/experiments/current/dama/?language=lngs_en


amin|@Victor Entertainment
http://www.jvcmusic.co.jp/-/Artist/A022059.html





SATURDAY, NOVEMBER 29 - FD 16
228...ENDEAVOUR CREW WAKE UP (FD 16)..........14/09:00...04:55 AM...09:55
229...VTR PLAYBACK............................14/11:55...07:50 AM...12:50
230...CABIN STOWAGE BEGINS....................14/12:15...08:10 AM...13:10
230...HD FLIGHT DAY 16 CREW HIGHLIGHTS........14/12:35...08:30 AM...13:30
231...OBSS BERTH..............................14/13:45...09:40 AM...14:40
231...FCS CHECKOUT............................14/14:45...10:40 AM...15:40
232...RCS HOT-FIRE TEST.......................14/16:00...11:55 AM...16:55
232.*.CREW DEORBIT PREPARATION BRIEFING.......14/16:15...12:10 PM...17:10
233...CNN/KRON-TV, KATU-TV....................14/16:45...12:40 PM...17:40
234...POST MMT BRIEFING.......................14/18:35...02:30 PM...19:30
235...PICOSAT DEPLOY..........................14/19:40...03:35 PM...20:35
235...MISSION STATUS BRIEFING.................14/20:35...04:30 PM...21:30
236.*.CHAMITOFF'S RECUMBENT SEAT SET UP.......14/21:25...05:20 PM...22:20
236...KU STOW.................................14/21:50...05:45 PM...22:45
238...ENDEAVOUR CREW SLEEP BEGINS.............15/01:00...08:55 PM...01:55
238...FLIGHT DAY 16 HIGHLIGHTS................15/01:05...09:00 PM...02:00


Landing is targeted for the Kennedy Space Center's Shuttle Landing Facility at about 1:18 p.m. Sunday.
NASA ミッション期間を1日延長
STS-126エンデバー
12月1日午前3時18分帰還予定






日程再掲
Flight Day 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
• Shuttle Robotic Arm Activation
• Umbilical Well and Handheld External
Tank Photo Downlink



Flight Day 2
• Endeavour Thermal Protection System
Survey with Shuttle Robotic Arm/
OrbiterBoom Sensor System (OBSS)
• Extravehicular Mobility Unit Checkout
• Centerline Camera Installation
• Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout



Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
by the Expedition 18 Crew
• Docking to Harmony/Pressurized Mating
Adapter‐2
• Hatch Opening and Welcoming
Magnus and Chamitoff Exchange Soyuz
Seatliners; Magnus Joins Expedition 18,
Chamitoff Joins the STS‐126 Crew
• OBSS Handoff from Canadarm2 to Shuttle
Robotic Arm








Flight Day 4
• Canadarm2 Grapple and Unberthing of
Leonardo Multi‐Purpose Logistics Module
(MPLM) from Endeavour’s cargo bay
• Installation of Leonardo MPLM onto Nadir
Port of Harmony/Node 2
• Shuttle/ISS Transfers
• Leonardo MPLM Ingress
• EVA 1 Procedure Review
• EVA 1 Campout by Piper and Bowen



Flight Day 5
• EVA Preparations
• EVA 1 by Piper and Bowen (Nitrogen Tank
Assembly replacement, assorted station
assembly tasks, start of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
• Shuttle/ISS Transfers



Flight Day 6
• Start of Installation of New Environmental
Systems and Crew Habitability Equipment
for Six‐Person Crew
• Shuttle Robotic Arm/OBSS Focused
Inspection of Endeavour’s Thermal
Protection System, if Required
• Shuttle/ISS Transfers
• EVA 2 Procedure Review
• EVA 2 Campout by Piper and Kimbrough




Flight Day 7
• EVA Preparations
• EVA 2 by Piper and Kimbrough (Crew and
Equipment Translation Aid (CETA) Cart
Relocation, lubrication of Canadarm2 end
effector, continuation of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
GPS Antenna Assembly
• Shuttle/ISS Transfers




