nexus6

nexus6

シャトル退役スケジュール





http://www.nasa.gov/pdf/208615main_iss2008.pdf
International Space Station Calendar
http://www.nasa.gov/mission_pages/station/main/index.html


Latest Servicing Mission 4 News
"Space Shuttle Atlantis Undergoing Preparations in the Orbiter Processing Facility"
http://www.nasa.gov/mission_pages/hubble/servicing/SM4/main/index.html
Date: Oct. 8 +
STS-125
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Atlantis will fly seven astronauts into space for the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


Date: Nov. 10 +
STS-126
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the International Space Station.



Date: Nov. 24 *
LRO/LCROSS
Launch Vehicle: United Launch Alliance Atlas V
Launch Site: Cape Canaveral Air Force Station - Launch Complex 41
Description: The mission objectives of the Lunar Crater Observation and Sensing Satellite are to advance the Vision for Space Exploration by confirming the presence or absence of water ice in a permanently shadowed crater at either the Moon's North or South Pole.


STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
2009 Launches
Date: Feb. 12 +
Mission: STS-119
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery launching on assembly flight 15A, will deliver the fourth starboard truss segment to the International Space Station.


Date: May 15 +
STS-127
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the exposed facility of Japan's Kibo laboratory to the International Space Station.


Date: July 30 +
STS-128
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will use a Multi-Purpose Logistics Module to carry experiment and storage racks to the International Space Station.
Establish Six Person Crew Capability


Targeted for Sept. 2009
HTV-1 H-IIB
Japanese H-II Transfer Vehicle
http://www.nasa.gov/mission_pages/station/structure/iss_manifest.html



Date: Oct. 15 +
STS-129
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery will deliver components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm to the International Space Station.


Date: Dec. 10 +
STS-130
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the final connecting node, Node 3, and the Cupola, a robotic control station with six windows around its sides and another in the center that provides a 360-degree view around the International Space Station.


2010 Launches
Date: Feb. 11 +
STS-131
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will carry a Multi-Purpose Logistics Module filled with science racks that will be transferred to laboratories of the International Space Station.

Date: April 8 +
STS-132
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery mission will carry an integrated cargo carrier to deliver maintenance and assembly hardware, including spare parts for space station systems. In addition, the second in a series of new pressurized components for Russia, a Mini Research Module, will be permanently attached to the bottom port of the Zarya module.


Date: May 31 +
STS-133
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver critical spare components including antennas and gas tanks to the International Space Station.




Astronomers Discover the First Ring Around a Moon | DISCOVER Magazine
"the mission scientists are eager to gather more data when Cassini returns to Rhea in 2010.
Related Articles
Mercury's Secrets Revealed
More than 1,000 new images of the planet reveal startling results. April 08, 2008
Mission to the Forgotten Planets
Before the Pluto fiasco, two asteroids were stripped of planet status. March 11, 2008
98. Twin Probes Watch Sun’s Fury in 3-D
January 15, 2008
94. Saturn Seen In New Light
January 15, 2008
67. Mars Rover Delves Int"
http://discovermagazine.com/2008/jul/07-astronomers-discover-first-ring-around-moon-rhea




July 8, Tuesday
2 p.m. - ISS Expedition 17 Mission Status and Spacewalk Preview Briefing - JSC (Public and Media Channels)

July 9, Wednesday
4 - 4:20 p.m. - KSTP-TV, St. Paul, MN Interview with STS-124 Mission Specialist Karen Nyberg - JSC (Public and Media Channels)

フライト名 従来打上げ目標日 新たな打上げ目標日
STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
STS-119/国際宇宙ステーションISS)組立ミッション(15A)
太陽電池パドルを搭載したS6トラス(柱状の構造物)をISSに取り付けます。
飛行期間は約14日間で4回の船外活動を行う予定です。
STS-127/国際宇宙ステーションISS)組立ミッション(2J/A)
「きぼう」の船外実験プラットフォームと船外パレットを運んで「きぼう」
船内実験室の先に取り付けます。飛行期間は約15日間で5回の船外活動を行
う予定です。
発表日:平成20年7月8日 発表:宇宙航空研究開発機構

Space agency leaders to gather in Paris - ESA Portal
" 7 July 2008
ESA PR 31-2008. On 17 July ESA will host an ISS Heads of Agency meeting at which leaders of the space agencies participating in the ISS programme (ESA for Europe, NASA for the US, CSA for Canada, JAXA for Japan, Roscosmos for Russia) will take stock of the ISS status and decide on future activities."
http://www.esa.int/esaCP/SEMW8TSHKHF_index_0.html



07/09まで 洞爺湖サミット
http://www.mofa.go.jp/mofaj/gaiko/summit/toyako08/index.html

世界の石油供給、5大「急所」――「攻撃されれば国際経済が危機に」 | WIRED
"『New Scientist』誌はこのような警告を発している。
同誌は6月28日号で、世界の石油供給網の脆弱さを分析し、その上で、多くの国が石油に依存しているが、その石油は輸送と処理の数少ない拠点に依存している、という恐ろしい実態を指摘した。
1つの供給網が崩壊したとの認識が広まるだけで石油価格が高騰し、破滅的な結果を招く恐れがあるということだ。
石油供給網の5つの要所を紹介する。いずれも、事故または故意の攻撃によって深刻な妨害を受けた場合、世界の供給システムの秩序が崩壊することになる。"
http://wiredvision.jp/news/200807/2008070823.html
Oil: The final warning - earth - New Scientist Environment
http://environment.newscientist.com/channel/earth/mg19826621.500-oil-the-final-warning.html


"China's Hu proposes priorities for further cooperation among five major developing countries" English_Xinhua
http://news.xinhuanet.com/english/2008-07/08/content_8512144.htm





26世紀前の皆既日食タレスの予測が的中、戦争も止める | WIRED
"紀元前585年:日食が、小アジアの戦を突如中断させた。交戦中の軍は武器を捨て、停戦を宣言した――後世の歴史天文学は、この出来事が起こったと思われる日にちを割り出している。正確さには議論の余地があるが、この日付は、古代史におけるいくつかの出来事の月日を特定するための基準点となった"
http://wiredvision.jp/news/200807/2008070821.html



マイクロ波で脳内に音を発生させる兵器『MEDUSA』:「サブリミナルメッセージも」 | WIRED VISION
"「マイクロ波聴覚効果」(フレイ効果)――マイクロ波を[パルス波形にして人に]照射すると、頭部との相互作用で[頭の中から発せられたような]音が聞こえる現象
鳥はマイクロ波の音に非常に敏感と考えられるため、鳥の群れを風力発電基地から追い払う――"
http://wiredvision.jp/news/200807/2008070822.html



第24回 イメージが重要 | WIRED VISION
http://wiredvision.jp/blog/masui/200807/200807080800.html








http://www.nasa.gov/pdf/208615main_iss2008.pdf
International Space Station Calendar
http://www.nasa.gov/mission_pages/station/main/index.html


Latest Servicing Mission 4 News
"Space Shuttle Atlantis Undergoing Preparations in the Orbiter Processing Facility"
http://www.nasa.gov/mission_pages/hubble/servicing/SM4/main/index.html
Date: Oct. 8 +
STS-125
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Atlantis will fly seven astronauts into space for the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


Date: Nov. 10 +
STS-126
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the International Space Station.



