nexus6

nexus6

Atlantis Scheduled for Feb. 07 Launch


Progress 28 (P28) docked ISS

"The Progress M-63 space freighter:
The automatic docking with the orbital station has been set for 2:38 p.m. GMT on February 7." - RIA Novosti - Russia
http://en.rian.ru/russia/20080205/98376575.html





VOA News
"NASA: Bad Weather Could Delay Shuttle Launch"
http://voanews.com/english/2008-02-05-voa40.cfm


STS-122 : Shuttle Atlantis
Launch Time: 2:45 p.m.
EST日本時間 2月8日 4時45分

STS-122 Interactive timeline
STS-122: Interactive Mission Timeline
http://www.nasa.gov/externalflash/STS122_flash/
Schedule 12days
国際宇宙ステーションの組立フライト 1E(STS-122)JAXA
http://iss.jaxa.jp/iss/1e/index.html


Feb. 7, Thursday
5:15 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)



Date: Feb. 7
Mission: STS-122
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Launch Time: 2:45 p.m. EST
Description: STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.
━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛


Feb. 7, Thursday
5:30 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)

March 4, Tuesday
9 a.m. - 3 p.m. - STS-123 Preflight Briefings - JSC (Public and Media Channels)

April 3, Thursday
9 a.m. - 3 p.m. - STS-124 Preflight Briefings - JSC


━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛
次のSTS-123「エンデバー
3月11日午前2時31分
(日本時間同日午後4時31分)に打ち上げ予定
Mission: STS-123
Launch Vehicle: Space Shuttle Endeavour
Space Shuttle Endeavour : Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.
STS-124はApril 24
Space Shuttle Discovery: Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM-RMS) to the International Space Station.


STS-125 Aug. 7
Space Shuttle Atlantis
the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


STS-126 Sept. 18
Space Shuttle Endeavour
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the ISS.



LIFTOFF of Atlantis 2006年09月29日 wakeup music "moon river"




━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛



FLIGHT DAY 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
•Shuttle Robotic Arm Activation and Checkout
•Umbilical Well and Handheld External Tank Video and Stills Downlink






FLIGHT DAY 2
•Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System (OBSS)
•Extravehicular Mobility Unit Checkout
•Centerline Camera Installation
•Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout

COLUMBUS CONTROL CENTER, OBERPFAFFENHOFEN, GERMANY



FLIGHT DAY 3
Rendezvous with the International Space Station
Rendezvous Pitch Maneuver Photography by the Expedition 16 Crew •Docking to Harmony (Node 2)/Pressurized Mating Adapter‐2 •Hatch Opening and Welcoming •OBSS Unberth by Canadarm2 •Extravehicular Activity (EVA) 1 Procedure Review
•EVA‐1 Campout by Walheim and Schlegel




FLIGHT DAY 4
•Soyuz Seat Liner Swap and Expedition Crew Exchange by Tani and Eyharts
•EVA‐1 by Walheim and Schlegel (Columbus Grapple Fixture Installation, P1 Truss Nitrogen Tank Assembly Preparation) •Temporary Shuttle Ku‐band Antenna Stowage for Columbus Module Unberth
•Columbus Module Grapple, Unberth and Installation on Starboard Side of Harmony


FLIGHT DAY 5
•Atlantis Thermal Protection System Focused Inspection with OBSS (if required)
•Shuttle Ku‐band Antenna Redeployment
•Columbus Module Ingress Preparations
•Columbus Module Ingress
•EVA‐2 Procedure Review •EVA‐2 Campout by Walheim and Schlegel




FLIGHT DAY 6
•EVA‐2 by Walheim and Schlegel (P1 Truss Nitrogen Tank Assembly Installation, Stowage of Old N2 Tank Assembly)
•Columbus Module Outfitting




FLIGHT DAY 7
• Columbus Module Racks and Systems Outfitting
• Off Duty Periods
• EVA‐3 Procedure Review •EVA‐3 Campout by Walheim and Love




FLIGHT DAY 8
•EVA‐3 by Walheim and Love (SOLAR and EuTEF Facility Installation, Failed Control Moment Gyroscope Transfer to Atlantis・Payload Bay)




FLIGHT DAY 9
•Shuttle and Station Transfers
•Joint Crew News Conference
ISS Reboost
•Columbus Module Outfitting
•Farewells and Hatch Closure




FLIGHT DAY 10
•Undocking from Harmony Node 2/Pressurized Mating Adapter‐2 and Flyaround
•Final Separation from the International Space Station •OBSS Unberth and Late Inspection of Atlantis's Thermal Protection System
•OBSS Final Berthing




FLIGHT DAY 11
•Cabin Stow •Flight Control System Checkout
•Reaction Control System Hot‐Fire Test
•Crew Deorbit Briefing •Launch and Entry Suit Checkout •Recumbent Seat Set Up for Tani
•Ku‐Band Antenna Stow





FLIGHT DAY 12
•Deorbit Preparations
•Payload Bay Door Closing
•Deorbit Burn
•Kennedy Space Center Landing



横浜チャイナタウン「2008春節
獅子舞が各店舗を回り、店頭に吊るされた御祝儀(採青)をとり、おめでとうと商売繁栄を祈る春節伝統行事
http://www.chinatown.or.jp/news/shunsetsu08/


"旧暦大みそかの6日夜、「NHK紅白歌合戦」にあたる
中国中央電視台(CCTV)の旧正月年越し番組『春節聯歓晩会』"
 [中国情報局]
http://news.searchina.ne.jp/disp.cgi?y=2008&d=0207&f=entertainment_0207_001.shtml


ブット氏暗殺で容疑者2人逮捕=イスラム武装勢力と関連か
"【ニューデリー7日時事】パキスタン当局は7日、野党指導者ブット元首相暗殺に絡んで男2人を首都イスラマバード近郊のラワルピンディで逮捕
当局は、対アフガニスタン国境の部族地域・南ワジリスタン地区のイスラム武装勢力指導者、バイトゥッラー・メフスード容疑者が事件に関与したとみている。" AFP通信
http://headlines.yahoo.co.jp/hl?a=20080207-00000181-jij-int




Progress 28 (P28) docked ISS

"The Progress M-63 space freighter:
The automatic docking with the orbital station has been set for 2:38 p.m. GMT on February 7." - RIA Novosti - Russia
http://en.rian.ru/russia/20080205/98376575.html





VOA News
"NASA: Bad Weather Could Delay Shuttle Launch"
http://voanews.com/english/2008-02-05-voa40.cfm


STS-122 : Shuttle Atlantis
Launch Time: 2:45 p.m.
EST日本時間 2月8日 4時45分

STS-122 Interactive timeline
STS-122: Interactive Mission Timeline
http://www.nasa.gov/externalflash/STS122_flash/
Schedule 12days
国際宇宙ステーションの組立フライト 1E(STS-122)JAXA
http://iss.jaxa.jp/iss/1e/index.html


Feb. 7, Thursday
5:15 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)



Date: Feb. 7
Mission: STS-122
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Launch Time: 2:45 p.m. EST
Description: STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.
━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛


Feb. 7, Thursday
5:30 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)

March 4, Tuesday
9 a.m. - 3 p.m. - STS-123 Preflight Briefings - JSC (Public and Media Channels)

April 3, Thursday
9 a.m. - 3 p.m. - STS-124 Preflight Briefings - JSC


━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛
次のSTS-123「エンデバー
3月11日午前2時31分
(日本時間同日午後4時31分)に打ち上げ予定
Mission: STS-123
Launch Vehicle: Space Shuttle Endeavour
Space Shuttle Endeavour : Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.
STS-124はApril 24
Space Shuttle Discovery: Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM-RMS) to the International Space Station.