Flight Day 8
• Kibo Experiment Facility Berthing
Mechanism Checkout
• Camera System Assembly
• Joint Crew News Conference
• Crew Off Duty Time
• Shuttle/ISS Transfers
• EVA 3 Procedure Review
• EVA 3 Campout by Piper and Bowen




Flight Day 9
• EVA Preparations
• EVA 3 by Piper and Bowen (continuation of
cleaning and lubrication of starboard Solar
Alpha Rotary Joint)
• Shuttle/ISS Transfers


Flight Day 10
• Crew Off Duty Period
• Shuttle/ISS Transfers
• EVA 4 Procedure Review
• EVA 4 Campout by Bowen and Kimbrough



Flight Day 11
• EVA Preparations
• EVA 4 by Bowen and Kimbrough (Thermal
cover removal from Kibo module,
lubrication of port Solar Alpha Rotary Joint,
installation of GPS antenna on Kibo,
thermal cover removal from P3 truss,
installation of camera system on truss)
• Shuttle/ISS Transfers



Flight Day 12
• Final Shuttle/ISS Transfers
• Leonardo MPLM Egress and
Depressurization
• Canadarm2 Removal of Leonardo MPLM
from Harmony/Node 2 and Berthing in
Endeavour’s Cargo Bay



Flight Day 13
• Crew Off Duty Time
Rendezvous Tool Checkout
• Final Farewells and Hatch Closure
• Centerline Camera Installation



Flight Day 14
• Undocking
• Flyaround of the International Space Station
• Final Separation
• OBSS Late Inspection of Endeavour’s
Thermal Protection System



Flight Day 15
• Flight Control System Checkout
• Reaction Control System Hot‐Fire Test
• Picosat Deployment
• Cabin Stowage
• Chamitoff’s Recumbent Seat Set Up
• Crew Deorbit Briefing
• Ku‐Band Antenna Stowage




Flight Day 16
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
NASA’s Kennedy Space Center Landing




CBS News Space Place - Space Shuttle Facts & Figures
http://www.cbsnews.com/network/news/space/currentglance.html




「2008NHK杯国際フィギュアスケート競技大会」
30日(日)まで国立代々木競技場・第一体育館
11月29日(土)
17:00〜17:59 ペア フリー・アイスダンス フリーダンス
19:30〜20:43 女子シングル フリー




2008年11月28日、「嫦娥1号」、月面で最も標高が高い場所は世界最高峰のチョモランマより1000m高い9840m。
ニューサイト「東方網」が伝えた。
最も標高が低い場所は南極エイトケン盆地の9230km
嫦娥1号」プロジェクトのVLBI(超長基線電波干渉計)技術主任、平勁松(ピン・ジンソン)氏は「月面標高の最高地点と最低地点には、まだ名前がついていない。(今回の快挙で)中国人が命名することが出来れば」と語った。
http://www.recordchina.co.jp/group/g26242.html


毛利衛さん:偉業たたえる宇宙記念館が休館へ 北海道余市 (毎日新聞)
"初年度は15万人以上が訪れたが、その後減り続け、今年度は10月末現在で3万3554人まで落ち込んだ"
http://mainichi.jp/select/science/news/20081130k0000m040087000c.html



厚木基地に続く謎の専用線を探るの巻 | マイコミジャーナル
厚木基地といっても、神奈川県厚木市にはない。厚木基地がある綾瀬市大和市
"「在日米軍横須賀海軍施設」から横須賀線田浦駅を経て、あるいは「在日米軍鶴見貯油施設エリア」から鶴見線安善駅を経て輸送されてきた貨物列車は、このポイントから厚木基地に入っていったのだろう。"
http://journal.mycom.co.jp/column/nekomachi/024/