Date: Nov. 24 *
LRO/LCROSS
Launch Vehicle: United Launch Alliance Atlas V
Launch Site: Cape Canaveral Air Force Station - Launch Complex 41
Description: The mission objectives of the Lunar Crater Observation and Sensing Satellite are to advance the Vision for Space Exploration by confirming the presence or absence of water ice in a permanently shadowed crater at either the Moon's North or South Pole.


STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
2009 Launches
Date: Feb. 12 +
Mission: STS-119
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery launching on assembly flight 15A, will deliver the fourth starboard truss segment to the International Space Station.


Date: May 15 +
STS-127
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the exposed facility of Japan's Kibo laboratory to the International Space Station.


Date: July 30 +
STS-128
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will use a Multi-Purpose Logistics Module to carry experiment and storage racks to the International Space Station.
Establish Six Person Crew Capability


Targeted for Sept. 2009
HTV-1 H-IIB
Japanese H-II Transfer Vehicle
http://www.nasa.gov/mission_pages/station/structure/iss_manifest.html



Date: Oct. 15 +
STS-129
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery will deliver components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm to the International Space Station.


Date: Dec. 10 +
STS-130
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the final connecting node, Node 3, and the Cupola, a robotic control station with six windows around its sides and another in the center that provides a 360-degree view around the International Space Station.


2010 Launches
Date: Feb. 11 +
STS-131
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will carry a Multi-Purpose Logistics Module filled with science racks that will be transferred to laboratories of the International Space Station.

Date: April 8 +
STS-132
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery mission will carry an integrated cargo carrier to deliver maintenance and assembly hardware, including spare parts for space station systems. In addition, the second in a series of new pressurized components for Russia, a Mini Research Module, will be permanently attached to the bottom port of the Zarya module.


Date: May 31 +
STS-133
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver critical spare components including antennas and gas tanks to the International Space Station.




Astronomers Discover the First Ring Around a Moon | DISCOVER Magazine
"the mission scientists are eager to gather more data when Cassini returns to Rhea in 2010.
Related Articles
Mercury's Secrets Revealed
More than 1,000 new images of the planet reveal startling results. April 08, 2008
Mission to the Forgotten Planets
Before the Pluto fiasco, two asteroids were stripped of planet status. March 11, 2008
98. Twin Probes Watch Sun’s Fury in 3-D
January 15, 2008
94. Saturn Seen In New Light
January 15, 2008
67. Mars Rover Delves Int"
http://discovermagazine.com/2008/jul/07-astronomers-discover-first-ring-around-moon-rhea




July 8, Tuesday
2 p.m. - ISS Expedition 17 Mission Status and Spacewalk Preview Briefing - JSC (Public and Media Channels)

July 9, Wednesday
4 - 4:20 p.m. - KSTP-TV, St. Paul, MN Interview with STS-124 Mission Specialist Karen Nyberg - JSC (Public and Media Channels)

フライト名 従来打上げ目標日 新たな打上げ目標日
STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
STS-119/国際宇宙ステーションISS)組立ミッション(15A)
太陽電池パドルを搭載したS6トラス(柱状の構造物)をISSに取り付けます。
飛行期間は約14日間で4回の船外活動を行う予定です。
STS-127/国際宇宙ステーションISS)組立ミッション(2J/A)
「きぼう」の船外実験プラットフォームと船外パレットを運んで「きぼう」
船内実験室の先に取り付けます。飛行期間は約15日間で5回の船外活動を行
う予定です。
発表日:平成20年7月8日 発表:宇宙航空研究開発機構

Space agency leaders to gather in Paris - ESA Portal
" 7 July 2008
ESA PR 31-2008. On 17 July ESA will host an ISS Heads of Agency meeting at which leaders of the space agencies participating in the ISS programme (ESA for Europe, NASA for the US, CSA for Canada, JAXA for Japan, Roscosmos for Russia) will take stock of the ISS status and decide on future activities."
http://www.esa.int/esaCP/SEMW8TSHKHF_index_0.html



07/09まで 洞爺湖サミット
http://www.mofa.go.jp/mofaj/gaiko/summit/toyako08/index.html

世界の石油供給、5大「急所」――「攻撃されれば国際経済が危機に」 | WIRED
"『New Scientist』誌はこのような警告を発している。
同誌は6月28日号で、世界の石油供給網の脆弱さを分析し、その上で、多くの国が石油に依存しているが、その石油は輸送と処理の数少ない拠点に依存している、という恐ろしい実態を指摘した。
1つの供給網が崩壊したとの認識が広まるだけで石油価格が高騰し、破滅的な結果を招く恐れがあるということだ。
石油供給網の5つの要所を紹介する。いずれも、事故または故意の攻撃によって深刻な妨害を受けた場合、世界の供給システムの秩序が崩壊することになる。"
http://wiredvision.jp/news/200807/2008070823.html
Oil: The final warning - earth - New Scientist Environment
http://environment.newscientist.com/channel/earth/mg19826621.500-oil-the-final-warning.html


"China's Hu proposes priorities for further cooperation among five major developing countries" English_Xinhua
http://news.xinhuanet.com/english/2008-07/08/content_8512144.htm





26世紀前の皆既日食タレスの予測が的中、戦争も止める | WIRED
"紀元前585年:日食が、小アジアの戦を突如中断させた。交戦中の軍は武器を捨て、停戦を宣言した――後世の歴史天文学は、この出来事が起こったと思われる日にちを割り出している。正確さには議論の余地があるが、この日付は、古代史におけるいくつかの出来事の月日を特定するための基準点となった"
http://wiredvision.jp/news/200807/2008070821.html



マイクロ波で脳内に音を発生させる兵器『MEDUSA』:「サブリミナルメッセージも」 | WIRED VISION
"「マイクロ波聴覚効果」(フレイ効果)――マイクロ波を[パルス波形にして人に]照射すると、頭部との相互作用で[頭の中から発せられたような]音が聞こえる現象
鳥はマイクロ波の音に非常に敏感と考えられるため、鳥の群れを風力発電基地から追い払う――"
http://wiredvision.jp/news/200807/2008070822.html



第24回 イメージが重要 | WIRED VISION
http://wiredvision.jp/blog/masui/200807/200807080800.html








http://www.nasa.gov/pdf/208615main_iss2008.pdf
International Space Station Calendar
http://www.nasa.gov/mission_pages/station/main/index.html


Latest Servicing Mission 4 News
"Space Shuttle Atlantis Undergoing Preparations in the Orbiter Processing Facility"
http://www.nasa.gov/mission_pages/hubble/servicing/SM4/main/index.html
Date: Oct. 8 +
STS-125
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Atlantis will fly seven astronauts into space for the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


Date: Nov. 10 +
STS-126
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the International Space Station.