STS-125 Aug. 7
Space Shuttle Atlantis
the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


STS-126 Sept. 18
Space Shuttle Endeavour
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the ISS.



LIFTOFF of Atlantis 2006年09月29日 wakeup music "moon river"




━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛



FLIGHT DAY 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
•Shuttle Robotic Arm Activation and Checkout
•Umbilical Well and Handheld External Tank Video and Stills Downlink






FLIGHT DAY 2
•Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System (OBSS)
•Extravehicular Mobility Unit Checkout
•Centerline Camera Installation
•Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout

COLUMBUS CONTROL CENTER, OBERPFAFFENHOFEN, GERMANY



FLIGHT DAY 3
Rendezvous with the International Space Station
Rendezvous Pitch Maneuver Photography by the Expedition 16 Crew •Docking to Harmony (Node 2)/Pressurized Mating Adapter‐2 •Hatch Opening and Welcoming •OBSS Unberth by Canadarm2 •Extravehicular Activity (EVA) 1 Procedure Review
•EVA‐1 Campout by Walheim and Schlegel




FLIGHT DAY 4
•Soyuz Seat Liner Swap and Expedition Crew Exchange by Tani and Eyharts
•EVA‐1 by Walheim and Schlegel (Columbus Grapple Fixture Installation, P1 Truss Nitrogen Tank Assembly Preparation) •Temporary Shuttle Ku‐band Antenna Stowage for Columbus Module Unberth
•Columbus Module Grapple, Unberth and Installation on Starboard Side of Harmony


FLIGHT DAY 5
•Atlantis Thermal Protection System Focused Inspection with OBSS (if required)
•Shuttle Ku‐band Antenna Redeployment
•Columbus Module Ingress Preparations
•Columbus Module Ingress
•EVA‐2 Procedure Review •EVA‐2 Campout by Walheim and Schlegel




FLIGHT DAY 6
•EVA‐2 by Walheim and Schlegel (P1 Truss Nitrogen Tank Assembly Installation, Stowage of Old N2 Tank Assembly)
•Columbus Module Outfitting




FLIGHT DAY 7
• Columbus Module Racks and Systems Outfitting
• Off Duty Periods
• EVA‐3 Procedure Review •EVA‐3 Campout by Walheim and Love




FLIGHT DAY 8
•EVA‐3 by Walheim and Love (SOLAR and EuTEF Facility Installation, Failed Control Moment Gyroscope Transfer to Atlantis・Payload Bay)




FLIGHT DAY 9
•Shuttle and Station Transfers
•Joint Crew News Conference
ISS Reboost
•Columbus Module Outfitting
•Farewells and Hatch Closure




FLIGHT DAY 10
•Undocking from Harmony Node 2/Pressurized Mating Adapter‐2 and Flyaround
•Final Separation from the International Space Station •OBSS Unberth and Late Inspection of Atlantis's Thermal Protection System
•OBSS Final Berthing




FLIGHT DAY 11
•Cabin Stow •Flight Control System Checkout
•Reaction Control System Hot‐Fire Test
•Crew Deorbit Briefing •Launch and Entry Suit Checkout •Recumbent Seat Set Up for Tani
•Ku‐Band Antenna Stow





FLIGHT DAY 12
•Deorbit Preparations
•Payload Bay Door Closing
•Deorbit Burn
•Kennedy Space Center Landing



横浜チャイナタウン「2008春節
獅子舞が各店舗を回り、店頭に吊るされた御祝儀(採青)をとり、おめでとうと商売繁栄を祈る春節伝統行事
http://www.chinatown.or.jp/news/shunsetsu08/


"旧暦大みそかの6日夜、「NHK紅白歌合戦」にあたる
中国中央電視台(CCTV)の旧正月年越し番組『春節聯歓晩会』"
 [中国情報局]
http://news.searchina.ne.jp/disp.cgi?y=2008&d=0207&f=entertainment_0207_001.shtml


ブット氏暗殺で容疑者2人逮捕=イスラム武装勢力と関連か
"【ニューデリー7日時事】パキスタン当局は7日、野党指導者ブット元首相暗殺に絡んで男2人を首都イスラマバード近郊のラワルピンディで逮捕
当局は、対アフガニスタン国境の部族地域・南ワジリスタン地区のイスラム武装勢力指導者、バイトゥッラー・メフスード容疑者が事件に関与したとみている。" AFP通信
http://headlines.yahoo.co.jp/hl?a=20080207-00000181-jij-int




Progress 28 (P28) docked ISS

"The Progress M-63 space freighter:
The automatic docking with the orbital station has been set for 2:38 p.m. GMT on February 7." - RIA Novosti - Russia
http://en.rian.ru/russia/20080205/98376575.html





VOA News
"NASA: Bad Weather Could Delay Shuttle Launch"
http://voanews.com/english/2008-02-05-voa40.cfm


STS-122 : Shuttle Atlantis
Launch Time: 2:45 p.m.
EST日本時間 2月8日 4時45分

STS-122 Interactive timeline
STS-122: Interactive Mission Timeline
http://www.nasa.gov/externalflash/STS122_flash/
Schedule 12days
国際宇宙ステーションの組立フライト 1E(STS-122)JAXA
http://iss.jaxa.jp/iss/1e/index.html


Feb. 7, Thursday
5:15 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)



Date: Feb. 7
Mission: STS-122
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Launch Time: 2:45 p.m. EST
Description: STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.
━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛


Feb. 7, Thursday
5:30 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)

March 4, Tuesday
9 a.m. - 3 p.m. - STS-123 Preflight Briefings - JSC (Public and Media Channels)

April 3, Thursday
9 a.m. - 3 p.m. - STS-124 Preflight Briefings - JSC


━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛
次のSTS-123「エンデバー
3月11日午前2時31分
(日本時間同日午後4時31分)に打ち上げ予定
Mission: STS-123
Launch Vehicle: Space Shuttle Endeavour
Space Shuttle Endeavour : Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.
STS-124はApril 24
Space Shuttle Discovery: Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM-RMS) to the International Space Station.


STS-125 Aug. 7
Space Shuttle Atlantis
the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


STS-126 Sept. 18
Space Shuttle Endeavour
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the ISS.