幼稚な歴史観で講演 相槌を打つ"濡れ衣"組 お笑い会にようこそッ
防衛省:田母神講演に苦慮「手の打ちようない」 (毎日新聞)
"12月1日に外国特派員協会で記者会見
田母神が公職にないため同省幹部は接触を控えているが「誰も一民間人の話とは受け取らず、発言のたびに政権批判が再燃する」(内局幹部)。同省は、田母神の日程リストをまとめ浜田靖一防衛相にも報告した"
http://mainichi.jp/select/today/news/20081130k0000m010061000c.html


被害者参加制度」(12月15日施行)
ほぼ裁判員制度の対象と同一。
被害者・遺族が希望し、裁判所が認めれば検察官の隣に座って被告に直接質問することが可能となり、検察官の求刑に対して「もっと重くすべきだ」などと意見も述べられる。また、弁護士を付けることも認められている。
この制度は、12月1日以降に起訴された事件に適用される。起訴後、公判開始まで準備が必要なことから、実際に制度が動き出すのは早くても年明けになる"
http://sankei.jp.msn.com/affairs/trial/081130/trl0811300248001-n1.htm


裁判員」来た、(読売新聞)
"「裁判員候補者名簿記載通知書」を受け取った東京都新宿区の70歳代の無職女性は、まず不安を感じた。"
http://www.yomiuri.co.jp/feature/20081128-033595/news/20081130-OYT1T00167.htm
裁判員候補 どうしよう、通知きちゃった (朝日新聞 )
"神奈川県大和市の無職男性(65)の家にも、通知が届いたが、あて名は福祉施設に入所する義母(87)。認知症があり、耳もほとんど聞こえない"
選挙人名簿から選ばれた約29万5千人に対し、最高裁が28日に発送した。辞退が認められた人を除く候補者から、事件ごとに数十人がくじで選ばれ、来年5月以降に改めて通知を受ける。実際に裁判所に足を運ぶことになるのは、来年7月以降
http://www.asahi.com/national/update/1130/TKY200811290295.html




Operation Cyclon と名づけたそうだ
Troops search Mumbai siege hotel
Police in Mumbai say they have succeeded in killing the last three members of the gang inside the Taj Mahal Palace hotel."
http://news.bbc.co.uk/2/hi/video_and_audio/default.stm

Blast hits Thai government house
"A grenade explosion has injured at least 11 people inside the opposition-occupied government house in the Thai capital Bangkok." BBC NEWS
http://news.bbc.co.uk/2/hi/asia-pacific/7756766.stm
Riots 'kill hundreds in Nigeria'
"Hundreds of people are reported to have been killed in central Nigeria after Christians and Muslims clashed over the result of a local election." BBC NEWS
http://news.bbc.co.uk/2/hi/africa/7756695.stm




11月 酉の市29日(土)
2009年は12(木) と24(火)

[0807.0879] Experimental constraints on a dark matter origin for the DAMA annual modulation effect
"A claim for evidence of dark matter interactions in the DAMA experiment has been recently reinforced. "
http://arxiv.org/abs/0807.0879
The Great Beyond: DAMA dark matter debunked?
"One particularly controversial experiment is known as DAMA/LIBRA. It's located beneath the Italian mountain of Gran Sasso, and it's claiming to see an annual fluctuation of dark matter as the earth flies through a galactic halo of the stuff."
http://blogs.nature.com/news/thegreatbeyond/2008/11/dama_debunked.html
DAMA (Dark Matter)
http://www.lngs.infn.it/lngs_infn/contents/lngs_en/research/experiments_scientific_info/experiments/current/dama/?language=lngs_en