Date: Nov. 24 *
LRO/LCROSS
Launch Vehicle: United Launch Alliance Atlas V
Launch Site: Cape Canaveral Air Force Station - Launch Complex 41
Description: The mission objectives of the Lunar Crater Observation and Sensing Satellite are to advance the Vision for Space Exploration by confirming the presence or absence of water ice in a permanently shadowed crater at either the Moon's North or South Pole.


STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
2009 Launches
Date: Feb. 12 +
Mission: STS-119
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery launching on assembly flight 15A, will deliver the fourth starboard truss segment to the International Space Station.


Date: May 15 +
STS-127
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the exposed facility of Japan's Kibo laboratory to the International Space Station.


Date: July 30 +
STS-128
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will use a Multi-Purpose Logistics Module to carry experiment and storage racks to the International Space Station.
Establish Six Person Crew Capability


Targeted for Sept. 2009
HTV-1 H-IIB
Japanese H-II Transfer Vehicle
http://www.nasa.gov/mission_pages/station/structure/iss_manifest.html



Date: Oct. 15 +
STS-129
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery will deliver components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm to the International Space Station.


Date: Dec. 10 +
STS-130
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the final connecting node, Node 3, and the Cupola, a robotic control station with six windows around its sides and another in the center that provides a 360-degree view around the International Space Station.


2010 Launches
Date: Feb. 11 +
STS-131
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will carry a Multi-Purpose Logistics Module filled with science racks that will be transferred to laboratories of the International Space Station.

Date: April 8 +
STS-132
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery mission will carry an integrated cargo carrier to deliver maintenance and assembly hardware, including spare parts for space station systems. In addition, the second in a series of new pressurized components for Russia, a Mini Research Module, will be permanently attached to the bottom port of the Zarya module.


Date: May 31 +
STS-133
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver critical spare components including antennas and gas tanks to the International Space Station.




Astronomers Discover the First Ring Around a Moon | DISCOVER Magazine
"the mission scientists are eager to gather more data when Cassini returns to Rhea in 2010.
Related Articles
Mercury's Secrets Revealed
More than 1,000 new images of the planet reveal startling results. April 08, 2008
Mission to the Forgotten Planets
Before the Pluto fiasco, two asteroids were stripped of planet status. March 11, 2008
98. Twin Probes Watch Sun’s Fury in 3-D
January 15, 2008
94. Saturn Seen In New Light
January 15, 2008
67. Mars Rover Delves Int"
http://discovermagazine.com/2008/jul/07-astronomers-discover-first-ring-around-moon-rhea




July 8, Tuesday
2 p.m. - ISS Expedition 17 Mission Status and Spacewalk Preview Briefing - JSC (Public and Media Channels)

July 9, Wednesday
4 - 4:20 p.m. - KSTP-TV, St. Paul, MN Interview with STS-124 Mission Specialist Karen Nyberg - JSC (Public and Media Channels)

フライト名 従来打上げ目標日 新たな打上げ目標日
STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
STS-119/国際宇宙ステーションISS)組立ミッション(15A)
太陽電池パドルを搭載したS6トラス(柱状の構造物)をISSに取り付けます。
飛行期間は約14日間で4回の船外活動を行う予定です。
STS-127/国際宇宙ステーションISS)組立ミッション(2J/A)
「きぼう」の船外実験プラットフォームと船外パレットを運んで「きぼう」
船内実験室の先に取り付けます。飛行期間は約15日間で5回の船外活動を行
う予定です。
発表日:平成20年7月8日 発表:宇宙航空研究開発機構

Space agency leaders to gather in Paris - ESA Portal
" 7 July 2008
ESA PR 31-2008. On 17 July ESA will host an ISS Heads of Agency meeting at which leaders of the space agencies participating in the ISS programme (ESA for Europe, NASA for the US, CSA for Canada, JAXA for Japan, Roscosmos for Russia) will take stock of the ISS status and decide on future activities."
http://www.esa.int/esaCP/SEMW8TSHKHF_index_0.html



07/09まで 洞爺湖サミット
http://www.mofa.go.jp/mofaj/gaiko/summit/toyako08/index.html

世界の石油供給、5大「急所」――「攻撃されれば国際経済が危機に」 | WIRED
"『New Scientist』誌はこのような警告を発している。
同誌は6月28日号で、世界の石油供給網の脆弱さを分析し、その上で、多くの国が石油に依存しているが、その石油は輸送と処理の数少ない拠点に依存している、という恐ろしい実態を指摘した。
1つの供給網が崩壊したとの認識が広まるだけで石油価格が高騰し、破滅的な結果を招く恐れがあるということだ。
石油供給網の5つの要所を紹介する。いずれも、事故または故意の攻撃によって深刻な妨害を受けた場合、世界の供給システムの秩序が崩壊することになる。"
http://wiredvision.jp/news/200807/2008070823.html
Oil: The final warning - earth - New Scientist Environment
http://environment.newscientist.com/channel/earth/mg19826621.500-oil-the-final-warning.html


"China's Hu proposes priorities for further cooperation among five major developing countries" English_Xinhua
http://news.xinhuanet.com/english/2008-07/08/content_8512144.htm





26世紀前の皆既日食タレスの予測が的中、戦争も止める | WIRED
"紀元前585年:日食が、小アジアの戦を突如中断させた。交戦中の軍は武器を捨て、停戦を宣言した――後世の歴史天文学は、この出来事が起こったと思われる日にちを割り出している。正確さには議論の余地があるが、この日付は、古代史におけるいくつかの出来事の月日を特定するための基準点となった"
http://wiredvision.jp/news/200807/2008070821.html



マイクロ波で脳内に音を発生させる兵器『MEDUSA』:「サブリミナルメッセージも」 | WIRED VISION
"「マイクロ波聴覚効果」(フレイ効果)――マイクロ波を[パルス波形にして人に]照射すると、頭部との相互作用で[頭の中から発せられたような]音が聞こえる現象
鳥はマイクロ波の音に非常に敏感と考えられるため、鳥の群れを風力発電基地から追い払う――"
http://wiredvision.jp/news/200807/2008070822.html



第24回 イメージが重要 | WIRED VISION
http://wiredvision.jp/blog/masui/200807/200807080800.html















http://www.nasa.gov/pdf/208615main_iss2008.pdf
International Space Station Calendar
http://www.nasa.gov/mission_pages/station/main/index.html


Latest Servicing Mission 4 News
"Space Shuttle Atlantis Undergoing Preparations in the Orbiter Processing Facility"
http://www.nasa.gov/mission_pages/hubble/servicing/SM4/main/index.html
Date: Oct. 8 +
STS-125
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Atlantis will fly seven astronauts into space for the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


Date: Nov. 10 +
STS-126
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the International Space Station.