LIFTOFF of Atlantis 2006年09月29日 wakeup music "moon river"




━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛



FLIGHT DAY 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
•Shuttle Robotic Arm Activation and Checkout
•Umbilical Well and Handheld External Tank Video and Stills Downlink






FLIGHT DAY 2
•Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System (OBSS)
•Extravehicular Mobility Unit Checkout
•Centerline Camera Installation
•Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout

COLUMBUS CONTROL CENTER, OBERPFAFFENHOFEN, GERMANY



FLIGHT DAY 3
Rendezvous with the International Space Station
Rendezvous Pitch Maneuver Photography by the Expedition 16 Crew •Docking to Harmony (Node 2)/Pressurized Mating Adapter‐2 •Hatch Opening and Welcoming •OBSS Unberth by Canadarm2 •Extravehicular Activity (EVA) 1 Procedure Review
•EVA‐1 Campout by Walheim and Schlegel




FLIGHT DAY 4
•Soyuz Seat Liner Swap and Expedition Crew Exchange by Tani and Eyharts
•EVA‐1 by Walheim and Schlegel (Columbus Grapple Fixture Installation, P1 Truss Nitrogen Tank Assembly Preparation) •Temporary Shuttle Ku‐band Antenna Stowage for Columbus Module Unberth
•Columbus Module Grapple, Unberth and Installation on Starboard Side of Harmony


FLIGHT DAY 5
•Atlantis Thermal Protection System Focused Inspection with OBSS (if required)
•Shuttle Ku‐band Antenna Redeployment
•Columbus Module Ingress Preparations
•Columbus Module Ingress
•EVA‐2 Procedure Review •EVA‐2 Campout by Walheim and Schlegel




FLIGHT DAY 6
•EVA‐2 by Walheim and Schlegel (P1 Truss Nitrogen Tank Assembly Installation, Stowage of Old N2 Tank Assembly)
•Columbus Module Outfitting




FLIGHT DAY 7
• Columbus Module Racks and Systems Outfitting
• Off Duty Periods
• EVA‐3 Procedure Review •EVA‐3 Campout by Walheim and Love




FLIGHT DAY 8
•EVA‐3 by Walheim and Love (SOLAR and EuTEF Facility Installation, Failed Control Moment Gyroscope Transfer to Atlantis・Payload Bay)




FLIGHT DAY 9
•Shuttle and Station Transfers
•Joint Crew News Conference
ISS Reboost
•Columbus Module Outfitting
•Farewells and Hatch Closure




FLIGHT DAY 10
•Undocking from Harmony Node 2/Pressurized Mating Adapter‐2 and Flyaround
•Final Separation from the International Space Station •OBSS Unberth and Late Inspection of Atlantis's Thermal Protection System
•OBSS Final Berthing




FLIGHT DAY 11
•Cabin Stow •Flight Control System Checkout
•Reaction Control System Hot‐Fire Test
•Crew Deorbit Briefing •Launch and Entry Suit Checkout •Recumbent Seat Set Up for Tani
•Ku‐Band Antenna Stow





FLIGHT DAY 12
•Deorbit Preparations
•Payload Bay Door Closing
•Deorbit Burn
•Kennedy Space Center Landing



横浜チャイナタウン「2008春節
獅子舞が各店舗を回り、店頭に吊るされた御祝儀(採青)をとり、おめでとうと商売繁栄を祈る春節伝統行事
http://www.chinatown.or.jp/news/shunsetsu08/


"旧暦大みそかの6日夜、「NHK紅白歌合戦」にあたる
中国中央電視台(CCTV)の旧正月年越し番組『春節聯歓晩会』"
 [中国情報局]
http://news.searchina.ne.jp/disp.cgi?y=2008&d=0207&f=entertainment_0207_001.shtml


ブット氏暗殺で容疑者2人逮捕=イスラム武装勢力と関連か
"【ニューデリー7日時事】パキスタン当局は7日、野党指導者ブット元首相暗殺に絡んで男2人を首都イスラマバード近郊のラワルピンディで逮捕
当局は、対アフガニスタン国境の部族地域・南ワジリスタン地区のイスラム武装勢力指導者、バイトゥッラー・メフスード容疑者が事件に関与したとみている。" AFP通信
http://headlines.yahoo.co.jp/hl?a=20080207-00000181-jij-int











Progress 28 (P28) docked ISS

"The Progress M-63 space freighter:
The automatic docking with the orbital station has been set for 2:38 p.m. GMT on February 7." - RIA Novosti - Russia
http://en.rian.ru/russia/20080205/98376575.html





VOA News
"NASA: Bad Weather Could Delay Shuttle Launch"
http://voanews.com/english/2008-02-05-voa40.cfm


STS-122 : Shuttle Atlantis
Launch Time: 2:45 p.m.
EST日本時間 2月8日 4時45分

STS-122 Interactive timeline
STS-122: Interactive Mission Timeline
http://www.nasa.gov/externalflash/STS122_flash/
Schedule 12days
国際宇宙ステーションの組立フライト 1E(STS-122)JAXA
http://iss.jaxa.jp/iss/1e/index.html


Feb. 7, Thursday
5:15 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)



Date: Feb. 7
Mission: STS-122
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Launch Time: 2:45 p.m. EST
Description: STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.
━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛


Feb. 7, Thursday
5:30 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)

March 4, Tuesday
9 a.m. - 3 p.m. - STS-123 Preflight Briefings - JSC (Public and Media Channels)

April 3, Thursday
9 a.m. - 3 p.m. - STS-124 Preflight Briefings - JSC


━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛
次のSTS-123「エンデバー
3月11日午前2時31分
(日本時間同日午後4時31分)に打ち上げ予定
Mission: STS-123
Launch Vehicle: Space Shuttle Endeavour
Space Shuttle Endeavour : Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.
STS-124はApril 24
Space Shuttle Discovery: Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM-RMS) to the International Space Station.


STS-125 Aug. 7
Space Shuttle Atlantis
the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


STS-126 Sept. 18
Space Shuttle Endeavour
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the ISS.



LIFTOFF of Atlantis 2006年09月29日 wakeup music "moon river"




━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛



FLIGHT DAY 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
•Shuttle Robotic Arm Activation and Checkout
•Umbilical Well and Handheld External Tank Video and Stills Downlink






FLIGHT DAY 2
•Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System (OBSS)
•Extravehicular Mobility Unit Checkout
•Centerline Camera Installation
•Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout

COLUMBUS CONTROL CENTER, OBERPFAFFENHOFEN, GERMANY



FLIGHT DAY 3
Rendezvous with the International Space Station
Rendezvous Pitch Maneuver Photography by the Expedition 16 Crew •Docking to Harmony (Node 2)/Pressurized Mating Adapter‐2 •Hatch Opening and Welcoming •OBSS Unberth by Canadarm2 •Extravehicular Activity (EVA) 1 Procedure Review
•EVA‐1 Campout by Walheim and Schlegel




FLIGHT DAY 4
•Soyuz Seat Liner Swap and Expedition Crew Exchange by Tani and Eyharts
•EVA‐1 by Walheim and Schlegel (Columbus Grapple Fixture Installation, P1 Truss Nitrogen Tank Assembly Preparation) •Temporary Shuttle Ku‐band Antenna Stowage for Columbus Module Unberth
•Columbus Module Grapple, Unberth and Installation on Starboard Side of Harmony