amin|@Victor Entertainment
http://www.jvcmusic.co.jp/-/Artist/A022059.html





SATURDAY, NOVEMBER 29 - FD 16
228...ENDEAVOUR CREW WAKE UP (FD 16)..........14/09:00...04:55 AM...09:55
229...VTR PLAYBACK............................14/11:55...07:50 AM...12:50
230...CABIN STOWAGE BEGINS....................14/12:15...08:10 AM...13:10
230...HD FLIGHT DAY 16 CREW HIGHLIGHTS........14/12:35...08:30 AM...13:30
231...OBSS BERTH..............................14/13:45...09:40 AM...14:40
231...FCS CHECKOUT............................14/14:45...10:40 AM...15:40
232...RCS HOT-FIRE TEST.......................14/16:00...11:55 AM...16:55
232.*.CREW DEORBIT PREPARATION BRIEFING.......14/16:15...12:10 PM...17:10
233...CNN/KRON-TV, KATU-TV....................14/16:45...12:40 PM...17:40
234...POST MMT BRIEFING.......................14/18:35...02:30 PM...19:30
235...PICOSAT DEPLOY..........................14/19:40...03:35 PM...20:35
235...MISSION STATUS BRIEFING.................14/20:35...04:30 PM...21:30
236.*.CHAMITOFF'S RECUMBENT SEAT SET UP.......14/21:25...05:20 PM...22:20
236...KU STOW.................................14/21:50...05:45 PM...22:45
238...ENDEAVOUR CREW SLEEP BEGINS.............15/01:00...08:55 PM...01:55
238...FLIGHT DAY 16 HIGHLIGHTS................15/01:05...09:00 PM...02:00


Landing is targeted for the Kennedy Space Center's Shuttle Landing Facility at about 1:18 p.m. Sunday.
NASA ミッション期間を1日延長
STS-126エンデバー
12月1日午前3時18分帰還予定






日程再掲
Flight Day 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
• Shuttle Robotic Arm Activation
• Umbilical Well and Handheld External
Tank Photo Downlink



Flight Day 2
• Endeavour Thermal Protection System
Survey with Shuttle Robotic Arm/
OrbiterBoom Sensor System (OBSS)
• Extravehicular Mobility Unit Checkout
• Centerline Camera Installation
• Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout



Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
by the Expedition 18 Crew
• Docking to Harmony/Pressurized Mating
Adapter‐2
• Hatch Opening and Welcoming
Magnus and Chamitoff Exchange Soyuz
Seatliners; Magnus Joins Expedition 18,
Chamitoff Joins the STS‐126 Crew
• OBSS Handoff from Canadarm2 to Shuttle
Robotic Arm








Flight Day 4
• Canadarm2 Grapple and Unberthing of
Leonardo Multi‐Purpose Logistics Module
(MPLM) from Endeavour’s cargo bay
• Installation of Leonardo MPLM onto Nadir
Port of Harmony/Node 2
• Shuttle/ISS Transfers
• Leonardo MPLM Ingress
• EVA 1 Procedure Review
• EVA 1 Campout by Piper and Bowen



Flight Day 5
• EVA Preparations
• EVA 1 by Piper and Bowen (Nitrogen Tank
Assembly replacement, assorted station
assembly tasks, start of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
• Shuttle/ISS Transfers



Flight Day 6
• Start of Installation of New Environmental
Systems and Crew Habitability Equipment
for Six‐Person Crew
• Shuttle Robotic Arm/OBSS Focused
Inspection of Endeavour’s Thermal
Protection System, if Required
• Shuttle/ISS Transfers
• EVA 2 Procedure Review
• EVA 2 Campout by Piper and Kimbrough




Flight Day 7
• EVA Preparations
• EVA 2 by Piper and Kimbrough (Crew and
Equipment Translation Aid (CETA) Cart
Relocation, lubrication of Canadarm2 end
effector, continuation of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
GPS Antenna Assembly
• Shuttle/ISS Transfers




Flight Day 8
• Kibo Experiment Facility Berthing
Mechanism Checkout
• Camera System Assembly
• Joint Crew News Conference
• Crew Off Duty Time
• Shuttle/ISS Transfers
• EVA 3 Procedure Review
• EVA 3 Campout by Piper and Bowen