Date: Nov. 24 *
LRO/LCROSS
Launch Vehicle: United Launch Alliance Atlas V
Launch Site: Cape Canaveral Air Force Station - Launch Complex 41
Description: The mission objectives of the Lunar Crater Observation and Sensing Satellite are to advance the Vision for Space Exploration by confirming the presence or absence of water ice in a permanently shadowed crater at either the Moon's North or South Pole.


STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
2009 Launches
Date: Feb. 12 +
Mission: STS-119
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery launching on assembly flight 15A, will deliver the fourth starboard truss segment to the International Space Station.


Date: May 15 +
STS-127
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the exposed facility of Japan's Kibo laboratory to the International Space Station.


Date: July 30 +
STS-128
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will use a Multi-Purpose Logistics Module to carry experiment and storage racks to the International Space Station.
Establish Six Person Crew Capability


Targeted for Sept. 2009
HTV-1 H-IIB
Japanese H-II Transfer Vehicle
http://www.nasa.gov/mission_pages/station/structure/iss_manifest.html



Date: Oct. 15 +
STS-129
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery will deliver components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm to the International Space Station.


Date: Dec. 10 +
STS-130
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the final connecting node, Node 3, and the Cupola, a robotic control station with six windows around its sides and another in the center that provides a 360-degree view around the International Space Station.


2010 Launches
Date: Feb. 11 +
STS-131
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will carry a Multi-Purpose Logistics Module filled with science racks that will be transferred to laboratories of the International Space Station.

Date: April 8 +
STS-132
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery mission will carry an integrated cargo carrier to deliver maintenance and assembly hardware, including spare parts for space station systems. In addition, the second in a series of new pressurized components for Russia, a Mini Research Module, will be permanently attached to the bottom port of the Zarya module.


Date: May 31 +
STS-133
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver critical spare components including antennas and gas tanks to the International Space Station.




Astronomers Discover the First Ring Around a Moon | DISCOVER Magazine
"the mission scientists are eager to gather more data when Cassini returns to Rhea in 2010.
Related Articles
Mercury's Secrets Revealed
More than 1,000 new images of the planet reveal startling results. April 08, 2008
Mission to the Forgotten Planets
Before the Pluto fiasco, two asteroids were stripped of planet status. March 11, 2008
98. Twin Probes Watch Sun’s Fury in 3-D
January 15, 2008
94. Saturn Seen In New Light
January 15, 2008
67. Mars Rover Delves Int"
http://discovermagazine.com/2008/jul/07-astronomers-discover-first-ring-around-moon-rhea




July 8, Tuesday
2 p.m. - ISS Expedition 17 Mission Status and Spacewalk Preview Briefing - JSC (Public and Media Channels)

July 9, Wednesday
4 - 4:20 p.m. - KSTP-TV, St. Paul, MN Interview with STS-124 Mission Specialist Karen Nyberg - JSC (Public and Media Channels)

フライト名 従来打上げ目標日 新たな打上げ目標日
STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
STS-119/国際宇宙ステーションISS)組立ミッション(15A)
太陽電池パドルを搭載したS6トラス(柱状の構造物)をISSに取り付けます。
飛行期間は約14日間で4回の船外活動を行う予定です。
STS-127/国際宇宙ステーションISS)組立ミッション(2J/A)
「きぼう」の船外実験プラットフォームと船外パレットを運んで「きぼう」
船内実験室の先に取り付けます。飛行期間は約15日間で5回の船外活動を行
う予定です。
発表日:平成20年7月8日 発表:宇宙航空研究開発機構

Space agency leaders to gather in Paris - ESA Portal
" 7 July 2008
ESA PR 31-2008. On 17 July ESA will host an ISS Heads of Agency meeting at which leaders of the space agencies participating in the ISS programme (ESA for Europe, NASA for the US, CSA for Canada, JAXA for Japan, Roscosmos for Russia) will take stock of the ISS status and decide on future activities."
http://www.esa.int/esaCP/SEMW8TSHKHF_index_0.html



07/09まで 洞爺湖サミット
http://www.mofa.go.jp/mofaj/gaiko/summit/toyako08/index.html

世界の石油供給、5大「急所」――「攻撃されれば国際経済が危機に」 | WIRED
"『New Scientist』誌はこのような警告を発している。
同誌は6月28日号で、世界の石油供給網の脆弱さを分析し、その上で、多くの国が石油に依存しているが、その石油は輸送と処理の数少ない拠点に依存している、という恐ろしい実態を指摘した。
1つの供給網が崩壊したとの認識が広まるだけで石油価格が高騰し、破滅的な結果を招く恐れがあるということだ。
石油供給網の5つの要所を紹介する。いずれも、事故または故意の攻撃によって深刻な妨害を受けた場合、世界の供給システムの秩序が崩壊することになる。"
http://wiredvision.jp/news/200807/2008070823.html
Oil: The final warning - earth - New Scientist Environment
http://environment.newscientist.com/channel/earth/mg19826621.500-oil-the-final-warning.html


"China's Hu proposes priorities for further cooperation among five major developing countries" English_Xinhua
http://news.xinhuanet.com/english/2008-07/08/content_8512144.htm





26世紀前の皆既日食タレスの予測が的中、戦争も止める | WIRED
"紀元前585年:日食が、小アジアの戦を突如中断させた。交戦中の軍は武器を捨て、停戦を宣言した――後世の歴史天文学は、この出来事が起こったと思われる日にちを割り出している。正確さには議論の余地があるが、この日付は、古代史におけるいくつかの出来事の月日を特定するための基準点となった"
http://wiredvision.jp/news/200807/2008070821.html



マイクロ波で脳内に音を発生させる兵器『MEDUSA』:「サブリミナルメッセージも」 | WIRED VISION
"「マイクロ波聴覚効果」(フレイ効果)――マイクロ波を[パルス波形にして人に]照射すると、頭部との相互作用で[頭の中から発せられたような]音が聞こえる現象
鳥はマイクロ波の音に非常に敏感と考えられるため、鳥の群れを風力発電基地から追い払う――"
http://wiredvision.jp/news/200807/2008070822.html



第24回 イメージが重要 | WIRED VISION
http://wiredvision.jp/blog/masui/200807/200807080800.html








http://www.nasa.gov/pdf/208615main_iss2008.pdf
International Space Station Calendar
http://www.nasa.gov/mission_pages/station/main/index.html


Latest Servicing Mission 4 News
"Space Shuttle Atlantis Undergoing Preparations in the Orbiter Processing Facility"
http://www.nasa.gov/mission_pages/hubble/servicing/SM4/main/index.html
Date: Oct. 8 +
STS-125
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Atlantis will fly seven astronauts into space for the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


Date: Nov. 10 +
STS-126
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the International Space Station.