FLIGHT DAY 5
•Atlantis Thermal Protection System Focused Inspection with OBSS (if required)
•Shuttle Ku‐band Antenna Redeployment
•Columbus Module Ingress Preparations
•Columbus Module Ingress
•EVA‐2 Procedure Review •EVA‐2 Campout by Walheim and Schlegel




FLIGHT DAY 6
•EVA‐2 by Walheim and Schlegel (P1 Truss Nitrogen Tank Assembly Installation, Stowage of Old N2 Tank Assembly)
•Columbus Module Outfitting




FLIGHT DAY 7
• Columbus Module Racks and Systems Outfitting
• Off Duty Periods
• EVA‐3 Procedure Review •EVA‐3 Campout by Walheim and Love




FLIGHT DAY 8
•EVA‐3 by Walheim and Love (SOLAR and EuTEF Facility Installation, Failed Control Moment Gyroscope Transfer to Atlantis・Payload Bay)




FLIGHT DAY 9
•Shuttle and Station Transfers
•Joint Crew News Conference
ISS Reboost
•Columbus Module Outfitting
•Farewells and Hatch Closure




FLIGHT DAY 10
•Undocking from Harmony Node 2/Pressurized Mating Adapter‐2 and Flyaround
•Final Separation from the International Space Station •OBSS Unberth and Late Inspection of Atlantis's Thermal Protection System
•OBSS Final Berthing




FLIGHT DAY 11
•Cabin Stow •Flight Control System Checkout
•Reaction Control System Hot‐Fire Test
•Crew Deorbit Briefing •Launch and Entry Suit Checkout •Recumbent Seat Set Up for Tani
•Ku‐Band Antenna Stow





FLIGHT DAY 12
•Deorbit Preparations
•Payload Bay Door Closing
•Deorbit Burn
•Kennedy Space Center Landing



横浜チャイナタウン「2008春節
獅子舞が各店舗を回り、店頭に吊るされた御祝儀(採青)をとり、おめでとうと商売繁栄を祈る春節伝統行事
http://www.chinatown.or.jp/news/shunsetsu08/


"旧暦大みそかの6日夜、「NHK紅白歌合戦」にあたる
中国中央電視台(CCTV)の旧正月年越し番組『春節聯歓晩会』"
 [中国情報局]
http://news.searchina.ne.jp/disp.cgi?y=2008&d=0207&f=entertainment_0207_001.shtml


ブット氏暗殺で容疑者2人逮捕=イスラム武装勢力と関連か
"【ニューデリー7日時事】パキスタン当局は7日、野党指導者ブット元首相暗殺に絡んで男2人を首都イスラマバード近郊のラワルピンディで逮捕
当局は、対アフガニスタン国境の部族地域・南ワジリスタン地区のイスラム武装勢力指導者、バイトゥッラー・メフスード容疑者が事件に関与したとみている。" AFP通信
http://headlines.yahoo.co.jp/hl?a=20080207-00000181-jij-int




Progress 28 (P28) docked ISS

"The Progress M-63 space freighter:
The automatic docking with the orbital station has been set for 2:38 p.m. GMT on February 7." - RIA Novosti - Russia
http://en.rian.ru/russia/20080205/98376575.html





VOA News
"NASA: Bad Weather Could Delay Shuttle Launch"
http://voanews.com/english/2008-02-05-voa40.cfm


STS-122 : Shuttle Atlantis
Launch Time: 2:45 p.m.
EST日本時間 2月8日 4時45分

STS-122 Interactive timeline
STS-122: Interactive Mission Timeline
http://www.nasa.gov/externalflash/STS122_flash/
Schedule 12days
国際宇宙ステーションの組立フライト 1E(STS-122)JAXA
http://iss.jaxa.jp/iss/1e/index.html


Feb. 7, Thursday
5:15 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)



Date: Feb. 7
Mission: STS-122
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Launch Time: 2:45 p.m. EST
Description: STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.
━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛


Feb. 7, Thursday
5:30 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)

March 4, Tuesday
9 a.m. - 3 p.m. - STS-123 Preflight Briefings - JSC (Public and Media Channels)

April 3, Thursday
9 a.m. - 3 p.m. - STS-124 Preflight Briefings - JSC


━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛
次のSTS-123「エンデバー
3月11日午前2時31分
(日本時間同日午後4時31分)に打ち上げ予定
Mission: STS-123
Launch Vehicle: Space Shuttle Endeavour
Space Shuttle Endeavour : Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.
STS-124はApril 24
Space Shuttle Discovery: Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM-RMS) to the International Space Station.


STS-125 Aug. 7
Space Shuttle Atlantis
the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


STS-126 Sept. 18
Space Shuttle Endeavour
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the ISS.



LIFTOFF of Atlantis 2006年09月29日 wakeup music "moon river"




━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛



FLIGHT DAY 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
•Shuttle Robotic Arm Activation and Checkout
•Umbilical Well and Handheld External Tank Video and Stills Downlink






FLIGHT DAY 2
•Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System (OBSS)
•Extravehicular Mobility Unit Checkout
•Centerline Camera Installation
•Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout

COLUMBUS CONTROL CENTER, OBERPFAFFENHOFEN, GERMANY



FLIGHT DAY 3
Rendezvous with the International Space Station
Rendezvous Pitch Maneuver Photography by the Expedition 16 Crew •Docking to Harmony (Node 2)/Pressurized Mating Adapter‐2 •Hatch Opening and Welcoming •OBSS Unberth by Canadarm2 •Extravehicular Activity (EVA) 1 Procedure Review
•EVA‐1 Campout by Walheim and Schlegel




FLIGHT DAY 4
•Soyuz Seat Liner Swap and Expedition Crew Exchange by Tani and Eyharts
•EVA‐1 by Walheim and Schlegel (Columbus Grapple Fixture Installation, P1 Truss Nitrogen Tank Assembly Preparation) •Temporary Shuttle Ku‐band Antenna Stowage for Columbus Module Unberth
•Columbus Module Grapple, Unberth and Installation on Starboard Side of Harmony


FLIGHT DAY 5
•Atlantis Thermal Protection System Focused Inspection with OBSS (if required)
•Shuttle Ku‐band Antenna Redeployment
•Columbus Module Ingress Preparations
•Columbus Module Ingress
•EVA‐2 Procedure Review •EVA‐2 Campout by Walheim and Schlegel




FLIGHT DAY 6
•EVA‐2 by Walheim and Schlegel (P1 Truss Nitrogen Tank Assembly Installation, Stowage of Old N2 Tank Assembly)
•Columbus Module Outfitting




FLIGHT DAY 7
• Columbus Module Racks and Systems Outfitting
• Off Duty Periods
• EVA‐3 Procedure Review •EVA‐3 Campout by Walheim and Love




FLIGHT DAY 8
•EVA‐3 by Walheim and Love (SOLAR and EuTEF Facility Installation, Failed Control Moment Gyroscope Transfer to Atlantis・Payload Bay)