Flight Day 9
• EVA Preparations
• EVA 3 by Piper and Bowen (continuation of
cleaning and lubrication of starboard Solar
Alpha Rotary Joint)
• Shuttle/ISS Transfers


Flight Day 10
• Crew Off Duty Period
• Shuttle/ISS Transfers
• EVA 4 Procedure Review
• EVA 4 Campout by Bowen and Kimbrough



Flight Day 11
• EVA Preparations
• EVA 4 by Bowen and Kimbrough (Thermal
cover removal from Kibo module,
lubrication of port Solar Alpha Rotary Joint,
installation of GPS antenna on Kibo,
thermal cover removal from P3 truss,
installation of camera system on truss)
• Shuttle/ISS Transfers



Flight Day 12
• Final Shuttle/ISS Transfers
• Leonardo MPLM Egress and
Depressurization
• Canadarm2 Removal of Leonardo MPLM
from Harmony/Node 2 and Berthing in
Endeavour’s Cargo Bay



Flight Day 13
• Crew Off Duty Time
Rendezvous Tool Checkout
• Final Farewells and Hatch Closure
• Centerline Camera Installation



Flight Day 14
• Undocking
• Flyaround of the International Space Station
• Final Separation
• OBSS Late Inspection of Endeavour’s
Thermal Protection System



Flight Day 15
• Flight Control System Checkout
• Reaction Control System Hot‐Fire Test
• Picosat Deployment
• Cabin Stowage
• Chamitoff’s Recumbent Seat Set Up
• Crew Deorbit Briefing
• Ku‐Band Antenna Stowage




Flight Day 16
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
NASA’s Kennedy Space Center Landing




CBS News Space Place - Space Shuttle Facts & Figures
http://www.cbsnews.com/network/news/space/currentglance.html




「2008NHK杯国際フィギュアスケート競技大会」
30日(日)まで国立代々木競技場・第一体育館
11月29日(土)
17:00〜17:59 ペア フリー・アイスダンス フリーダンス
19:30〜20:43 女子シングル フリー




2008年11月28日、「嫦娥1号」、月面で最も標高が高い場所は世界最高峰のチョモランマより1000m高い9840m。
ニューサイト「東方網」が伝えた。
最も標高が低い場所は南極エイトケン盆地の9230km
嫦娥1号」プロジェクトのVLBI(超長基線電波干渉計)技術主任、平勁松(ピン・ジンソン)氏は「月面標高の最高地点と最低地点には、まだ名前がついていない。(今回の快挙で)中国人が命名することが出来れば」と語った。
http://www.recordchina.co.jp/group/g26242.html


毛利衛さん:偉業たたえる宇宙記念館が休館へ 北海道余市 (毎日新聞)
"初年度は15万人以上が訪れたが、その後減り続け、今年度は10月末現在で3万3554人まで落ち込んだ"
http://mainichi.jp/select/science/news/20081130k0000m040087000c.html



厚木基地に続く謎の専用線を探るの巻 | マイコミジャーナル
厚木基地といっても、神奈川県厚木市にはない。厚木基地がある綾瀬市大和市
"「在日米軍横須賀海軍施設」から横須賀線田浦駅を経て、あるいは「在日米軍鶴見貯油施設エリア」から鶴見線安善駅を経て輸送されてきた貨物列車は、このポイントから厚木基地に入っていったのだろう。"
http://journal.mycom.co.jp/column/nekomachi/024/


幼稚な歴史観で講演 相槌を打つ"濡れ衣"組 お笑い会にようこそッ
防衛省:田母神講演に苦慮「手の打ちようない」 (毎日新聞)
"12月1日に外国特派員協会で記者会見
田母神が公職にないため同省幹部は接触を控えているが「誰も一民間人の話とは受け取らず、発言のたびに政権批判が再燃する」(内局幹部)。同省は、田母神の日程リストをまとめ浜田靖一防衛相にも報告した"
http://mainichi.jp/select/today/news/20081130k0000m010061000c.html