Date: Nov. 24 *
LRO/LCROSS
Launch Vehicle: United Launch Alliance Atlas V
Launch Site: Cape Canaveral Air Force Station - Launch Complex 41
Description: The mission objectives of the Lunar Crater Observation and Sensing Satellite are to advance the Vision for Space Exploration by confirming the presence or absence of water ice in a permanently shadowed crater at either the Moon's North or South Pole.


STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
2009 Launches
Date: Feb. 12 +
Mission: STS-119
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery launching on assembly flight 15A, will deliver the fourth starboard truss segment to the International Space Station.


Date: May 15 +
STS-127
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the exposed facility of Japan's Kibo laboratory to the International Space Station.


Date: July 30 +
STS-128
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will use a Multi-Purpose Logistics Module to carry experiment and storage racks to the International Space Station.
Establish Six Person Crew Capability


Targeted for Sept. 2009
HTV-1 H-IIB
Japanese H-II Transfer Vehicle
http://www.nasa.gov/mission_pages/station/structure/iss_manifest.html



Date: Oct. 15 +
STS-129
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery will deliver components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm to the International Space Station.


Date: Dec. 10 +
STS-130
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the final connecting node, Node 3, and the Cupola, a robotic control station with six windows around its sides and another in the center that provides a 360-degree view around the International Space Station.


2010 Launches
Date: Feb. 11 +
STS-131
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will carry a Multi-Purpose Logistics Module filled with science racks that will be transferred to laboratories of the International Space Station.

Date: April 8 +
STS-132
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery mission will carry an integrated cargo carrier to deliver maintenance and assembly hardware, including spare parts for space station systems. In addition, the second in a series of new pressurized components for Russia, a Mini Research Module, will be permanently attached to the bottom port of the Zarya module.


Date: May 31 +
STS-133
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver critical spare components including antennas and gas tanks to the International Space Station.




Astronomers Discover the First Ring Around a Moon | DISCOVER Magazine
"the mission scientists are eager to gather more data when Cassini returns to Rhea in 2010.
Related Articles
Mercury's Secrets Revealed
More than 1,000 new images of the planet reveal startling results. April 08, 2008
Mission to the Forgotten Planets
Before the Pluto fiasco, two asteroids were stripped of planet status. March 11, 2008
98. Twin Probes Watch Sun’s Fury in 3-D
January 15, 2008
94. Saturn Seen In New Light
January 15, 2008
67. Mars Rover Delves Int"
http://discovermagazine.com/2008/jul/07-astronomers-discover-first-ring-around-moon-rhea




July 8, Tuesday
2 p.m. - ISS Expedition 17 Mission Status and Spacewalk Preview Briefing - JSC (Public and Media Channels)

July 9, Wednesday
4 - 4:20 p.m. - KSTP-TV, St. Paul, MN Interview with STS-124 Mission Specialist Karen Nyberg - JSC (Public and Media Channels)

フライト名 従来打上げ目標日 新たな打上げ目標日
STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
STS-119/国際宇宙ステーションISS)組立ミッション(15A)
太陽電池パドルを搭載したS6トラス(柱状の構造物)をISSに取り付けます。
飛行期間は約14日間で4回の船外活動を行う予定です。
STS-127/国際宇宙ステーションISS)組立ミッション(2J/A)
「きぼう」の船外実験プラットフォームと船外パレットを運んで「きぼう」
船内実験室の先に取り付けます。飛行期間は約15日間で5回の船外活動を行
う予定です。
発表日:平成20年7月8日 発表:宇宙航空研究開発機構

Space agency leaders to gather in Paris - ESA Portal
" 7 July 2008
ESA PR 31-2008. On 17 July ESA will host an ISS Heads of Agency meeting at which leaders of the space agencies participating in the ISS programme (ESA for Europe, NASA for the US, CSA for Canada, JAXA for Japan, Roscosmos for Russia) will take stock of the ISS status and decide on future activities."
http://www.esa.int/esaCP/SEMW8TSHKHF_index_0.html



07/09まで 洞爺湖サミット
http://www.mofa.go.jp/mofaj/gaiko/summit/toyako08/index.html

世界の石油供給、5大「急所」――「攻撃されれば国際経済が危機に」 | WIRED
"『New Scientist』誌はこのような警告を発している。
同誌は6月28日号で、世界の石油供給網の脆弱さを分析し、その上で、多くの国が石油に依存しているが、その石油は輸送と処理の数少ない拠点に依存している、という恐ろしい実態を指摘した。
1つの供給網が崩壊したとの認識が広まるだけで石油価格が高騰し、破滅的な結果を招く恐れがあるということだ。
石油供給網の5つの要所を紹介する。いずれも、事故または故意の攻撃によって深刻な妨害を受けた場合、世界の供給システムの秩序が崩壊することになる。"
http://wiredvision.jp/news/200807/2008070823.html
Oil: The final warning - earth - New Scientist Environment
http://environment.newscientist.com/channel/earth/mg19826621.500-oil-the-final-warning.html


"China's Hu proposes priorities for further cooperation among five major developing countries" English_Xinhua
http://news.xinhuanet.com/english/2008-07/08/content_8512144.htm





26世紀前の皆既日食タレスの予測が的中、戦争も止める | WIRED
"紀元前585年:日食が、小アジアの戦を突如中断させた。交戦中の軍は武器を捨て、停戦を宣言した――後世の歴史天文学は、この出来事が起こったと思われる日にちを割り出している。正確さには議論の余地があるが、この日付は、古代史におけるいくつかの出来事の月日を特定するための基準点となった"
http://wiredvision.jp/news/200807/2008070821.html