FLIGHT DAY 9
•Shuttle and Station Transfers
•Joint Crew News Conference
ISS Reboost
•Columbus Module Outfitting
•Farewells and Hatch Closure




FLIGHT DAY 10
•Undocking from Harmony Node 2/Pressurized Mating Adapter‐2 and Flyaround
•Final Separation from the International Space Station •OBSS Unberth and Late Inspection of Atlantis's Thermal Protection System
•OBSS Final Berthing




FLIGHT DAY 11
•Cabin Stow •Flight Control System Checkout
•Reaction Control System Hot‐Fire Test
•Crew Deorbit Briefing •Launch and Entry Suit Checkout •Recumbent Seat Set Up for Tani
•Ku‐Band Antenna Stow





FLIGHT DAY 12
•Deorbit Preparations
•Payload Bay Door Closing
•Deorbit Burn
•Kennedy Space Center Landing



横浜チャイナタウン「2008春節
獅子舞が各店舗を回り、店頭に吊るされた御祝儀(採青)をとり、おめでとうと商売繁栄を祈る春節伝統行事
http://www.chinatown.or.jp/news/shunsetsu08/


"旧暦大みそかの6日夜、「NHK紅白歌合戦」にあたる
中国中央電視台(CCTV)の旧正月年越し番組『春節聯歓晩会』"
 [中国情報局]
http://news.searchina.ne.jp/disp.cgi?y=2008&d=0207&f=entertainment_0207_001.shtml


ブット氏暗殺で容疑者2人逮捕=イスラム武装勢力と関連か
"【ニューデリー7日時事】パキスタン当局は7日、野党指導者ブット元首相暗殺に絡んで男2人を首都イスラマバード近郊のラワルピンディで逮捕
当局は、対アフガニスタン国境の部族地域・南ワジリスタン地区のイスラム武装勢力指導者、バイトゥッラー・メフスード容疑者が事件に関与したとみている。" AFP通信
http://headlines.yahoo.co.jp/hl?a=20080207-00000181-jij-int




Progress 28 (P28) docked ISS

"The Progress M-63 space freighter:
The automatic docking with the orbital station has been set for 2:38 p.m. GMT on February 7." - RIA Novosti - Russia
http://en.rian.ru/russia/20080205/98376575.html





VOA News
"NASA: Bad Weather Could Delay Shuttle Launch"
http://voanews.com/english/2008-02-05-voa40.cfm


STS-122 : Shuttle Atlantis
Launch Time: 2:45 p.m.
EST日本時間 2月8日 4時45分

STS-122 Interactive timeline
STS-122: Interactive Mission Timeline
http://www.nasa.gov/externalflash/STS122_flash/
Schedule 12days
国際宇宙ステーションの組立フライト 1E(STS-122)JAXA
http://iss.jaxa.jp/iss/1e/index.html


Feb. 7, Thursday
5:15 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)



Date: Feb. 7
Mission: STS-122
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Launch Time: 2:45 p.m. EST
Description: STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.
━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛


Feb. 7, Thursday
5:30 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)

March 4, Tuesday
9 a.m. - 3 p.m. - STS-123 Preflight Briefings - JSC (Public and Media Channels)

April 3, Thursday
9 a.m. - 3 p.m. - STS-124 Preflight Briefings - JSC


━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛
次のSTS-123「エンデバー
3月11日午前2時31分
(日本時間同日午後4時31分)に打ち上げ予定
Mission: STS-123
Launch Vehicle: Space Shuttle Endeavour
Space Shuttle Endeavour : Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.
STS-124はApril 24
Space Shuttle Discovery: Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM-RMS) to the International Space Station.


STS-125 Aug. 7
Space Shuttle Atlantis
the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


STS-126 Sept. 18
Space Shuttle Endeavour
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the ISS.



LIFTOFF of Atlantis 2006年09月29日 wakeup music "moon river"




━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛



FLIGHT DAY 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
•Shuttle Robotic Arm Activation and Checkout
•Umbilical Well and Handheld External Tank Video and Stills Downlink






FLIGHT DAY 2
•Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System (OBSS)
•Extravehicular Mobility Unit Checkout
•Centerline Camera Installation
•Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout

COLUMBUS CONTROL CENTER, OBERPFAFFENHOFEN, GERMANY



FLIGHT DAY 3
Rendezvous with the International Space Station
Rendezvous Pitch Maneuver Photography by the Expedition 16 Crew •Docking to Harmony (Node 2)/Pressurized Mating Adapter‐2 •Hatch Opening and Welcoming •OBSS Unberth by Canadarm2 •Extravehicular Activity (EVA) 1 Procedure Review
•EVA‐1 Campout by Walheim and Schlegel




FLIGHT DAY 4
•Soyuz Seat Liner Swap and Expedition Crew Exchange by Tani and Eyharts
•EVA‐1 by Walheim and Schlegel (Columbus Grapple Fixture Installation, P1 Truss Nitrogen Tank Assembly Preparation) •Temporary Shuttle Ku‐band Antenna Stowage for Columbus Module Unberth
•Columbus Module Grapple, Unberth and Installation on Starboard Side of Harmony


FLIGHT DAY 5
•Atlantis Thermal Protection System Focused Inspection with OBSS (if required)
•Shuttle Ku‐band Antenna Redeployment
•Columbus Module Ingress Preparations
•Columbus Module Ingress
•EVA‐2 Procedure Review •EVA‐2 Campout by Walheim and Schlegel




FLIGHT DAY 6
•EVA‐2 by Walheim and Schlegel (P1 Truss Nitrogen Tank Assembly Installation, Stowage of Old N2 Tank Assembly)
•Columbus Module Outfitting




FLIGHT DAY 7
• Columbus Module Racks and Systems Outfitting
• Off Duty Periods
• EVA‐3 Procedure Review •EVA‐3 Campout by Walheim and Love




FLIGHT DAY 8
•EVA‐3 by Walheim and Love (SOLAR and EuTEF Facility Installation, Failed Control Moment Gyroscope Transfer to Atlantis・Payload Bay)




FLIGHT DAY 9
•Shuttle and Station Transfers
•Joint Crew News Conference
ISS Reboost
•Columbus Module Outfitting
•Farewells and Hatch Closure




FLIGHT DAY 10
•Undocking from Harmony Node 2/Pressurized Mating Adapter‐2 and Flyaround
•Final Separation from the International Space Station •OBSS Unberth and Late Inspection of Atlantis's Thermal Protection System
•OBSS Final Berthing




FLIGHT DAY 11
•Cabin Stow •Flight Control System Checkout
•Reaction Control System Hot‐Fire Test
•Crew Deorbit Briefing •Launch and Entry Suit Checkout •Recumbent Seat Set Up for Tani
•Ku‐Band Antenna Stow





FLIGHT DAY 12
•Deorbit Preparations
•Payload Bay Door Closing
•Deorbit Burn
•Kennedy Space Center Landing



横浜チャイナタウン「2008春節
獅子舞が各店舗を回り、店頭に吊るされた御祝儀(採青)をとり、おめでとうと商売繁栄を祈る春節伝統行事
http://www.chinatown.or.jp/news/shunsetsu08/