被害者参加制度」(12月15日施行)
ほぼ裁判員制度の対象と同一。
被害者・遺族が希望し、裁判所が認めれば検察官の隣に座って被告に直接質問することが可能となり、検察官の求刑に対して「もっと重くすべきだ」などと意見も述べられる。また、弁護士を付けることも認められている。
この制度は、12月1日以降に起訴された事件に適用される。起訴後、公判開始まで準備が必要なことから、実際に制度が動き出すのは早くても年明けになる"
http://sankei.jp.msn.com/affairs/trial/081130/trl0811300248001-n1.htm


裁判員」来た、(読売新聞)
"「裁判員候補者名簿記載通知書」を受け取った東京都新宿区の70歳代の無職女性は、まず不安を感じた。"
http://www.yomiuri.co.jp/feature/20081128-033595/news/20081130-OYT1T00167.htm
裁判員候補 どうしよう、通知きちゃった (朝日新聞 )
"神奈川県大和市の無職男性(65)の家にも、通知が届いたが、あて名は福祉施設に入所する義母(87)。認知症があり、耳もほとんど聞こえない"
選挙人名簿から選ばれた約29万5千人に対し、最高裁が28日に発送した。辞退が認められた人を除く候補者から、事件ごとに数十人がくじで選ばれ、来年5月以降に改めて通知を受ける。実際に裁判所に足を運ぶことになるのは、来年7月以降
http://www.asahi.com/national/update/1130/TKY200811290295.html




Operation Cyclon と名づけたそうだ
Troops search Mumbai siege hotel
Police in Mumbai say they have succeeded in killing the last three members of the gang inside the Taj Mahal Palace hotel."
http://news.bbc.co.uk/2/hi/video_and_audio/default.stm

Blast hits Thai government house
"A grenade explosion has injured at least 11 people inside the opposition-occupied government house in the Thai capital Bangkok." BBC NEWS
http://news.bbc.co.uk/2/hi/asia-pacific/7756766.stm
Riots 'kill hundreds in Nigeria'
"Hundreds of people are reported to have been killed in central Nigeria after Christians and Muslims clashed over the result of a local election." BBC NEWS
http://news.bbc.co.uk/2/hi/africa/7756695.stm









11月 酉の市29日(土)
2009年は12(木) と24(火)

[0807.0879] Experimental constraints on a dark matter origin for the DAMA annual modulation effect
"A claim for evidence of dark matter interactions in the DAMA experiment has been recently reinforced. "
http://arxiv.org/abs/0807.0879
The Great Beyond: DAMA dark matter debunked?
"One particularly controversial experiment is known as DAMA/LIBRA. It's located beneath the Italian mountain of Gran Sasso, and it's claiming to see an annual fluctuation of dark matter as the earth flies through a galactic halo of the stuff."
http://blogs.nature.com/news/thegreatbeyond/2008/11/dama_debunked.html
DAMA (Dark Matter)
http://www.lngs.infn.it/lngs_infn/contents/lngs_en/research/experiments_scientific_info/experiments/current/dama/?language=lngs_en