マイクロ波で脳内に音を発生させる兵器『MEDUSA』:「サブリミナルメッセージも」 | WIRED VISION
"「マイクロ波聴覚効果」(フレイ効果)――マイクロ波を[パルス波形にして人に]照射すると、頭部との相互作用で[頭の中から発せられたような]音が聞こえる現象
鳥はマイクロ波の音に非常に敏感と考えられるため、鳥の群れを風力発電基地から追い払う――"
http://wiredvision.jp/news/200807/2008070822.html



第24回 イメージが重要 | WIRED VISION
http://wiredvision.jp/blog/masui/200807/200807080800.html








http://www.nasa.gov/pdf/208615main_iss2008.pdf
International Space Station Calendar
http://www.nasa.gov/mission_pages/station/main/index.html


Latest Servicing Mission 4 News
"Space Shuttle Atlantis Undergoing Preparations in the Orbiter Processing Facility"
http://www.nasa.gov/mission_pages/hubble/servicing/SM4/main/index.html
Date: Oct. 8 +
STS-125
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Atlantis will fly seven astronauts into space for the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


Date: Nov. 10 +
STS-126
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the International Space Station.



Date: Nov. 24 *
LRO/LCROSS
Launch Vehicle: United Launch Alliance Atlas V
Launch Site: Cape Canaveral Air Force Station - Launch Complex 41
Description: The mission objectives of the Lunar Crater Observation and Sensing Satellite are to advance the Vision for Space Exploration by confirming the presence or absence of water ice in a permanently shadowed crater at either the Moon's North or South Pole.


STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
2009 Launches
Date: Feb. 12 +
Mission: STS-119
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery launching on assembly flight 15A, will deliver the fourth starboard truss segment to the International Space Station.


Date: May 15 +
STS-127
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the exposed facility of Japan's Kibo laboratory to the International Space Station.


Date: July 30 +
STS-128
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will use a Multi-Purpose Logistics Module to carry experiment and storage racks to the International Space Station.
Establish Six Person Crew Capability


Targeted for Sept. 2009
HTV-1 H-IIB
Japanese H-II Transfer Vehicle
http://www.nasa.gov/mission_pages/station/structure/iss_manifest.html



Date: Oct. 15 +
STS-129
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery will deliver components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm to the International Space Station.


Date: Dec. 10 +
STS-130
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the final connecting node, Node 3, and the Cupola, a robotic control station with six windows around its sides and another in the center that provides a 360-degree view around the International Space Station.


2010 Launches
Date: Feb. 11 +
STS-131
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will carry a Multi-Purpose Logistics Module filled with science racks that will be transferred to laboratories of the International Space Station.

Date: April 8 +
STS-132
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery mission will carry an integrated cargo carrier to deliver maintenance and assembly hardware, including spare parts for space station systems. In addition, the second in a series of new pressurized components for Russia, a Mini Research Module, will be permanently attached to the bottom port of the Zarya module.


Date: May 31 +
STS-133
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver critical spare components including antennas and gas tanks to the International Space Station.




Astronomers Discover the First Ring Around a Moon | DISCOVER Magazine
"the mission scientists are eager to gather more data when Cassini returns to Rhea in 2010.
Related Articles
Mercury's Secrets Revealed
More than 1,000 new images of the planet reveal startling results. April 08, 2008
Mission to the Forgotten Planets
Before the Pluto fiasco, two asteroids were stripped of planet status. March 11, 2008
98. Twin Probes Watch Sun’s Fury in 3-D
January 15, 2008
94. Saturn Seen In New Light
January 15, 2008
67. Mars Rover Delves Int"
http://discovermagazine.com/2008/jul/07-astronomers-discover-first-ring-around-moon-rhea




July 8, Tuesday
2 p.m. - ISS Expedition 17 Mission Status and Spacewalk Preview Briefing - JSC (Public and Media Channels)

July 9, Wednesday
4 - 4:20 p.m. - KSTP-TV, St. Paul, MN Interview with STS-124 Mission Specialist Karen Nyberg - JSC (Public and Media Channels)

フライト名 従来打上げ目標日 新たな打上げ目標日
STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
STS-119/国際宇宙ステーションISS)組立ミッション(15A)
太陽電池パドルを搭載したS6トラス(柱状の構造物)をISSに取り付けます。
飛行期間は約14日間で4回の船外活動を行う予定です。
STS-127/国際宇宙ステーションISS)組立ミッション(2J/A)
「きぼう」の船外実験プラットフォームと船外パレットを運んで「きぼう」
船内実験室の先に取り付けます。飛行期間は約15日間で5回の船外活動を行
う予定です。
発表日:平成20年7月8日 発表:宇宙航空研究開発機構

Space agency leaders to gather in Paris - ESA Portal
" 7 July 2008
ESA PR 31-2008. On 17 July ESA will host an ISS Heads of Agency meeting at which leaders of the space agencies participating in the ISS programme (ESA for Europe, NASA for the US, CSA for Canada, JAXA for Japan, Roscosmos for Russia) will take stock of the ISS status and decide on future activities."
http://www.esa.int/esaCP/SEMW8TSHKHF_index_0.html



07/09まで 洞爺湖サミット
http://www.mofa.go.jp/mofaj/gaiko/summit/toyako08/index.html

世界の石油供給、5大「急所」――「攻撃されれば国際経済が危機に」 | WIRED
"『New Scientist』誌はこのような警告を発している。
同誌は6月28日号で、世界の石油供給網の脆弱さを分析し、その上で、多くの国が石油に依存しているが、その石油は輸送と処理の数少ない拠点に依存している、という恐ろしい実態を指摘した。
1つの供給網が崩壊したとの認識が広まるだけで石油価格が高騰し、破滅的な結果を招く恐れがあるということだ。
石油供給網の5つの要所を紹介する。いずれも、事故または故意の攻撃によって深刻な妨害を受けた場合、世界の供給システムの秩序が崩壊することになる。"
http://wiredvision.jp/news/200807/2008070823.html
Oil: The final warning - earth - New Scientist Environment
http://environment.newscientist.com/channel/earth/mg19826621.500-oil-the-final-warning.html


"China's Hu proposes priorities for further cooperation among five major developing countries" English_Xinhua
http://news.xinhuanet.com/english/2008-07/08/content_8512144.htm





26世紀前の皆既日食タレスの予測が的中、戦争も止める | WIRED
"紀元前585年:日食が、小アジアの戦を突如中断させた。交戦中の軍は武器を捨て、停戦を宣言した――後世の歴史天文学は、この出来事が起こったと思われる日にちを割り出している。正確さには議論の余地があるが、この日付は、古代史におけるいくつかの出来事の月日を特定するための基準点となった"
http://wiredvision.jp/news/200807/2008070821.html