"旧暦大みそかの6日夜、「NHK紅白歌合戦」にあたる
中国中央電視台(CCTV)の旧正月年越し番組『春節聯歓晩会』"
 [中国情報局]
http://news.searchina.ne.jp/disp.cgi?y=2008&d=0207&f=entertainment_0207_001.shtml


ブット氏暗殺で容疑者2人逮捕=イスラム武装勢力と関連か
"【ニューデリー7日時事】パキスタン当局は7日、野党指導者ブット元首相暗殺に絡んで男2人を首都イスラマバード近郊のラワルピンディで逮捕
当局は、対アフガニスタン国境の部族地域・南ワジリスタン地区のイスラム武装勢力指導者、バイトゥッラー・メフスード容疑者が事件に関与したとみている。" AFP通信
http://headlines.yahoo.co.jp/hl?a=20080207-00000181-jij-int









Progress 28 (P28) docked ISS

"The Progress M-63 space freighter:
The automatic docking with the orbital station has been set for 2:38 p.m. GMT on February 7." - RIA Novosti - Russia
http://en.rian.ru/russia/20080205/98376575.html





VOA News
"NASA: Bad Weather Could Delay Shuttle Launch"
http://voanews.com/english/2008-02-05-voa40.cfm


STS-122 : Shuttle Atlantis
Launch Time: 2:45 p.m.
EST日本時間 2月8日 4時45分

STS-122 Interactive timeline
STS-122: Interactive Mission Timeline
http://www.nasa.gov/externalflash/STS122_flash/
Schedule 12days
国際宇宙ステーションの組立フライト 1E(STS-122)JAXA
http://iss.jaxa.jp/iss/1e/index.html


Feb. 7, Thursday
5:15 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)



Date: Feb. 7
Mission: STS-122
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Launch Time: 2:45 p.m. EST
Description: STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.
━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛


Feb. 7, Thursday
5:30 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)

March 4, Tuesday
9 a.m. - 3 p.m. - STS-123 Preflight Briefings - JSC (Public and Media Channels)

April 3, Thursday
9 a.m. - 3 p.m. - STS-124 Preflight Briefings - JSC


━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛
次のSTS-123「エンデバー
3月11日午前2時31分
(日本時間同日午後4時31分)に打ち上げ予定
Mission: STS-123
Launch Vehicle: Space Shuttle Endeavour
Space Shuttle Endeavour : Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.
STS-124はApril 24
Space Shuttle Discovery: Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM-RMS) to the International Space Station.


STS-125 Aug. 7
Space Shuttle Atlantis
the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


STS-126 Sept. 18
Space Shuttle Endeavour
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the ISS.



LIFTOFF of Atlantis 2006年09月29日 wakeup music "moon river"




━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛



FLIGHT DAY 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
•Shuttle Robotic Arm Activation and Checkout
•Umbilical Well and Handheld External Tank Video and Stills Downlink






FLIGHT DAY 2
•Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System (OBSS)
•Extravehicular Mobility Unit Checkout
•Centerline Camera Installation
•Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout

COLUMBUS CONTROL CENTER, OBERPFAFFENHOFEN, GERMANY



FLIGHT DAY 3
Rendezvous with the International Space Station
Rendezvous Pitch Maneuver Photography by the Expedition 16 Crew •Docking to Harmony (Node 2)/Pressurized Mating Adapter‐2 •Hatch Opening and Welcoming •OBSS Unberth by Canadarm2 •Extravehicular Activity (EVA) 1 Procedure Review
•EVA‐1 Campout by Walheim and Schlegel




FLIGHT DAY 4
•Soyuz Seat Liner Swap and Expedition Crew Exchange by Tani and Eyharts
•EVA‐1 by Walheim and Schlegel (Columbus Grapple Fixture Installation, P1 Truss Nitrogen Tank Assembly Preparation) •Temporary Shuttle Ku‐band Antenna Stowage for Columbus Module Unberth
•Columbus Module Grapple, Unberth and Installation on Starboard Side of Harmony


FLIGHT DAY 5
•Atlantis Thermal Protection System Focused Inspection with OBSS (if required)
•Shuttle Ku‐band Antenna Redeployment
•Columbus Module Ingress Preparations
•Columbus Module Ingress
•EVA‐2 Procedure Review •EVA‐2 Campout by Walheim and Schlegel




FLIGHT DAY 6
•EVA‐2 by Walheim and Schlegel (P1 Truss Nitrogen Tank Assembly Installation, Stowage of Old N2 Tank Assembly)
•Columbus Module Outfitting




FLIGHT DAY 7
• Columbus Module Racks and Systems Outfitting
• Off Duty Periods
• EVA‐3 Procedure Review •EVA‐3 Campout by Walheim and Love




FLIGHT DAY 8
•EVA‐3 by Walheim and Love (SOLAR and EuTEF Facility Installation, Failed Control Moment Gyroscope Transfer to Atlantis・Payload Bay)




FLIGHT DAY 9
•Shuttle and Station Transfers
•Joint Crew News Conference
ISS Reboost
•Columbus Module Outfitting
•Farewells and Hatch Closure




FLIGHT DAY 10
•Undocking from Harmony Node 2/Pressurized Mating Adapter‐2 and Flyaround
•Final Separation from the International Space Station •OBSS Unberth and Late Inspection of Atlantis's Thermal Protection System
•OBSS Final Berthing




FLIGHT DAY 11
•Cabin Stow •Flight Control System Checkout
•Reaction Control System Hot‐Fire Test
•Crew Deorbit Briefing •Launch and Entry Suit Checkout •Recumbent Seat Set Up for Tani
•Ku‐Band Antenna Stow





FLIGHT DAY 12
•Deorbit Preparations
•Payload Bay Door Closing
•Deorbit Burn
•Kennedy Space Center Landing



横浜チャイナタウン「2008春節
獅子舞が各店舗を回り、店頭に吊るされた御祝儀(採青)をとり、おめでとうと商売繁栄を祈る春節伝統行事
http://www.chinatown.or.jp/news/shunsetsu08/


"旧暦大みそかの6日夜、「NHK紅白歌合戦」にあたる
中国中央電視台(CCTV)の旧正月年越し番組『春節聯歓晩会』"
 [中国情報局]
http://news.searchina.ne.jp/disp.cgi?y=2008&d=0207&f=entertainment_0207_001.shtml


ブット氏暗殺で容疑者2人逮捕=イスラム武装勢力と関連か
"【ニューデリー7日時事】パキスタン当局は7日、野党指導者ブット元首相暗殺に絡んで男2人を首都イスラマバード近郊のラワルピンディで逮捕
当局は、対アフガニスタン国境の部族地域・南ワジリスタン地区のイスラム武装勢力指導者、バイトゥッラー・メフスード容疑者が事件に関与したとみている。" AFP通信
http://headlines.yahoo.co.jp/hl?a=20080207-00000181-jij-int