amin|@Victor Entertainment
http://www.jvcmusic.co.jp/-/Artist/A022059.html





SATURDAY, NOVEMBER 29 - FD 16
228...ENDEAVOUR CREW WAKE UP (FD 16)..........14/09:00...04:55 AM...09:55
229...VTR PLAYBACK............................14/11:55...07:50 AM...12:50
230...CABIN STOWAGE BEGINS....................14/12:15...08:10 AM...13:10
230...HD FLIGHT DAY 16 CREW HIGHLIGHTS........14/12:35...08:30 AM...13:30
231...OBSS BERTH..............................14/13:45...09:40 AM...14:40
231...FCS CHECKOUT............................14/14:45...10:40 AM...15:40
232...RCS HOT-FIRE TEST.......................14/16:00...11:55 AM...16:55
232.*.CREW DEORBIT PREPARATION BRIEFING.......14/16:15...12:10 PM...17:10
233...CNN/KRON-TV, KATU-TV....................14/16:45...12:40 PM...17:40
234...POST MMT BRIEFING.......................14/18:35...02:30 PM...19:30
235...PICOSAT DEPLOY..........................14/19:40...03:35 PM...20:35
235...MISSION STATUS BRIEFING.................14/20:35...04:30 PM...21:30
236.*.CHAMITOFF'S RECUMBENT SEAT SET UP.......14/21:25...05:20 PM...22:20
236...KU STOW.................................14/21:50...05:45 PM...22:45
238...ENDEAVOUR CREW SLEEP BEGINS.............15/01:00...08:55 PM...01:55
238...FLIGHT DAY 16 HIGHLIGHTS................15/01:05...09:00 PM...02:00


Landing is targeted for the Kennedy Space Center's Shuttle Landing Facility at about 1:18 p.m. Sunday.
NASA ミッション期間を1日延長
STS-126エンデバー
12月1日午前3時18分帰還予定






日程再掲
Flight Day 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
• Shuttle Robotic Arm Activation
• Umbilical Well and Handheld External
Tank Photo Downlink



Flight Day 2
• Endeavour Thermal Protection System
Survey with Shuttle Robotic Arm/
OrbiterBoom Sensor System (OBSS)
• Extravehicular Mobility Unit Checkout
• Centerline Camera Installation
• Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout



Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
by the Expedition 18 Crew
• Docking to Harmony/Pressurized Mating
Adapter‐2
• Hatch Opening and Welcoming
Magnus and Chamitoff Exchange Soyuz
Seatliners; Magnus Joins Expedition 18,
Chamitoff Joins the STS‐126 Crew
• OBSS Handoff from Canadarm2 to Shuttle
Robotic Arm








Flight Day 4
• Canadarm2 Grapple and Unberthing of
Leonardo Multi‐Purpose Logistics Module
(MPLM) from Endeavour’s cargo bay
• Installation of Leonardo MPLM onto Nadir
Port of Harmony/Node 2
• Shuttle/ISS Transfers
• Leonardo MPLM Ingress
• EVA 1 Procedure Review
• EVA 1 Campout by Piper and Bowen



Flight Day 5
• EVA Preparations
• EVA 1 by Piper and Bowen (Nitrogen Tank
Assembly replacement, assorted station
assembly tasks, start of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
• Shuttle/ISS Transfers



Flight Day 6
• Start of Installation of New Environmental
Systems and Crew Habitability Equipment
for Six‐Person Crew
• Shuttle Robotic Arm/OBSS Focused
Inspection of Endeavour’s Thermal
Protection System, if Required
• Shuttle/ISS Transfers
• EVA 2 Procedure Review
• EVA 2 Campout by Piper and Kimbrough




Flight Day 7
• EVA Preparations
• EVA 2 by Piper and Kimbrough (Crew and
Equipment Translation Aid (CETA) Cart
Relocation, lubrication of Canadarm2 end
effector, continuation of cleaning and
lubrication of starboard Solar Alpha Rotary
Joint)
GPS Antenna Assembly
• Shuttle/ISS Transfers




Flight Day 8
• Kibo Experiment Facility Berthing
Mechanism Checkout
• Camera System Assembly
• Joint Crew News Conference
• Crew Off Duty Time
• Shuttle/ISS Transfers
• EVA 3 Procedure Review
• EVA 3 Campout by Piper and Bowen




Flight Day 9
• EVA Preparations
• EVA 3 by Piper and Bowen (continuation of
cleaning and lubrication of starboard Solar
Alpha Rotary Joint)
• Shuttle/ISS Transfers


Flight Day 10
• Crew Off Duty Pe