マイクロ波で脳内に音を発生させる兵器『MEDUSA』:「サブリミナルメッセージも」 | WIRED VISION
"「マイクロ波聴覚効果」(フレイ効果)――マイクロ波を[パルス波形にして人に]照射すると、頭部との相互作用で[頭の中から発せられたような]音が聞こえる現象
鳥はマイクロ波の音に非常に敏感と考えられるため、鳥の群れを風力発電基地から追い払う――"
http://wiredvision.jp/news/200807/2008070822.html



第24回 イメージが重要 | WIRED VISION
http://wiredvision.jp/blog/masui/200807/200807080800.html













http://www.nasa.gov/pdf/208615main_iss2008.pdf
International Space Station Calendar
http://www.nasa.gov/mission_pages/station/main/index.html


Latest Servicing Mission 4 News
"Space Shuttle Atlantis Undergoing Preparations in the Orbiter Processing Facility"
http://www.nasa.gov/mission_pages/hubble/servicing/SM4/main/index.html
Date: Oct. 8 +
STS-125
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Atlantis will fly seven astronauts into space for the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


Date: Nov. 10 +
STS-126
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the International Space Station.



Date: Nov. 24 *
LRO/LCROSS
Launch Vehicle: United Launch Alliance Atlas V
Launch Site: Cape Canaveral Air Force Station - Launch Complex 41
Description: The mission objectives of the Lunar Crater Observation and Sensing Satellite are to advance the Vision for Space Exploration by confirming the presence or absence of water ice in a permanently shadowed crater at either the Moon's North or South Pole.


STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
2009 Launches
Date: Feb. 12 +
Mission: STS-119
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery launching on assembly flight 15A, will deliver the fourth starboard truss segment to the International Space Station.


Date: May 15 +
STS-127
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the exposed facility of Japan's Kibo laboratory to the International Space Station.


Date: July 30 +
STS-128
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will use a Multi-Purpose Logistics Module to carry experiment and storage racks to the International Space Station.
Establish Six Person Crew Capability


Targeted for Sept. 2009
HTV-1 H-IIB
Japanese H-II Transfer Vehicle
http://www.nasa.gov/mission_pages/station/structure/iss_manifest.html



Date: Oct. 15 +
STS-129
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery will deliver components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm to the International Space Station.


Date: Dec. 10 +
STS-130
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the final connecting node, Node 3, and the Cupola, a robotic control station with six windows around its sides and another in the center that provides a 360-degree view around the International Space Station.


2010 Launches
Date: Feb. 11 +
STS-131
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will carry a Multi-Purpose Logistics Module filled with science racks that will be transferred to laboratories of the International Space Station.

Date: April 8 +
STS-132
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery mission will carry an integrated cargo carrier to deliver maintenance and assembly hardware, including spare parts for space station systems. In addition, the second in a series of new pressurized components for Russia, a Mini Research Module, will be permanently attached to the bottom port of the Zarya module.


Date: May 31 +
STS-133
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver critical spare components including antennas and gas tanks to the International Space Station.




Astronomers Discover the First Ring Around a Moon | DISCOVER Magazine
"the mission scientists are eager to gather more data when Cassini returns to Rhea in 2010.
Related Articles
Mercury's Secrets Revealed
More than 1,000 new images of the planet reveal startling results. April 08, 2008
Mission to the Forgotten Planets
Before the Pluto fiasco, two asteroids were stripped of planet status. March 11, 2008
98. Twin Probes Watch Sun’s Fury in 3-D
January 15, 2008
94. Saturn Seen In New Light
January 15, 2008
67. Mars Rover Delves Int"
http://discovermagazine.com/2008/jul/07-astronomers-discover-first-ring-around-moon-rhea




July 8, Tuesday
2 p.m. - ISS Expedition 17 Mission Status and Spacewalk Preview Briefing - JSC (Public and Media Channels)

July 9, Wednesday
4 - 4:20 p.m. - KSTP-TV, St. Paul, MN Interview with STS-124 Mission Specialist Karen Nyberg - JSC (Public and Media Channels)

フライト名 従来打上げ目標日 新たな打上げ目標日
STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
STS-119/国際宇宙ステーションISS)組立ミッション(15A)
太陽電池パドルを搭載したS6トラス(柱状の構造物)をISSに取り付けます。
飛行期間は約14日間で4回の船外活動を行う予定です。
STS-127/国際宇宙ステーションISS)組立ミッション(2J/A)
「きぼう」の船外実験プラットフォームと船外パレットを運んで「きぼう」
船内実験室の先に取り付けます。飛行期間は約15日間で5回の船外活動を行
う予定です。
発表日:平成20年7月8日 発表:宇宙航空研究開発機構

Space agency leaders to gather in Paris - ESA Portal
" 7 July 2008
ESA PR 31-2008. On 17 July ESA will host an ISS Heads of Agency meeting at which leaders of the space agencies participating in the ISS programme (ESA for Europe, NASA for the US, CSA for Canada, JAXA for Japan, Roscosmos for Russia) will take stock of the ISS status and decide on future activities."
http://www.esa.int/esaCP/SEMW8TSHKHF_index_0.html



07/09まで 洞爺湖サミット
http://www.mofa.go.jp/mofaj/gaiko/summit/toyako08/index.html

世界の石油供給、5大「急所」――「攻撃されれば国際経済が危機に」 | WIRED
"『New Scientist』誌はこのような警告を発している。
同誌は6月28日号で、世界の石油供給網の脆弱さを分析し、その上で、多くの国が石油に依存しているが、その石油は輸送と処理の数少ない拠点に依存している、という恐ろしい実態を指摘した。
1つの供給網が崩壊したとの認識が広まるだけで石油価格が高騰し、破滅的な結果を招く恐れがあるということだ。
石油供給網の5つの要所を紹介する。いずれも、事故または故意の攻撃によって深刻な妨害を受けた場合、世界の供給システムの秩序が崩壊することになる。"
http://wiredvision.jp/news/200807/2008070823.html
Oil: The final warning - earth - New Scientist Environment
http://environment.newscientist.com/channel/earth/mg19826621.500-oil-the-final-warning.html


"China's Hu proposes priorities for further cooperation among five major developing countries" English_Xinhua
http://news.xinhuanet.com/english/2008-07/08/content_8512144.htm





26世紀前の皆既日食タレスの予測が的中、戦争も止める | WIRED
"紀元前585年:日食が、小アジアの戦を突如中断させた。交戦中の軍は武器を捨て、停戦を宣言した――後世の歴史天文学は、この出来事が起こったと思われる日にちを割り出している。正確さには議論の余地があるが、この日付は、古代史におけるいくつかの出来事の月日を特定するための基準点となった"
http://wiredvision.jp/news/200807/2008070821.html