Progress 28 (P28) docked ISS

"The Progress M-63 space freighter:
The automatic docking with the orbital station has been set for 2:38 p.m. GMT on February 7." - RIA Novosti - Russia
http://en.rian.ru/russia/20080205/98376575.html





VOA News
"NASA: Bad Weather Could Delay Shuttle Launch"
http://voanews.com/english/2008-02-05-voa40.cfm


STS-122 : Shuttle Atlantis
Launch Time: 2:45 p.m.
EST日本時間 2月8日 4時45分

STS-122 Interactive timeline
STS-122: Interactive Mission Timeline
http://www.nasa.gov/externalflash/STS122_flash/
Schedule 12days
国際宇宙ステーションの組立フライト 1E(STS-122)JAXA
http://iss.jaxa.jp/iss/1e/index.html


Feb. 7, Thursday
5:15 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)



Date: Feb. 7
Mission: STS-122
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Launch Time: 2:45 p.m. EST
Description: STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.
━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛


Feb. 7, Thursday
5:30 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)

March 4, Tuesday
9 a.m. - 3 p.m. - STS-123 Preflight Briefings - JSC (Public and Media Channels)

April 3, Thursday
9 a.m. - 3 p.m. - STS-124 Preflight Briefings - JSC


━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛
次のSTS-123「エンデバー
3月11日午前2時31分
(日本時間同日午後4時31分)に打ち上げ予定
Mission: STS-123
Launch Vehicle: Space Shuttle Endeavour
Space Shuttle Endeavour : Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.
STS-124はApril 24
Space Shuttle Discovery: Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM-RMS) to the International Space Station.


STS-125 Aug. 7
Space Shuttle Atlantis
the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


STS-126 Sept. 18
Space Shuttle Endeavour
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the ISS.



LIFTOFF of Atlantis 2006年09月29日 wakeup music "moon river"




━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛



FLIGHT DAY 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
•Shuttle Robotic Arm Activation and Checkout
•Umbilical Well and Handheld External Tank Video and Stills Downlink






FLIGHT DAY 2
•Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System (OBSS)
•Extravehicular Mobility Unit Checkout
•Centerline Camera Installation
•Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout

COLUMBUS CONTROL CENTER, OBERPFAFFENHOFEN, GERMANY



FLIGHT DAY 3
Rendezvous with the International Space Station
Rendezvous Pitch Maneuver Photography by the Expedition 16 Crew •Docking to Harmony (Node 2)/Pressurized Mating Adapter‐2 •Hatch Opening and Welcoming •OBSS Unberth by Canadarm2 •Extravehicular Activity (EVA) 1 Procedure Review
•EVA‐1 Campout by Walheim and Schlegel




FLIGHT DAY 4
•Soyuz Seat Liner Swap and Expedition Crew Exchange by Tani and Eyharts
•EVA‐1 by Walheim and Schlegel (Columbus Grapple Fixture Installation, P1 Truss Nitrogen Tank Assembly Preparation) •Temporary Shuttle Ku‐band Antenna Stowage for Columbus Module Unberth
•Columbus Module Grapple, Unberth and Installation on Starboard Side of Harmony


FLIGHT DAY 5
•Atlantis Thermal Protection System Focused Inspection with OBSS (if required)
•Shuttle Ku‐band Antenna Redeployment
•Columbus Module Ingress Preparations
•Columbus Module Ingress
•EVA‐2 Procedure Review •EVA‐2 Campout by Walheim and Schlegel




FLIGHT DAY 6
•EVA‐2 by Walheim and Schlegel (P1 Truss Nitrogen Tank Assembly Installation, Stowage of Old N2 Tank Assembly)
•Columbus Module Outfitting




FLIGHT DAY 7
• Columbus Module Racks and Systems Outfitting
• Off Duty Periods
• EVA‐3 Procedure Review •EVA‐3 Campout by Walheim and Love




FLIGHT DAY 8
•EVA‐3 by Walheim and Love (SOLAR and EuTEF Facility Installation, Failed Control Moment Gyroscope Transfer to Atlantis・Payload Bay)




FLIGHT DAY 9
•Shuttle and Station Transfers
•Joint Crew News Conference
ISS Reboost
•Columbus Module Outfitting
•Farewells and Hatch Closure




FLIGHT DAY 10
•Undocking from Harmony Node 2/Pressurized Mating Adapter‐2 and Flyaround
•Final Separation from the International Space Station •OBSS Unberth and Late Inspection of Atlantis's Thermal Protection System
•OBSS Final Berthing




FLIGHT DAY 11
•Cabin Stow •Flight Control System Checkout
•Reaction Control System Hot‐Fire Test
•Crew Deorbit Briefing •Launch and Entry Suit Checkout •Recumbent Seat Set Up for Tani
•Ku‐Band Antenna Stow





FLIGHT DAY 12
•Deorbit Preparations
•Payload Bay Door Closing
•Deorbit Burn
•Kennedy Space Center Landing



横浜チャイナタウン「2008春節
獅子舞が各店舗を回り、店頭に吊るされた御祝儀(採青)をとり、おめでとうと商売繁栄を祈る春節伝統行事
http://www.chinatown.or.jp/news/shunsetsu08/


"旧暦大みそかの6日夜、「NHK紅白歌合戦」にあたる
中国中央電視台(CCTV)の旧正月年越し番組『春節聯歓晩会』"
 [中国情報局]
http://news.searchina.ne.jp/disp.cgi?y=2008&d=0207&f=entertainment_0207_001.shtml


ブット氏暗殺で容疑者2人逮捕=イスラム武装勢力と関連か
"【ニューデリー7日時事】パキスタン当局は7日、野党指導者ブット元首相暗殺に絡んで男2人を首都イスラマバード近郊のラワルピンディで逮捕
当局は、対アフガニスタン国境の部族地域・南ワジリスタン地区のイスラム武装勢力指導者、バイトゥッラー・メフスード容疑者が事件に関与したとみている。" AFP通信
http://headlines.yahoo.co.jp/hl?a=20080207-00000181-jij-int




Progress 28 (P28) docked ISS

"The Progress M-63 space freighter:
The automatic docking with the orbital station has been set for 2:38 p.m. GMT on February 7." - RIA Novosti - Russia
http://en.rian.ru/russia/20080205/98376575.html





VOA News
"NASA: Bad Weather Could Delay Shuttle Launch"
http://voanews.com/english/2008-02-05-voa40.cfm


STS-122 : Shuttle Atlantis
Launch Time: 2:45 p.m.
EST日本時間 2月8日 4時45分

STS-122 Interactive timeline
STS-122: Interactive Mission Timeline
http://www.nasa.gov/externalflash/STS122_flash/
Schedule 12days
国際宇宙ステーションの組立フライト 1E(STS-122)JAXA
http://iss.jaxa.jp/iss/1e/index.html


Feb. 7, Thursday
5:15 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)



Date: Feb. 7
Mission: STS-122
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Launch Time: 2:45 p.m. EST
Description: STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.
━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛


Feb. 7, Thursday
5:30 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)

March 4, Tuesday
9 a.m. - 3 p.m. - STS-123 Preflight Briefings - JSC (Public and Media Channels)

April 3, Thursday
9 a.m. - 3 p.m. - STS-124 Preflight Briefings - JSC


━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛
次のSTS-123「エンデバー
3月11日午前2時31分
(日本時間同日午後4時31分)に打ち上げ予定
Mission: STS-123
Launch Vehicle: Space Shuttle Endeavour
Space Shuttle Endeavour : Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.
STS-124はApril 24
Space Shuttle Discovery: Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM-RMS) to the International Space Station.


STS-125 Aug. 7
Space Shuttle Atlantis
the fifth and final servicing mission to the Hubble Space Telescope. During the 11-day flight, the crew will repair and improve the observatory's capabilities through 2013.


STS-126 Sept. 18
Space Shuttle Endeavour
Description: Space Shuttle Endeavour launching on assembly flight ULF2, will deliver a Multi-Purpose Logistics Module to the ISS.



LIFTOFF of Atlantis 2006年09月29日 wakeup music "moon river"




━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛



FLIGHT DAY 1
• Launch
• Payload Bay Door Opening
• Ku‐Band Antenna Deployment
•Shuttle Robotic Arm Activation and Checkout
•Umbilical Well and Handheld External Tank Video and Stills Downlink






FLIGHT DAY 2
•Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System (OBSS)
•Extravehicular Mobility Unit Checkout
•Centerline Camera Installation
•Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous Tools Checkout

COLUMBUS CONTROL CENTER, OBERPFAFFENHOFEN, GERMANY



FLIGHT DAY 3
Rendezvous with the International Space Station
Rendezvous Pitch Maneuver Photography by the Expedition 16 Crew •Docking to Harmony (Node 2)/Pressurized Mating Adapter‐2 •Hatch Opening and Welcoming •OBSS Unberth by Canadarm2 •Extravehicular Activity (EVA) 1 Procedure Review
•EVA‐1 Campout by Walheim and Schlegel




FLIGHT DAY 4
•Soyuz Seat Liner Swap and Expedition Crew Exchange by Tani and Eyharts
•EVA‐1 by Walheim and Schlegel (Columbus Grapple Fixture Installation, P1 Truss Nitrogen Tank Assembly Preparation) •Temporary Shuttle Ku‐band Antenna Stowage for Columbus Module Unberth
•Columbus Module Grapple, Unberth and Installation on Starboard Side of Harmony


FLIGHT DAY 5
•Atlantis Thermal Protection System Focused Inspection with OBSS (if required)
•Shuttle Ku‐band Antenna Redeployment
•Columbus Module Ingress Preparations
•Columbus Module Ingress
•EVA‐2 Procedure Review •EVA‐2 Campout by Walheim and Schlegel




FLIGHT DAY 6
•EVA‐2 by Walheim and Schlegel (P1 Truss Nitrogen Tank Assembly Installation, Stowage of Old N2 Tank Assembly)
•Columbus Module Outfitting




FLIGHT DAY 7
• Columbus Module Racks and Systems Outfitting
• Off Duty Periods
• EVA‐3 Procedure Review •EVA‐3 Campout by Walheim and Love




FLIGHT DAY 8
•EVA‐3 by Walheim and Love (SOLAR and EuTEF Facility Installation, Failed Control Moment Gyroscope Transfer to Atlantis・Payload Bay)




FLIGHT DAY 9
•Shuttle and Station Transfers
•Joint Crew News Conference
ISS Reboost
•Columbus Module Outfitting
•Farewells and Hatch Closure




FLIGHT DAY 10
•Undocking from Harmony Node 2/Pressurized Mating Adapter‐2 and Flyaround
•Final Separation from the International Space Station •OBSS Unberth and Late Inspection of Atlantis's Thermal Protection System
•OBSS Final Berthing




FLIGHT DAY 11
•Cabin Stow •Flight Control System Checkout
•Reaction Control System Hot‐Fire Test
•Crew Deorbit Briefing •Launch and Entry Suit Checkout •Recumbent Seat Set Up for Tani
•Ku‐Band Antenna Stow





FLIGHT DAY 12
•Deorbit Preparations
•Payload Bay Door Closing
•Deorbit Burn
•Kennedy Space Center Landing



横浜チャイナタウン「2008春節
獅子舞が各店舗を回り、店頭に吊るされた御祝儀(採青)をとり、おめでとうと商売繁栄を祈る春節伝統行事
http://www.chinatown.or.jp/news/shunsetsu08/


"旧暦大みそかの6日夜、「NHK紅白歌合戦」にあたる
中国中央電視台(CCTV)の旧正月年越し番組『春節聯歓晩会』"
 [中国情報局]
http://news.searchina.ne.jp/disp.cgi?y=2008&d=0207&f=entertainment_0207_001.shtml


ブット氏暗殺で容疑者2人逮捕=イスラム武装勢力と関連か
"【ニューデリー7日時事】パキスタン当局は7日、野党指導者ブット元首相暗殺に絡んで男2人を首都イスラマバード近郊のラワルピンディで逮捕
当局は、対アフガニスタン国境の部族地域・南ワジリスタン地区のイスラム武装勢力指導者、バイトゥッラー・メフスード容疑者が事件に関与したとみている。" AFP通信
http://headlines.yahoo.co.jp/hl?a=20080207-00000181-jij-int








Progress 28 (P28) docked ISS

"The Progress M-63 space freighter:
The automatic docking with the orbital station has been set for 2:38 p.m. GMT on February 7." - RIA Novosti - Russia
http://en.rian.ru/russia/20080205/98376575.html





VOA News
"NASA: Bad Weather Could Delay Shuttle Launch"
http://voanews.com/english/2008-02-05-voa40.cfm


STS-122 : Shuttle Atlantis
Launch Time: 2:45 p.m.
EST日本時間 2月8日 4時45分

STS-122 Interactive timeline
STS-122: Interactive Mission Timeline
http://www.nasa.gov/externalflash/STS122_flash/
Schedule 12days
国際宇宙ステーションの組立フライト 1E(STS-122)JAXA
http://iss.jaxa.jp/iss/1e/index.html


Feb. 7, Thursday
5:15 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)



Date: Feb. 7
Mission: STS-122
Launch Vehicle: Space Shuttle Atlantis
Launch Site: Kennedy Space Center - Launch Pad 39A
Launch Time: 2:45 p.m. EST
Description: STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.
━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛


Feb. 7, Thursday
5:30 a.m. - STS-122 Fueling Coverage Begins - KSC (All Channels)
9:15 a.m. - ISS Progress 28 Docking Coverage (Docking is scheduled for 9:33 a.m.) - JSC (Public and Media Channels)
9:45 a.m. - STS-122 Launch Coverage Begins - KSC (All Channels)
2:45 p.m. - STS-122 Launch (All Channels)

March 4, Tuesday
9 a.m. - 3 p.m. - STS-123 Preflight Briefings - JSC (Public and Media Channels)

April 3, Thursday
9 a.m. - 3 p.m. - STS-124 Preflight Briefings - JSC


━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛━┛
次のSTS-123「エンデバー
3月