マイクロ波で脳内に音を発生させる兵器『MEDUSA』:「サブリミナルメッセージも」 | WIRED VISION
"「マイクロ波聴覚効果」(フレイ効果)――マイクロ波を[パルス波形にして人に]照射すると、頭部との相互作用で[頭の中から発せられたような]音が聞こえる現象
鳥はマイクロ波の音に非常に敏感と考えられるため、鳥の群れを風力発電基地から追い払う――"
http://wiredvision.jp/news/200807/2008070822.html



第24回 イメージが重要 | WIRED VISION
http://wiredvision.jp/blog/masui/200807/200807080800.html








http://www.nasa.gov/pdf/208615main_iss2008.pdf
International Space Station Calendar
http://www.nasa.gov/mission_pages/station/main/index.html


Latest Servicing Mission 4 News
"Space Shuttle Atlantis Undergoing Preparations in the Orbiter Processing Facility"
http://www.nasa.gov/mission_pages/hubble/servicing/SM4/main/index.html
Date: Oct. 8 +
STS-125
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Atlantis will fly seven astronauts into space for the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


Date: Nov. 10 +
STS-126
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the International Space Station.



Date: Nov. 24 *
LRO/LCROSS
Launch Vehicle: United Launch Alliance Atlas V
Launch Site: Cape Canaveral Air Force Station - Launch Complex 41
Description: The mission objectives of the Lunar Crater Observation and Sensing Satellite are to advance the Vision for Space Exploration by confirming the presence or absence of water ice in a permanently shadowed crater at either the Moon's North or South Pole.


STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
2009 Launches
Date: Feb. 12 +
Mission: STS-119
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery launching on assembly flight 15A, will deliver the fourth starboard truss segment to the International Space Station.


Date: May 15 +
STS-127
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the exposed facility of Japan's Kibo laboratory to the International Space Station.


Date: July 30 +
STS-128
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will use a Multi-Purpose Logistics Module to carry experiment and storage racks to the International Space Station.
Establish Six Person Crew Capability


Targeted for Sept. 2009
HTV-1 H-IIB
Japanese H-II Transfer Vehicle
http://www.nasa.gov/mission_pages/station/structure/iss_manifest.html



Date: Oct. 15 +
STS-129
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery will deliver components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm to the International Space Station.


Date: Dec. 10 +
STS-130
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver the final connecting node, Node 3, and the Cupola, a robotic control station with six windows around its sides and another in the center that provides a 360-degree view around the International Space Station.


2010 Launches
Date: Feb. 11 +
STS-131
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Atlantis will carry a Multi-Purpose Logistics Module filled with science racks that will be transferred to laboratories of the International Space Station.

Date: April 8 +
STS-132
Launch Vehicle: Space Shuttle Discovery
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Discovery mission will carry an integrated cargo carrier to deliver maintenance and assembly hardware, including spare parts for space station systems. In addition, the second in a series of new pressurized components for Russia, a Mini Research Module, will be permanently attached to the bottom port of the Zarya module.


Date: May 31 +
STS-133
Launch Vehicle: Space Shuttle Endeavour
Launch Site: Kennedy Space Center - Launch Pad 39A
Description: Space shuttle Endeavour will deliver critical spare components including antennas and gas tanks to the International Space Station.




Astronomers Discover the First Ring Around a Moon | DISCOVER Magazine
"the mission scientists are eager to gather more data when Cassini returns to Rhea in 2010.
Related Articles
Mercury's Secrets Revealed
More than 1,000 new images of the planet reveal startling results. April 08, 2008
Mission to the Forgotten Planets
Before the Pluto fiasco, two asteroids were stripped of planet status. March 11, 2008
98. Twin Probes Watch Sun’s Fury in 3-D
January 15, 2008
94. Saturn Seen In New Light
January 15, 2008
67. Mars Rover Delves Int"
http://discovermagazine.com/2008/jul/07-astronomers-discover-first-ring-around-moon-rhea




July 8, Tuesday
2 p.m. - ISS Expedition 17 Mission Status and Spacewalk Preview Briefing - JSC (Public and Media Channels)

July 9, Wednesday
4 - 4:20 p.m. - KSTP-TV, St. Paul, MN Interview with STS-124 Mission Specialist Karen Nyberg - JSC (Public and Media Channels)

フライト名 従来打上げ目標日 新たな打上げ目標日
STS-119(15A) 2008年12月4日 →   2009年2月12日
STS-127(2J/A)  2008年度見込み → 2009年5月15日
STS-119/国際宇宙ステーションISS)組立ミッション(15A)
太陽電池パドルを搭載したS6トラス(柱状の構造物)をISSに取り付けます。
飛行期間は約14日間で4回の船外活動を行う予定です。
STS-127/国際宇宙ステーションISS)組立ミッション(2J/A)
「きぼう」の船外実験プラットフォームと船外パレットを運んで「きぼう」
船内実験室の先に取り付けます。飛行期間は約15日間で5回の船外活動を行
う予定です。
発表日:平成20年7月8日 発表:宇宙航空研究開発機構

Space agency leaders to gather in Paris - ESA Portal
" 7 July 2008
ESA PR 31-2008. On 17 July ESA will host an ISS Heads of Agency meeting at which leaders of the space agencies participating in the ISS programme (ESA for Europe, NASA for the US, CSA for Canada, JAXA for Japan, Roscosmos for Russia) will take stock of the ISS status and decide on future activities."
http://www.esa.int/esaCP/SEMW8TSHKHF_index_0.html



07/09まで 洞爺湖サミット
http://www.mofa.go.jp/mofaj/gaiko/summit/toyako08/index.html

世界の石油供給、5大「急所」――「攻撃されれば国際経済が危機に」 | WIRED
"『New Scientist』誌はこのような警告を発している。
同誌は6月28日号で、世界の石油供給網の脆弱さを分析し、その上で、多くの国が石油に依存しているが、その石油は輸送と処理の数少ない拠点に依存している、という恐ろしい実態を指摘した。
1つの供給網が崩壊したとの認識が広まるだけで石油価格が高騰し、破滅的な結果を招く恐れがあるということだ。
石油供給網の5つの要所を紹介する。いずれも、事故または故意の攻撃によって深刻な妨害を受けた場合、世界の供給システムの秩序が崩壊することになる。"
http://wiredvision.jp/news/200807/2008070823.html
Oil: The final warning - earth - New Scientist Environment
http://environment.newscientist.com/channel/earth/mg19826621.500-oil-the-final-warning.html


"China's Hu proposes priorities for further cooperation among five major developing countries" English_Xi